The method of potash salt interchamber pillars stability control
About authors
- 1 — Mining institute, Ural branch the Russian Academy of Sciences
- 2 — Mining institute, Ural branch the Russian Academy of Sciences
- 3 — Mining institute, Ural branch the Russian Academy of Sciences
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.