Submit an Article
Become a reviewer
Vol 205
Pages:
114-118
Download volume:
RUS
Article

Determination of a minimum permissible thickness of interstrata in undermining of a coal seam

Authors:
S. G. Baranov
About authors
  • Ph.D., Dr.Sci. leading research fellow National Mineral Resources University (Mining University)
Date submitted:
2012-12-13
Date accepted:
2013-02-16
Date published:
2013-12-23

Abstract

The Article presents the method for the determination of a minimum permissible thickness of rock interstrata, with which it is permissible to apply the steel-polymer roof bolts upon undermining of a coal seam. The method is based on the results of investigations of behavior of roof layers above the productive working with using the deep datum marks.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
roof deep datum marks subsidence of layers productive working zones of caving fracturing and smooth subsidence
Funding:

None

Go to volume 205

References

  1. Ardashev K.A., Rozenbaum M.A., Baranov S.G. Basic principles of estimation of adaptable reserves of mine fields and development of regulations of high production of longwalls with mechanized complexes // Ugol. 1999. N 10. Р.20-23.
  2. Instructions for calculation and application of roof bolts at coal mines in Russia. Saint Petersburg, 2000. 70 p.
  3. Orlov A.A., Baranov S.G., Myshlyaev B.K. Roof support and its control in the integrated powered faces. Moscow, 1993. 288 p.

Similar articles

For the anniversary of B.F.Bratchenko
2013 Orgkomitet konferentsii
Principles of construction and realization of multifunction systems of safety at coal mines for providing control of -stress-strain state of rock mass
2013 V. M. Vernigor, A. N. Shabarov, N. V. Krotov, V. V. Arshavsky
The method of analysis stress-and-strain state of a rock massif with regard to nonlinear character of straining process
2013 A. P. Gospodarikov, M. V. Maksimenko
Minimum power recovery styling selective with hydraulic excavators backhoe type
2013 D. N. Ligotskiy
Model of market of innovations of a mineral-raw complex
2013 S. G. Svetunkov, N. S. Shuval-Sergeeva
Economic efficiency reducing ore losses in pillars of level-chamber method operational at the Korobkovsky of the iron-ore deposit
2013 E. I. Boguslavsky, P. V. Korhzavykh