Submit an Article
Become a reviewer
Vol 205
Pages:
145
Download volume:

Methodical maintenance of calculation parameters of pillars when developing coal-bed dangerous on rockburst

Authors:
D. V. Sidorov
About authors
  • National Mineral Resources University (Mining University)
Date submitted:
2012-12-29
Date accepted:
2013-03-02
Date published:
2013-06-01

Abstract

The design procedure parameters of system of pillars of when developing coal-bed dangerous on rockburst. Recommendations about a choice of parameters of pillars are provided for example the preparation of protective seams Fifth and Fourth on JSC «Vorkutaugol» mines.

Go to volume 205

Similar articles

Determination of a minimum permissible thickness of interstrata in undermining of a coal seam
2013 S. G. Baranov
School of sciencec «Development of deposits of solid minerals»: stages of formation, the basis results of researches devoted to underground hard rock mining, prospects and perspectives
2013 V. P. Zubov
Realization of the mechanism of concession agreements in the Russian Federation
2013 Yu. V. Lyubek
Innovative mechanisms geological and ekonomic assessment of minerals at the stage of small-scale searches of fields
2013 M. M. Omelchenko
Economic efficiency reducing ore losses in pillars of level-chamber method operational at the Korobkovsky of the iron-ore deposit
2013 E. I. Boguslavskii, P. V. Korzhavykh
Principles of construction and realization of multifunction systems of safety at coal mines for providing control of -stress-strain state of rock mass
2013 V. M. Vernigor, A. N. Shabarov, N. V. Krotov, V. V. Arshavskii