Submit an Article
Become a reviewer

Search articles for by journal section:
Инновационные направления в проектировании горно-добывающих предприятий

Innovation in designing of mining plants
  • Date submitted
    2012-12-12
  • Date accepted
    2013-02-09
  • Date published
    2013-12-23

Choice of design decisions on development of fields taking into account results of geodynamic division into districts and geometrizations of dangerous zones

Article preview

Data on use of information on block structure, geodynamic and geomechanical condition of the massif of rocks are given in article at design of development of layers of coal fields. It is recommended to carry out geodynamic division into districts and to consider results of researches in the course of design of mountain works at different stages of development of a field with allocation of three large-scale levels.

How to cite: Shabarov A.N., Zubkov V.V., Krotov N.V., Podosenov A.A., Marshak N.A. Choice of design decisions on development of fields taking into account results of geodynamic division into districts and geometrizations of dangerous zones // Journal of Mining Institute. 2013. Vol. 205. p. 66.
Innovation in designing of mining plants
  • Date submitted
    2012-12-28
  • Date accepted
    2013-02-22
  • Date published
    2013-12-23

For the anniversary of B.F.Bratchenko

Article preview

Memory B.F.Bratchenko

How to cite: konferentsii O. For the anniversary of B.F.Bratchenko // Journal of Mining Institute. 2013. Vol. 205. p. 64.
Innovation in designing of mining plants
  • Date submitted
    2012-12-29
  • Date accepted
    2013-03-02
  • Date published
    2013-12-23

Methodical maintenance of calculation parameters of pillars when developing coal-bed dangerous on rockburst

Article preview

The design procedure parameters of system of pillars of when developing coal-bed dangerous on rockburst. Recommendations about a choice of parameters of pillars are provided for example the preparation of protective seams Fifth and Fourth on JSC «Vorkutaugol» mines.

How to cite: Sidorov D.V. Methodical maintenance of calculation parameters of pillars when developing coal-bed dangerous on rockburst // Journal of Mining Institute. 2013. Vol. 205. p. 145.
Innovation in designing of mining plants
  • Date submitted
    2012-12-25
  • Date accepted
    2013-02-24
  • Date published
    2013-12-23

Principles of construction and realization of multifunction systems of safety at coal mines for providing control of -stress-strain state of rock mass

Article preview

The Article contains the scheme for realization of monitoring observations for changes in geodynamic state of rock mass and variants of application of active methods for control of stress-strain state in hazardous zones being formed during mining operations.

How to cite: Vernigor V.M., Shabarov A.N., Krotov N.V., Arshavskii V.V. Principles of construction and realization of multifunction systems of safety at coal mines for providing control of -stress-strain state of rock mass // Journal of Mining Institute. 2013. Vol. 205. p. 141.
Innovation in designing of mining plants
  • Date submitted
    2012-12-02
  • Date accepted
    2013-03-01
  • Date published
    2013-12-23

On approaches to designing of thermal regime at ore mines under permafrost conditions

Article preview

Consideration is given to the problem of control of thermal regime at ore mines, where mining operations are carried out within the permafrost massif both in normal situation and in the case of accident. Technical solutions were suggested, providing safe conditions of work by temperature factor in normal situation, and also allowing to save life of miners, and to produce suitable conditions for liquidation of appeared accident.

How to cite: Vernigor V.M., Morozov K.V., Bobrovnikov V.N. On approaches to designing of thermal regime at ore mines under permafrost conditions // Journal of Mining Institute. 2013. Vol. 205. p. 139.
Innovation in designing of mining plants
  • Date submitted
    2012-12-05
  • Date accepted
    2013-02-21
  • Date published
    2013-12-23

The method of potash salt interchamber pillars stability control

Article preview

The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.

How to cite: Baryakh A.A., Asanov V.A., Sanfirov I.A. The method of potash salt interchamber pillars stability control // Journal of Mining Institute. 2013. Vol. 205. p. 134.
Innovation in designing of mining plants
  • Date submitted
    2012-12-28
  • Date accepted
    2013-02-25
  • Date published
    2013-12-23

The problems of implementation and use of complex computer-aided design systems

Article preview

The article addresses the implementation and application of computer-aided design and engineering (CAD/CAE) software by engineering companies in the mining sector. The importance of the computer technology application for the company innovation activities is indicated. The report deals with the current situation and challenges faced by companies in the selection, implementation and application of advanced integrated computer-aided systems.

How to cite: Feoktistov A.Y., Skryabin I.N. The problems of implementation and use of complex computer-aided design systems // Journal of Mining Institute. 2013. Vol. 205. p. 130.
Innovation in designing of mining plants
  • Date submitted
    2012-12-24
  • Date accepted
    2013-02-04
  • Date published
    2013-12-23

Key approaches to the advance degassing of coal beds of the promising Kuzbass deposits

Article preview

The paper describes the main approaches to assess the geodynamic state rock mass in order to select the optimal location of the drillholes during the degassing of coal seams of promising fields of Kuzbass from the surface.

How to cite: Morozov K.V. Key approaches to the advance degassing of coal beds of the promising Kuzbass deposits // Journal of Mining Institute. 2013. Vol. 205. p. 125.
Innovation in designing of mining plants
  • Date submitted
    2012-12-01
  • Date accepted
    2013-02-28
  • Date published
    2013-12-23

Substantiation of parameters of the roof bolting for concrete service conditions

Article preview

In the report experience of application on collieries of the Russian Donbass acting «Instructions by calculation and application of the roof bolting on collieries of Russia» is stated and methods of a substantiation of parameters of the roof bolting for concrete service conditions are instanced.

How to cite: Chavkin A.I. Substantiation of parameters of the roof bolting for concrete service conditions // Journal of Mining Institute. 2013. Vol. 205. p. 119.
Innovation in designing of mining plants
  • Date submitted
    2012-12-11
  • Date accepted
    2013-02-26
  • Date published
    2013-12-23

Laboratory researches of filter-capacity parameters of coal with due account of phase-physical condition and stress-strain state

Article preview

The Article contains the results of researches of dynamics in changes of physical and mechanical properties of enclosing sedimentary rocks and hard coals of the Kuzbass and Vorkutsk deposits. The general condition of change in permeability factor on gas was obtained, depending on forms and types of moisture bonds in rocks and intensity of stress state. In the research tasks necessary for solving the problem of methane extraction, the methodological aspects are a matter of interest to study the processes of sorption-desorption in natural gassaturated coals. Study of the sorption characteristics of coal has shown that its sorption capacity depends on the stage of metamorphism within the whole studied range of saturation pressures.

How to cite: Karmanskii A.T., Ilinov M.D., Gizatulina I.N. Laboratory researches of filter-capacity parameters of coal with due account of phase-physical condition and stress-strain state // Journal of Mining Institute. 2013. Vol. 205. p. 108.
Innovation in designing of mining plants
  • Date submitted
    2012-12-05
  • Date accepted
    2013-03-01
  • Date published
    2013-12-23

Ways for providng safety in designing of intensive coal mining at the Kuznetsk basin

Article preview

Problems are generalized for the purpose of providing safety in coal deposits mining at the Kuzbass. It was shown that the basis for providing safety should be a complex of safety measures in corporating a repeat geodynamic zooming of the overall Kuzbass, individual deposits and mine fields, multiphase degassing at all stages of mining , and also the gaseous, seismic, hydrogeomechanical and electromagnetic monitoring at productive mines. It was suggested to work out safety regulations for providing safety during intensive coal mining not for each individual holding, but for the whole Kuzbass.

How to cite: Shabarov A.N., Tsirel S.V., Yutyaev E.P., Paltsev A.I. Ways for providng safety in designing of intensive coal mining at the Kuznetsk basin // Journal of Mining Institute. 2013. Vol. 205. p. 103.
Innovation in designing of mining plants
  • Date submitted
    2012-12-14
  • Date accepted
    2013-02-09
  • Date published
    2013-12-23

Rationale management regime on the companies who develop small deposits

Article preview

Given the material to establish a rational regime of mining operations in the development of small fields. A new method of study of rational treatment option with the mining operation the amount of current overburden coefficient for the entire period of mining the deposit.

How to cite: Roslavtsev Y.G., Fedorko V.P. Rationale management regime on the companies who develop small deposits // Journal of Mining Institute. 2013. Vol. 205. p. 100.
Innovation in designing of mining plants
  • Date submitted
    2012-12-11
  • Date accepted
    2013-02-25
  • Date published
    2013-12-23

Innovative technologies and problems of scientific and methodological provision of design decisions in mining coal layers in difficult mining and geological conditions

Article preview

The paper discusses the reasons for unsatisfactory design solutions for the existing and designed coal mines in Russia, as well as new innovative and scientific and methodological developments to improve performance of coal mines working in difficult geological conditions.

How to cite: Belikov V.V., Belikova N.V. Innovative technologies and problems of scientific and methodological provision of design decisions in mining coal layers in difficult mining and geological conditions // Journal of Mining Institute. 2013. Vol. 205. p. 93.
Innovation in designing of mining plants
  • Date submitted
    2012-12-04
  • Date accepted
    2013-02-18
  • Date published
    2013-12-23

Exploring and mining gassy coals

Article preview

This paper examines the issues of mining gassy coals. These cover a huge range of coal types, gas contents, permeabilities and diffusional behaviour. The key to understanding what approach to take to mining, is an understanding of the geology and the correct measurement of the important parameters. This must be followed by suitable interpretation and a flexible mining approach to dealing with the geology, geotechnical and reservoir conditions. The paper describes some of the techniques used in exploration to define these parameters.

How to cite: Grei I., Shelukhina Y.S. Exploring and mining gassy coals // Journal of Mining Institute. 2013. Vol. 205. p. 86.
Innovation in designing of mining plants
  • Date submitted
    2012-12-22
  • Date accepted
    2013-02-22
  • Date published
    2013-12-23

New objective laws of methane exhalation during intensive mining of shallow coal seams

Article preview

Natural observations and mathematical modeling of methane exhalation during increase of intensive mining in shallow coal seams have found that when excavation speed of coal area movement increases, process of methane desorption and its filter into atmosphere of working face is delayed. Discovered objective laws are subject to create scientific base to determine loading factor of highly productive working face, allowed as per gas ratio.

How to cite: Agafonov A.V., Ilyashov M.A., Kocherga V.N., Skipochka S.I., Krukovskaya V.V. New objective laws of methane exhalation during intensive mining of shallow coal seams // Journal of Mining Institute. 2013. Vol. 205. p. 77.
Innovation in designing of mining plants
  • Date submitted
    2012-12-06
  • Date accepted
    2013-02-10
  • Date published
    2013-12-23

Technical university for innovation development of Kuzbass

Article preview

The program of strategic development of T.F.Gorbachev Kuzbass State Technical University (KuzSTU) for the years of 2012-2020 Technical University for the Innovative Development of Kuzbass is reviewed. The KuzSTU development priorities are presented as follows: formation of innovative research university at the federal level, educational research and innovative modern university staff, innovative educational activities, scientific and staff provision of the long-term Program for Development of Coal Industry till the year of 2030; and effective scientific, engineering and technological support of the industrial development of Kuzbass; promotion of innovative projects into the actual sector of economy. The program for restructuring of the technical university is stated including new research and educational institutes and centers. It is shown that the solution of problems of the development of Kuzbass is not possible without the efficient generation of advanced and promising competences of specialists, as well as new knowledge and technologies of the global level.

How to cite: Kovalev V.A. Technical university for innovation development of Kuzbass // Journal of Mining Institute. 2013. Vol. 205. p. 70.
Innovation in designing of mining plants
  • Date submitted
    2012-12-13
  • Date accepted
    2013-02-16
  • Date published
    2013-12-23

Determination of a minimum permissible thickness of interstrata in undermining of a coal seam

Article preview

The Article presents the method for the determination of a minimum permissible thickness of rock interstrata, with which it is permissible to apply the steel-polymer roof bolts upon undermining of a coal seam. The method is based on the results of investigations of behavior of roof layers above the productive working with using the deep datum marks.

How to cite: Baranov S.G. Determination of a minimum permissible thickness of interstrata in undermining of a coal seam // Journal of Mining Institute. 2013. Vol. 205. p. 114.
Innovation in designing of mining plants
  • Date submitted
    2011-10-09
  • Date accepted
    2011-12-19
  • Date published
    2012-11-19

Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development

Article preview

Principles of complex monitoring of anthropogenic geomechanical processes of the operating mining enterprise on the basis of geo-information technology are developed. They allow to form and maintain digital geospatial model of mine development timely and effectively. In a mode of real time it allows to carry out geophysical and geomechanical monitoring of an undermine rocks and to plan and operate technological processes timely, to raise mining operation safety.

How to cite: Zakharova V.N., Arshavskii V.V., Kharchenko A.V. Monitoring and prognosis of anthropogenic and geomechanical processes in undermined rock mass in the process of mine development // Journal of Mining Institute. 2012. Vol. 198. p. 157.
Innovation in designing of mining plants
  • Date submitted
    2011-10-09
  • Date accepted
    2011-12-13
  • Date published
    2012-11-19

Safety problems of mining operations in high-stress hard rock massif

Article preview

Intensive development of large-scale deposits in high-stressed rock masses results in sharp activation of mining-induced processes in the earth depths and the surface thus initiates increasing of seismic activity in the mining area and hazard of rockbursts and mining-induced earthquakes. As reliable spatial-temporal prediction of dynamic events in the mines is problematic in the current state of methodology and geomechanical experiment technique, therefore, it is required to assess risks of  these events which scale determines corresponding preventive measures.

How to cite: Kozyrev A.A., Panin V.I., Fedotova Y.V. Safety problems of mining operations in high-stress hard rock massif // Journal of Mining Institute. 2012. Vol. 198. p. 150.
Innovation in designing of mining plants
  • Date submitted
    2011-10-11
  • Date accepted
    2011-12-06
  • Date published
    2012-11-19

Substantiation of the necessity of solving the problem of technogeneous deformation phenomena prevention in pit quarries and coal sections

Article preview

The article contains the examples of landslide phenomena in Russian Federation caused  by joint surface and underground mining and also underground slope undermining. Deformation processes occurred as a consequence of deficient and improper study of rock mass. Some examples of investigation of strength and deformation characteristics of the near-pit edge mass at one oreand one coal deposit with application of the combined surface and underground mining methods are given.

How to cite: Bryakov S.P. Substantiation of the necessity of solving the problem of technogeneous deformation phenomena prevention in pit quarries and coal sections // Journal of Mining Institute. 2012. Vol. 198. p. 144.
Innovation in designing of mining plants
  • Date submitted
    2011-10-16
  • Date accepted
    2011-12-15
  • Date published
    2012-11-19

Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit

Article preview

The paper presents the results of observations  of  stress-strain  state at  the Barentsburg coal deposit by means of the «Angel» equipment with the the purpose of detecting sections prone to manifestation of dynamic forms of rock pressure. The investigated sections of mine field were flooded for a long time, therefore after drainage the original cycles of geophysical measurements have  been  conducted  at all development workings and at production face by applying recording techniques for natural electromagnetic emission, recording of background component of natural electromagnetic field of the Earth, seismoacoustic emission (shock) and seismoacoustic emission (natural), pulsed by points (profiles)  along  the  workings. Parallel with geophysical observations measurements with KDM-1 device were made and visual ob- servations were carried out.

How to cite: Shvankin M.V., Mulev S.N., Skakun A.P., Rabota E.N. Experience in application of geophysical methods for stress-strain state of rock mass control with the goal of altering design solutions in liquidation the flooding of the emergency section of mine № 1-5 of the Barentsburg coal deposit // Journal of Mining Institute. 2012. Vol. 198. p. 137.
Innovation in designing of mining plants
  • Date submitted
    2011-10-22
  • Date accepted
    2011-12-03
  • Date published
    2012-11-19

Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk»

Article preview

One of the reasons for restraint of the innovative development at mining plants is lagging behind mining machinery-building. OJSC «Knauf Gips Novomoskovsk» plant, where the transition to modern driving equipment and revision of parameters of blasting operations have been performed is an example of successful implementation of innovative approach.

How to cite: Kovtun Y.V. Some results of innovations in mining at the OJSC «KNAUF GIPS Novomoskovsk» // Journal of Mining Institute. 2012. Vol. 198. p. 134.
Innovation in designing of mining plants
  • Date submitted
    2011-10-12
  • Date accepted
    2011-12-10
  • Date published
    2012-11-19

To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine

Article preview

Factors complicating drifting processes and barring in situ, disintegrated by tectonic burst- ing are considered. The analysis of stress-strain state formation of rock massif in the vicinity of tectonic disturbance is presented and practical recommendations concerning drifting and barring are given.

How to cite: Zvezkin V.A., Karelin V.N., Mushtekenov T.S. To the question of maintenance of permanent workings ventilation-waste floor in techtonic stressed zones «Big Gorst» of «Taimyr» mine // Journal of Mining Institute. 2012. Vol. 198. p. 131.
Innovation in designing of mining plants
  • Date submitted
    2011-10-12
  • Date accepted
    2011-12-25
  • Date published
    2012-11-19

Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel»

Article preview

Consideration is given to the geological, mining and operating conditions of the Norilsk industrial district. The analysis is made of the present-day state of mining production of the subarctic branch of MMK «Norilsk Nickel». The principal trends in the safe and efficient exploration of the raw material resources base have been stated within the Norilsk industrial district .

How to cite: Muravev E.I., Karelin V.N., Shabarov A.N. Problems and ways of exploration of the raw material resources base of the Subarctic branch of MMK «Norisk nickel» // Journal of Mining Institute. 2012. Vol. 198. p. 126.
Innovation in designing of mining plants
  • Date submitted
    2011-10-05
  • Date accepted
    2011-12-08
  • Date published
    2012-11-19

Provision of geodynamic safety in mining the Barentsburg coal deposit

Article preview

The minable seam «Verkhny» within the Barentsburg coal deposit is geodynamically hazardous, its geodynamic phenomena manifest itself in the form of proper rock bursts,  shocks in the marginal zones and dynamic faults of  ground. Due to rockburst-hazardous situation the application of the areal relief of rock mass with transition to technological variants of mining with leaving the extended rib pillars at the boundary with the mined-out space, with their cutting by drivage of additional working is applied. Consideration  is  given  to the recommended  variants of pillar leaving  with  the data  of their assignment and applicability to geological-and-mining conditions of mine field sections. Description is given to the calculation of pillar sizes and parameters used for their calculations. Some examples are given of pillar leaving at different sections of mine field with geometrical parameters as well as the information is given on the seam extraction with prospecting  routes (paths) with leaving the support rib and barrier pillars. The leaving of safety support and barrier pillars with substantiation of their sizes is recommended as the method for providing the safe condition  of mining the «Verkhny» coal seam

How to cite: Shvankin M.V., Rozenbaum M.A., Minin Y.Y., Stetsenko V.P., Bondarev A.V. Provision of geodynamic safety in mining the Barentsburg coal deposit // Journal of Mining Institute. 2012. Vol. 198. p. 122.