Submit an Article
Become a reviewer
Vol 205
Pages:
145
Download volume:
RUS

Methodical maintenance of calculation parameters of pillars when developing coal-bed dangerous on rockburst

Authors:
D. V. Sidorov
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2012-12-29
Date accepted:
2013-03-02
Date published:
2013-12-23

Abstract

The design procedure parameters of system of pillars of when developing coal-bed dangerous on rockburst. Recommendations about a choice of parameters of pillars are provided for example the preparation of protective seams Fifth and Fourth on JSC «Vorkutaugol» mines.

Go to volume 205

Similar articles

Exploring and mining gassy coals
2013 Ien Grei, Yu. S. Shelukhina
New objective laws of methane exhalation during intensive mining of shallow coal seams
2013 A. V. Agafonov, M. A. Ilyashov, V. N. Kocherga, S. I. Skipochka, V. V. Krukovskaya
The interaction of the cluster with the determinantsof competitive advantage petrochemical industry of the Omsk region
2013 M. M. Khaikin, V. S. Kudryashov
Innovative mechanisms geological and ekonomic assessment of minerals at the stage of small-scale searches of fields
2013 M. M. Omelchenko
Modernization of production in the conditions of tough competition on the market of refractories
2013 I. N. Andreikovets, V. S. Vasiltsov
Minimum power recovery styling selective with hydraulic excavators backhoe type
2013 D. N. Ligotskii