The method of potash salt interchamber pillars stability control
About authors
- 1 — Ph.D., Dr.Sci. professor Mining institute, Ural branch the Russian Academy of Sciences
- 2 — Ph.D., Dr.Sci. professor Mining institute, Ural branch the Russian Academy of Sciences
- 3 — Ph.D., Dr.Sci. professor Mining institute, Ural branch the Russian Academy of Sciences
Abstract
The research of potash salt rock deforming and damaging features has made it possible to develop the method of load bearing element state examination by chamber-and-pillar system. This method consists in instrumental control of pillars by geophysical and in situ methods with following prognosis of their residual life by mathematical simulation methods.
Область исследования:
(Archived) Innovation in designing of mining plants
Funding:
None
Similar articles
Innovative technologies and problems of scientific and methodological provision of design decisions in mining coal layers in difficult mining and geological conditions
2013 V. V. Belikov, N. V. Belikova
The integrated corporate reporting of the mining companies at conditions of stakeholders theory
2013 T. V. Ponomarenko, I. B. Sergeev
Problems of mining of non-ferrous metals and gold deposits with pre-enrichment
2013 A. V. Konev, S. P. Kiselyova, K. A. Shtresler, Zh. V. Mironova