Date submitted2023-11-10
-
Date accepted2024-05-02
-
Date published2024-08-26
Paleoproterozoic Saltakh Pluton, Anabar Shield: mineralogical composition, age and a geodynamic setting
- Authors:
- Nikolai I. Gusev
- Lyudmila Yu. Romanova
The Saltakh Massif is located in the northern Anabar Shield, in the Saltakh shear-zone. It consists of two-pyroxene schists and plagiogneisses metamorphosed under granulite-facies conditions. Their chemical composition is consistent with that of a differentiated series of rocks ranging from gabbro to tonalites with abundant alaskitic gneissose granite veins and bodies. The rocks are mainly high-potassium (K2O/Na2O > 0.50), high-magnesium (mg# 50-70), low-titanium (TiO2 0.35-1.31 wt.%) with low TiO2 concentration in clino- and orthopyroxene. Normative olivine makes up 6-9 % of metagabbroic rocks. The rocks display well-defined negative Ti, Nb, Ta, and P anomalies typical of subduction magmatism. The two-pyroxene gneisses show high Sr/Y ratios of 67.6-88 and (La/Yb)N of 24.8-25.6. Saltakh rocks are part of a shoshonite series, as indicated by Nb/La, La/Yb, Th/Nb and Ce/Yb ratios. All the rocks display positive εNd(T) values of 1.9-4.1 and εSr(T) of 0.77-17.8 indicative of a mantle source of magma and T(Nd)DM of 2,20-2,26 Ga. U-Pb zircon dating (SHRIMP II) has shown that the protoliths of Saltakh melanocratic rocks were dated at 2100-2086 Ma, and those of two-pyroxene plagiogneisses of tonalite composition were dated at 2025±7 Ma. Alaskitic gneissose granites were dated at 1969±7 Ma. The study of the trace element composition of zircon has revealed general enrichment in LREE. High LREE concentrations are due to secondary zircon alterations and the shoshonitic pattern of the melt, the high-temperature conditions of crystallization, and an anomalous fluid regime. The geodynamic setting in which the Saltakh Massif was formed was consistent with a pericontinental magmatic arc. The formation of alaskitic gneissose granites was due to anatexis provoked by later collision processes. Saltakh magmatic rocks were formed simultaneously with magmatic rocks from the Khapchan prospect which occur farther south, and were studied earlier (2095±10 Ma tholeiitic metadiorites and 2030±17 Ma calc-alkaline metatonalites). We interpret them as part of a metamorphosed juvenile Paleoproterozoic suprasubduction complex.
-
Date submitted2022-06-27
-
Date accepted2023-06-20
-
Date published2023-12-25
Analysis of the problems of high-quality drinking water extraction from underground water intakes on Vysotsky Island in the Vyborg district of the Leningrad region
This article presents the results of drilling, experimental filtration work and laboratory studies aimed at assessing the resources and quality of groundwater in the licensed area of Vysotsky Island located in the Leningrad region, in the Gulf of Finland in accordance with the requirements of regulatory documents. Analysis of the results of hydrochemical studies and their comparison with data on water intakes in adjacent areas gives the right to conclude that it is possible to classify a hydrogeological unit as a different type of resource formation than those located in the surrounding areas. Groundwater in this area is confined to an unexplored deep fractured regional high-pressure zone. According to the received data, the explored water intake can be attributed to a unique groundwater deposit, which has an uncharacteristic composition of groundwater in the north of the Leningrad region, which may be due to the mixing of modern sediments and relict waters of the Baltic glacial lake. The stability of groundwater characteristics is confirmed by long-term monitoring.
-
Date submitted2022-09-30
-
Date accepted2023-02-13
-
Date published2023-04-25
Hydrogeoecological conditions of technogenic groundwater in waste disposal sites
The specific hydrogeoecological conditions of aquifers of some technogenic formations, mainly iron ore skarn-magnetite and titanium-magnetite formations, are considered. The resulting wastes, which are stored in waste disposal sites during development of deposits, due to the impact of a number of factors (natural and technogenic) form technogenic waters. Waste disposal facilities are complex engineering structures (dumps and sludge storages), which in turn create their own hydrogeoecological conditions, which must be investigated in order to prevent and minimize environmental and economic damage caused by these objects to the aquatic environment. The paper presents long-term field and laboratory studies of the aquatic environment under the influence of a waste disposal facility in the Middle Urals – one of the largest tailings, representing a potential environmental and man-made hazard. This tailing dump contains tens of tons of waste – enrichment tailings and creates specific hydrogeoecological conditions on the territory. Based on many years of monitoring studies, an analysis of these conditions was carried out – the quality of groundwater affected by the tailings was assessed. It is shown that groundwater is of technogenic nature, i.e. are man-made waters that have a significant impact on the surface and underground hydrospheres of the territory.
-
Date submitted2021-12-16
-
Date accepted2022-04-07
-
Date published2022-07-13
The Upper Kotlin clays of the Saint Petersburg region as a foundation and medium for unique facilities: an engineering-geological and geotechnical analysis
- Authors:
- Regina E. Dashko
- Georgiy A. Lokhmatikov
The article reviews the issues concerned with correctness of the engineering-geological and hydrogeological assessment of the Upper Kotlin clays, which serve as the foundation or host medium for facilities of various applications. It is claimed that the Upper Kotlin clays should be regarded as a fissured-block medium and, consequently, their assessment as an absolutely impermeablestratum should be totally excluded. Presence of a high-pressure Vendian aquifer in the lower part of the geological profile of the Vendian sediments causes inflow of these saline waters through the fissured clay strata, which promotes upheaval of tunnels as well as corrosion of their lining. The nature of the corrosion processes is defined not only by the chemical composition and physical and chemical features of these waters, but also by the biochemical factor, i.e. the availability of a rich microbial community. For the first time ever, the effect of saline water inflow into the Vendian complex on negative transformation of the clay blocks was studied. Experimental results revealed a decrease in the clay shear resistance caused by transformation of the structural bonds and microbial activity with the clay’s physical state being unchanged. Typification of the Upper Kotlin clay section has been performed for the region of Saint Petersburg in terms of the complexity of surface and underground building conditions. Fissuring of the bedclays, the possibility of confined groundwater inflow through the fissured strata and the consequent reduction of the block strength as well as the active corrosion of underground load-bearing structures must be taken into account in designing unique and typical surface and underground facilities and have to be incorporated into the normative documents.
-
Date submitted2022-01-24
-
Date accepted2022-04-26
-
Date published2023-04-25
Forecast of radionuclide migration in groundwater of the zone affected by construction drainage at the Leningrad NPP-2
The distribution of natural (at the level of global background) and technogenic radionuclides in groundwater of the industrial zone in Sosnovy Bor town, where several nuclear power facilities are operating, was analyzed. The main technogenic radionuclides recorded in groundwater samples are cesium ( 137 Cs), strontium ( 90 Sr), and tritium isotopes. The first two aquifers from the surface are subject to contamination: the Quaternary and the upper zone of the Lomonosov aquifer. Based on extensive material on the engineering and geological studies of the work area, a 3D geological model and hydrodynamic and geomigration models of the industrial zone were constructed. By means of modeling, the extent and nature of changes in hydrogeological conditions of area resulting from the construction and operational drainage of the new stage of the Leningrad Nuclear Power Plant (LNPP-2) were determined. The “historical” halo of radioactive contamination of groundwater forming (1970-1990) at the site adjacent to the NPP, where the storage facility of low- and medium-level radioactive waste is located, falls into the zone of influence. Interpretation of monitoring data allowed obtaining the migration parameters for predictive estimates. Modeling has shown that during the time of the LNPP-2 operation there was no intake of contaminated water by the drainage system of the new power plant.
-
Date submitted2021-06-08
-
Date accepted2021-11-30
-
Date published2021-12-27
Management of groundwater resources in transboundary territories (on the example of the Russian Federation and the Republic of Estonia)
Groundwater, as a source of water supply, the most important mineral and geopolitical resource, , is often the only source of high-quality drinking water that is protected from pollution under conditions of increasing deterioration of surface water quality. Transboundary groundwaters are the focus of hydrogeological researchers for a number of reasons, including the reduction and pollution of water resources as a result of economic activities. The increased controversy between states over transboundary water issues has necessitated the development of international legal documents on issues related to water conflict prevention and the sustainable use of fresh water. As part of the analysis of the problem of legal regulation of groundwater extraction from transboundary aquifers and complexes, it is proposed to consider this aspect on the example of Russia. The problems of regulation of rational use and protection of fresh water in the bilateral treaties of the Russian Federation were revealed; a methodology for the management of groundwater extraction in the territory of the transboundary aquifer was developed, the size, parameters, and factors influencing the formation of the transboundary zone have been determined (based on research and analysis of water intake activities in the border areas of the Russian Federation and the Republic of Estonia) were determined.
-
Date submitted2021-03-16
-
Date accepted2021-07-27
-
Date published2021-10-21
Allocation of a deep-lying brine aquifer in the rocks of a chemogenic section based on the data of geophysical well logging and 2D seismic exploration
Advancement in the production of potassium fertilizers is an important strategic task of Russian agricultural industry. Given annually growing production rates, the reserves of discovered potassium-magnesium salt deposits are noticeably decreasing, which creates the need to ensure stable replenishment of the resource base through both the discovery of new deposits and the exploitation of deep-lying production horizons of the deposits that are already under development. In most cases, deposits of potassium-magnesium salts are developed by underground mining. The main problem for any salt deposit is water. Dry salt workings do not require any additional reinforcement and can easily withstand rock pressure, but with an inflow of water they begin to collapse intensively – hence, special attention is paid to mine waterproofing. Determination of spatial location, physical and mechanical properties of the aquifer and water-blocking stratum in the geological section represent an important stage in the exploration of a salt deposit. The results of these studies allow to validate an optimal system of deposit development that will minimize environmental and economic risks. On the territory of Russia, there is a deposit of potassium-magnesium salts with a unique geological structure – its production horizon lies at a considerable depth and is capped by a regional aquifer, which imposes significant limitations on the development process. To estimate parameters of the studied object, we analyzed the data from CDP seismic reflection survey and a suite of methods of radioactive and acoustic well logging, supplemented with high-frequency induction logging isoparametric sounding (VIKIZ) data. As a result of performed analysis, we identified location of the water-bearing stratum, estimated average thickness of the aquifers and possible water-blocking strata. Based on research results, we proposed methods for increasing operational reliability of the main shaft in the designed mine that will minimize the risks of water breakthrough into the mine shaft.
-
Date submitted2020-11-20
-
Date accepted2021-03-30
-
Date published2021-06-24
Petrochemical features of tholeiites from the Shaka ridge (South Atlantic)
The article presents original data of chemical composition of tholeiitic basaltoids and andesites, dredged from the Shaka Ridge (South Atlantic) in the course of field research in spring 2016 on the scientific expedition vessel “Akademik Fedorov”. The analytical part of the work on estimating the contents of petrogenic, trace and rare-earth elements was carried out using the classical method (“wet chemistry”), X-ray fluorescence analysis (XRF) and inductively coupled plasma mass spectrometry (ICP-MS). The studied samples demonstrate elevated concentrations of large-ion lithophile elements, or LILE, (Ba, Rb, Pb) and light rare earth elements, or LREE, (La, Ce, Nd, Sm) relative to high field strength elements, or HFSE, (Nb, Ta) and heavy rare earth elements, or HREE, (Dy, Yb, Lu). The specifics of trace element geochemistry suggest a significant contribution of crustal or subduction components to the magmas of the Shaka Ridge. Discrimination diagrams of basaltoids and allied rocks with fields of different geodynamic settings indicate that they were formed in the setting of the mid-ocean ridge basalt (MORB). The reason behind the appearance of subduction and crustal marks in the rocks is possibly associated with assimilation of crustal matter by magmas or lies in their inheritance from the mantle source.
-
Date submitted2020-11-16
-
Date accepted2021-03-02
-
Date published2021-04-26
Determination and verification of the calculated model parameters of salt rocks taking into account softening and plastic flow
The article suggests using a combination of the modified Burgers model and the Mohr – Coulomb model with the degradation of the adhesion coefficient and the increase in the friction coefficient to determine the parameters of salt rocks. A comparative analysis of long-term laboratory tests and field observations in underground mine workings with the results obtained using a calculated model with certain parameters is carried out. The parameters of the Mohr – Coulomb model with the degradation of the adhesion coefficient and the increase in the friction coefficient were obtained from the statistically processed data of laboratory tests, and the parameters of the modified Burgers model were determined. Using numerical methods, virtual (computer) axisymmetric triaxial tests, both instantaneous and long-term, were performed on the basis of the proposed model with selected parameters. A model problem is solved for comparing the behavior of the model with the data of observation stations in underground mine workings obtained from borehole rod extensometers and contour deformation marks. The analytically obtained coefficients of the nonlinear viscous element of the modified Burgers model for all the analyzed salt rocks did not need to be corrected based on the monitoring results. At the same time, optimization was required for the viscoelastic element coefficients for all the considered rocks. The analysis of the model studies showed a satisfactory convergence with the data on the observation stations. The comparative analysis carried out on the models based on laboratory tests and observations in the workings indicates the correct determination of the parameters for salt rocks and the verification of the model in general.
-
Date submitted2019-04-30
-
Date accepted2019-07-16
-
Date published2019-10-23
Salt Rock Deformation under Bulk Multiple-Stage Loading
- Authors:
- I. L. Pankov
- I. A. Morozov
The paper presents experimental justification of the possibility to use bulk multiple-stage loading to study the process of salt rock deformation in the laboratory conditions. Results of comparative tests between bulk multiple- stage and single-stage loading of salt rock samples are demonstrated. The paper contains results of research on the rate of lateral pressure and its impact on strength limit and residual strength limit of sylvinite, estimated using single- stage and multiple-stage methods. Research results demonstrate how the rate of lateral pressure impacts dilatancy boundary of salt rocks. Analysis of how the loading method influences certificate parameters of Mohr-Coulomb strength of sylvinite has been carried out. The dynamics of elastic modulus in the process of salt rock deformation is analyzed depending on the rate of lateralpressure. It is demonstrated how the method of multiple-stage loading adequately reflects the processes of salt rock de- formation and decomposition, and facilitates not only lowering impact of sample’s inner structure heterogeneities on the experimental results, but also significant reduction in the required amount of rock material.
-
Date submitted2016-10-30
-
Date accepted2017-01-02
-
Date published2017-04-14
Result of combining data from impulse electrical prospecting and aeromagnetic prospecting for groundwater exploration in the south of Yakutia
In 2014 in the south of Yakutia in the course of groundwater exploration works a complex of geophysical methods was tested: aeromagnetic and electrical prospecting was carried out using near-field transient sounding and electromagnetic sounding with induced polarization. Prospective structures for hydrogeological drilling are zones of discontinuous tectonic faults. In order to identify them, data from aeromagnetic and electrical prospecting were used. Results of drilling confirmed the presence of watered areas; however, analysis of obtained information allowed to come to the conclusion that the amount of water in the faults has no direct connection to electrical conductivity.
-
Date submitted2015-12-08
-
Date accepted2016-02-20
-
Date published2016-12-23
The ways of transformation of salt production from the saline lakes of Apsheron peninsula
- Authors:
- V. A. Mamedov
- Kh. Kh. Khalilova
The issues of salt production at salt lakes of Apsheron Peninsula in Azerbaijan are reviewed here. The paper objective is to examine the brine formation process and analyze the ways of transformation of salt extraction from the lakes of Apsheron Peninsula under ever increasing industrial development and urbanization. The research on ecological state of salt lakes at the peninsula have shown that the decades-long development of oil and gas and other industries had a dramatical impact on the natural properties of water resources in this area. Laboratory test revealed high concentrations of total hydrocarbons, phenols, toxic metals (Cd, Pb, Zn, Ni, Cu, V, Mo, etc.), surface-active suspended solids and other pollutants in water samples of salt lakes. The paper presents physical and chemical properties of Boyukshore Lake, which for many years was the republic’s primary source of cooking salt. Based on comparative analysis of obtained properties with the maximum allowable concentrations and international standards the level of pollution of natural salt lakes of Apsheron has been assessed and the contribution of each anthropogenic source to the pollution of these water bodies has been determined. The paper presents quantitative and qualitative properties and pictures of the lakes depicting formation of saline deposits and volumes of salt produced at brine lakes of Apsheron. It has been established that decades-long negative impact on the environment led to disruption of ecological balance of the open waters in the region. Most saline lakes in the peninsula lost their natural qualities and became unsuitable for salt production.
-
Date submitted2015-12-19
-
Date accepted2016-02-08
-
Date published2016-12-23
A technique for selective extraction of ions of gold and silver from hydrochloric solutions with tributylphosphate
- Authors:
- L. A. Voropanova
- N. B. Kokoeva
Extraction is studied by tributylphosphate (TBP) of ions of gold and silver from hydrochloric solutions during the portional and single time feed of extractant in dependence of the initial concentration of metal ions, temperature, concentration of hydrochloric acid, the ratio of organic (О) and water W phases О:W. The initial solutions contained soluble complex chlorides of gold and silver. When dissolving metal chlorides in the solution of common salt and hydrochloric acid, water soluble coordinate compound are formed that contain complex anions [AuCl 2 ] – , [AuCl 4 ] – , [AgCl 2 ] – , [AgCl 3 ] 2– , [AgCl 4 ] 3– , et al. As an extractant we used the tri-butyl ether of phosphoric acid (С 4 Н 9 О) 3 РО hat belongs to oxygen containing neutral extractants. The formation of coordinate (complex) compounds of TBP and metal polychlorides may be treated as the process of solvation of the extracted metal salt by the extractant. For selective extraction of ions of gold and silver from their hydrochloric solutions by tributylphosphate it is run feeding the extractant portionally to the solution at the minimal time of contact between the solution and the extractant; it helps extracting gold almost completely with the few first portions of the extractant at concentrations of 2n HCl 240 g/dm 3 NaCl and the temperature t = 60°С. Meanwhile the extraction of silver is kept to a minimum. Silver is extracted almost completely after the extraction of gold is over; it is done with tributylphosphate as well at concentrations of 3n HCl, 240 g/dm 3 NaCl and the temperature t = 20°С.
-
Date submitted2015-10-11
-
Date accepted2015-12-13
-
Date published2016-08-22
The specifics of operating minor deposits (as given by the examples of gas condensate deposits of the Northern Caucasus)
- Authors:
- R. A. Gasumov
One of the most important directions in upgrading well productivity in the process of mining hydrocarbons consists in fighting with salt formation and salt deposition. Solving that problem becomes especially actual when operating deposits that are in their final stage of exploitation in complex mining and geological conditions accompanied by deposition of salts in the well foot area of oil bed and their sedimentation on the sub-surface and surface equipment. It provokes a drop in well productivity and results in off-schedule repair works. Specifics are considered of exploiting minor gas condensate deposits of the Northern Caucasus that are operated under complicated mining and geological conditions of anomalously high bed pressures, high temperatures, strong depressions on the beds and inflow of mineralized water from water saturated seams. Processes are studied of salt deposition from heavy hydrocarbons in the well foot and the bed area surrounding it. Water sample analyses data from different wells have demonstrated that the main salts carrier is the associated water, and the principal sedimenting agents are corrosion products, as confirmed by the results of microscopic studies. The dynamics is presented of salt deposition in the “well foot – wellhead – separator” system retrieved from the results of studies of reaction products in the well foot zone of oil bed. It is demonstrated that the efficiency of struggling with salt deposition in the course of mining hydrocarbons depends on comprehensive approach to the problem, the principal thrust lying with prevention of such deposition. Possible ways are considered to prevent precipitation of ferric compounds in the course of operating gas condensate wells, a way is suggested to intensify gas inflow.
-
Date submitted2015-07-14
-
Date accepted2015-09-09
-
Date published2016-02-24
Engineering and geomechanical forecast for waste disposal in underground caverns including earthquake-prone zones
- Authors:
- O. V. Kovalev
The article aims at obtaining representative scientifically based data to determine parameters of a necessary-safe condition of the rock massif (RM) in underground waste diposal caverns zones, including earthquake-prone zones. The main requirements for underground caverns for hazardous waste disposal and for their construction technology are described. The subject of the research is underground solution caverns in halogen rocks. Data for justification of safe waste disposal conditions in underground salt caverns and its stages are presented. A complex approach to the solution of the research problem is described. The main aspects of dynamic influence of seismic waves on underground caverns stability are considered. Taking into account seismic-risk zoning data on the research region some significant parameters of a possible seismic impact on the experimental cavern are calculated. The article points out the necessity of superincumbent rock and surface displacement assessment for the experimental site zone using the suggested complex approach and including the analysis of surveying data and results of rock mass geomechanical modeling.
-
Date submitted2014-11-07
-
Date accepted2015-01-07
-
Date published2015-10-26
The concept of reducing the risks of potash mines flooding caused by groundwater inrush into excavations
- Authors:
- V. P. Zubov
- A. D. Smychnik
Results of the analysis of factors influencing the probability of accidental groundwater inrush into mine workings of salt (potash, potassium and magnesium) mines are given in the article. The cases of the potash mine flooding that occurred in different countries with developed mining industry are given. It is shown that at the present technical and scientific level of solving this problem the unexpected groundwater inrush in potash mines usually results in the shutdown of the enterprise and negative ecological consequences. It is pointed out that the underground waters flow into the mines through water-conducting fractures of either natural or technogenic origin which location and influence on a mine was almost impossible to predict at the design stage under existing regulations. The concept of reducing the risks of potash mine flooding caused by underground waters in-rush is formulated. Administrative and technical measures which allow reducing the risks of potash mine flooding caused by groundwater inrush into the excavations are considered.
-
Date submitted2014-11-29
-
Date accepted2015-01-09
-
Date published2015-10-26
G.V.Bogomolov and his role in development of national hydrogeology
- Authors:
- D. L. Ustyugov
- L. P. Norova
In March 2015 the scientific community celebrated the 110th anniversary of the birth of one of the founders of the hydrogeological and engineering-geological school, an honouree of State Award of the USSR and the Byelorussian SSR, Academician Gerasim Vasilyevich Bogomolov. The article is devoted to several important stages of the development of Russian hydrogeology, which are primarily associated with the research conducted by G.V.Bogomolov. His role in the development of hydrogeology in Belarus, i.e. theory and practice of the use of groundwater, is emphasized. This article is about the man who was a brilliant geologist, scholar, lecturer and an outstanding research manager. G.V.Bogomolov founded a school of disciples and followers who continued to develop and put into practice the academician’s ideas in various branches of geological theory and practice.
-
Date submitted2014-06-23
-
Date accepted2014-09-15
-
Date published2014-12-22
Topical issues of the management of extraction of underground waters on the territory of the Russian Federation
- Authors:
- N. V. Pashkevich
- E. I. Golovina
Water is a key component of our environment; it is a renewable, limited and vulnerable natural resource, which provides for the economic, social, and environmental well-being of the population. The modern system of taxation and regulation of subsoil use in the extraction of groundwater is currently imperfect and has definite disadvantages, among them not enough control of natural resources by the state, the commercialization stage of licensing, and the budget deficit, which is passed on to other areas of the national economy. General information about the state of the underground water supply in Russia, and the negative trends of underground water use are presented. The system of licensing underground water intakes in Germany is briefly described; some measures to improve the system of man-agement of Russia’s underground waters fund are suggested.
-
Date submitted2014-07-21
-
Date accepted2014-09-19
-
Date published2014-12-22
Preliminary preparation of oil for primary processing
Oil supplied for primary processing always undergoes preliminary preparation, the purpose of which is to eliminate the harmful effect of water and salt contained in the oil. It is thought that corrosion of the equipment is connected mainly with chlorides of magnesium and calcium, which are subjected to hydrolysis with the formation of hydrochloric acid. Under the influence of hydrochloric acid the destruction (corrosion) of metal equipment at technological plants occurs (especially refrigerating-condensing and heatexchange equipment, furnaces of rectification units etc.). The authors of the article, on the basis of thermodynamic calculations, provide their point of view on this process and give a methodology by which the process of preliminary oil dehydration and desalting can be controlled. The thermodynamic calculations executed for standard conditions on the basis of refer-enced data confirm a high probability of chemical interaction of iron with hydrogen ions, hy-drogen sulphide and especially with carbonic acid. This testifies to high activity of the carbon dioxide dissolved in water and the impossibility of hydrolysis of ions of magnesium, calcium and iron. The calculations show that only the hydrolysis of magnesium chloride is possible tak-ing into account the ionic composition of the water phase in the oil. It should be noted that the presence of ions of chlorine shifts the iron potential in a nega-tive direction and increases the speed of corrosion of petrochemical equipment. The solution of this problem is in the development of modern methods of crude oil dehydration and desalting. It is also, however, in an intensification of the processes of mixing water-oil emulsions with wash-ing water by using various physical fields (for example, ultrasound) and creating new effective mixing devices on the basis of them.
-
Date submitted2013-07-20
-
Date accepted2013-09-04
-
Date published2014-03-17
Some approaches to secure mining of potash deposits
- Authors:
- O. V. Kovalev
- S. P. Mozer
The basic aspects of safe mining of potash deposits is reviewed. Practical examples of the mechanism and possible consequences of violating the integrity of the waterproof rock strata are described. Use of remote non-destructive monitoring system for non-destructive integrity breeds of the waterproof rock strata is proposed.
-
Date submitted2013-07-07
-
Date accepted2013-09-17
-
Date published2014-03-17
Ways of improving waste disposal in the workings of salt mines
- Authors:
- O. V. Kovalev
- S. P. Mozer
Address the major aspects of waste disposal in underground space. Are key problems of isolation of wastes in underground salt deposits? Proposed waste disposal technology, based on the use of waste for immobilization of natural mineral salts.
-
Date submitted2009-09-12
-
Date accepted2009-11-03
-
Date published2010-06-25
One variant of boundary element method application to calculation of bearing pressure on conditions to coal and salt deposits
- Authors:
- L. A. Bespalov
- A. P. Gospodarikov
The analysis of stress-strain state near excavations was carried out in this work as applies to coal and salt deposits. The indirect boundary element method was used as a tool of research.
-
Date submitted2009-08-02
-
Date accepted2009-10-10
-
Date published2010-02-01
The analyses of influence of goafs on the state of developmental excavations as applies to Starobinsky potassium salt deposit
- Authors:
- A. P. Gospodarikov
- L. A. Bespalov
The analysis of stress-strain state near excavations and influence of goafs on its redistribution were carried out in this work as applies to coal and salt deposits. The indirect boundary element method was chosen as a tool of research.
-
Date submitted2009-08-13
-
Date accepted2009-10-09
-
Date published2010-02-01
Research of the probability of sudden salt rock outbursts on the basis of measuring of their volume shrinkage
- Authors:
- Yu. G. Sirenko
- A. V. Brovko
- A. A. Sankovskii
The article is devoted to research of probability of sudden salt rocks outbursts on the basis of measuring of their volume shrinkage. The design scheme of the device for measuring quantity of the microincluded gases in rocks is proposed. Criteria to estimate the possibility of sudden salt rocks outbursts is revealed.
-
Date submitted2009-07-12
-
Date accepted2009-09-08
-
Date published2010-04-22
Account and movement of reserves in the information system of Silvinit co.
- Authors:
- A. V. Kataev
- S. N. Kutovoi
- E. M. Efimov
- M. V. Gilev
At ore mines of the Silvinit Co. for accounting and movement of reserves are developed and used special tools, using GIS within the information system. Their use allows to automate accounting and monitoring of status and movement of stocks, including the formation of the reporting tables.