Date submitted2021-10-31
-
Date accepted2023-03-02
-
Date published2023-12-25
Improvement of technological schemes of mining of coal seams prone to spontaneous combustion and rock bumps
On the example of the Alardinskaya mine, the problem of underground mining of seams prone to spontaneous combustion and rock bumps in the conditions of the Kondomsky geological and economic region of the Kuznetsk coal basin is considered. The contradictions in the requirements of regulatory documents for the width of the inter-panel coal pillars in the mining of seams with longwalls in conditions of endogenous fire hazard and in the mining of seams that are dangerous due to geodynamical phenomena are discussed. These contradictions impede the safe mining of seams using traditionally used layouts with the danger of spontaneous combustion of coal and rock bumps. A mining-geomechanical model is presented, which is used for numerical three-dimensional simulation of the stress-strain state of a rock mass with various layouts for longwall panels using the finite element method. The results of the numerical analysis of the stress state of the rock mass immediately before the rock bump are presented, and the main factors that contributed to its occurrence during the mining of the seam are established. A dangerous degree of stress concentration in the coal seam near the leading diagonal entries is shown, especially in conditions of application of abutment pressure from the edge of panels’ gob. The analysis of the features of stress distribution in the inter-panel pillar at different widths is carried out. Recommendations for improving the layout for the development and mining of coal seams that are prone to spontaneous combustion and dangerous in terms of rock bumps in the conditions of Alardiskaya mine have been developed. The need for further studies of the influence of pillars for various purposes, formed during the mining of adjacent seams, on the stress-strain state of previously overmined and undermined seams is shown.
-
Date submitted2021-04-19
-
Date accepted2022-05-25
-
Date published2022-07-13
Development of the technology of stowing the developed space during mining
- Authors:
- Evgenii R. Kovalskii
- Kirill V. Gromtsev
An analysis of the world experience in the development of potash deposits shows that the main problems arising during their development are a high level of mineral losses, an increased risk of flooding of mine workings as a result of water-proof layer discontinuance and the development of emergency water inflows in the mined-out spaces. Reduction of potash ore losses can be achieved by using a long-pillar mining system, but this method is limited by the peculiarities of the geological structure of the potash deposits and the need to preserve the continuity of the water-proof layer during its underworking. The safety of underworking of the water-proof layer can be improved by using the stowing of the developed longwall space. However, the question of the influence of the stowing on the height of the zone of water supply cracks development remains little-studied. The world experience of stowing the developed spaces in the development of layers with long pillars is analyzed and the technology of placing the stowing masses, which can solve these problems, is proposed. The considered technology and the proposed solutions are supported by laboratory tests of stowing materials and mathematical modeling of deformation zones in the overlying rocks.
-
Date submitted2021-07-05
-
Date accepted2022-01-24
-
Date published2022-04-29
Ensuring the excavation workings stability when developing excavation sites of flat-lying coal seams by three workings
- Authors:
- Oleg I. Kazanin
- Andrei A. Ilinets
On the basis of analysis of mining plans and field studies at mines of JSC SUEK-Kuzbass, it is shown that in conditions of increasing the size of excavation columns during the development of flat-lying coal seams the stress-strain state of the rock mass along the workings length changes significantly. The necessity of predicting the stress-strain state at the design stage of the workings timbering standards, as well as subsequent monitoring of the workings roof state and its changes in the mining operations using video endoscopes, is noted. The results of numerical studies of the stress-strain state of the rock mass during the development of excavation sites by three workings for various combinations of width of the pillars between the workings for mining-geological and mining-technical conditions of the “Taldinskaya-Zapadnaya-2” mine are provided. The stresses in the vicinity of the three workings are compared with the values obtained during the development of the excavation sites by double drift. A set of recommendations on the choice of the location of the workings, the width of pillars, timbering standards that ensure the stable condition of the workings throughout the entire service life at the minimal losses of coal in the pillars is presented.
-
Date submitted2020-06-12
-
Date accepted2020-10-28
-
Date published2020-11-24
Spatial non-linearity of methane release dynamics in underground boreholes for sustainable mining
- Authors:
- Ada K. Dzhioeva
- Vladimir S. Brigida
The paper is devoted to the problem of increasing energy efficiency of coalmine methane utilization to provide sustainable development of geotechnologies in the context of transition to a clean resource-saving energy production. Its relevance results from the fact that the anthropogenic effect of coalmine methane emissions on the global climate change processes is 21 times higher than the impact of carbon dioxide. Suites of gassy coal seams and surrounding rocks should be classified as technogenic coal-gas deposits, while gas extracted from them should be treated as an alternative energy source. Existing practices and methods of controlling coalmine methane need to be improved, as the current “mine – longwall” concept does not fully take into account spatial and temporal specifics of production face advancement. Therefore, related issues are relevant for many areas of expertise, and especially so for green coal mining. The goal of this paper is to identify patterns that describe non-linear nature of methane release dynamics in the underground boreholes to provide sustainable development of geotechnologies due to quality improvement of the withdrawn methane-air mixture. For the first time in spatial-temporal studies (in the plane of CH 4 - S ) of methane concentration dynamics, according to the designed approach, the parameter of distance from the longwall ( L ) is introduced, which allows to create function space for the analyzed process (CH 4 of S-L ). Results of coalmine measurements are interpreted using the method of local polynomial regression (LOESS). The study is based on using non-linear variations of methane concentration in the underground boreholes and specific features of their implementation to perform vacuum pumping in the most productive areas of the undermined rock mass in order to maintain safe aerogas conditions of the extraction block during intensive mining of deep-lying gassy seams. Identification of patterns in the influence of situational geomechanical conditions of coal mining on the initiation of metastable gas-coal solution transformation and genesis of wave processes in the coal-rock mass allows to improve reliability of predicting methane release dynamics, as well as workflow manageability of mining operations. Presented results demonstrate that development of high-methane Donbass seams is associated with insufficient reliability of gas drainage system operation at distances over 40 m behind the longwall face. Obtained results confirm a working hypothesis about the presence of spatial migration of methane concentration waves in the underground gas drainage boreholes. It is necessary to continue research in the area of estimating deviation angles of “advance fracturing” zone boundaries from the face line direction. Practical significance of research results lies in the possibility to use them in the development of scientific foundation for 3D gas drainage of a man-made coal-methane reservoir, taking into account spatial and temporal advancement of the production face.
-
Date submitted2020-02-19
-
Date accepted2020-04-17
-
Date published2020-10-08
Decrease in coal losses during mining of contiguous seams in the near-bottom part at Vorkuta deposit
- Authors:
- Oleg I. Kazanin
- Valeriy V. Yaroshenko
The problem of formation of extended zones with high rock pressure (HRP) from safety pillars at the boundaries of extraction pillars formed due to the mine layout of complex geometry is considered at the example of JSC Vorkutaugol mines. A detailed analysis of the remaining reserves of the near-bottom part of the deposit was carried out to estimate losses and the impact of HRP zones from the Chetvertyi protective seam to mining operations on the Troinoi upper seam along with the possibilities for the reduction of sizes of HRP zones at the account of expanding the underworked space. Due to research on the near-bottom part of the Vorkuta deposit, within the framework of the accepted layout, a zone at the Komsomolskaya mine and two zones at the Zapolyarnaya-2 mine were singled out, at which losses at the boundaries of the extraction pillars amount up to 13-22 % of the total resources of the mine field. The high volume of losses in these pillars indicates the relevance of research on the priority extraction impact of protective seams on the efficiency and safety of mining operations in the working area of underworked and HRP zones. Based on the analysis of foreign and Russian experience in the pillar cleaning-up at the boundaries of working areas and the methodical guidelines and instructions, a technological scheme was developed that allows increasing the coal mining recovery factor in the near-bottom part of the Vorkuta deposit from 0.75 to 0.9 without fundamental changing of the ventilation and transport networks and also without purchasing any additional mining equipment. The conducted economic calculations confirmed the effectiveness of implementing the new technological scheme for cleaning-up reserves at the boundaries of extraction districts. The economic effect is from 0.079 to1.381 billion rubles of additional profit from coaxial extraction pillars, depending on the mining and geological conditions and the size of the pillars.
-
Date submitted2019-05-30
-
Date accepted2019-09-04
-
Date published2020-02-25
Prospects for industrial methane production in the mine n.a. V.M.Bazhanov using vertical surface wells
The estimated methane resources in the coal stratum of Donbass are 798.5 billion m 3 , including 119.5 billion m 3 in the Donetsk-Makeevsky area. Such significant potential implies that methane can be used not only for industrial production and energy purposes but also as a commodity for the chemical industry. However, in practice, commercial production of methane from coal seams, as is done in the fields of the USA, Canada, India, and China, is not carried out, and methane, obtained as a by-product, is utilized for ensuring the safety of the main technological processes for coal mining. The main reasons for this are the difficult mining and geological conditions of bedding, low thickness and permeability, which does not allow to separate methane production into an independent type of activity due to its low profitability, especially with the use of new technologies based on hydraulic fracturing of coal seams. The assessment of the possibility of industrial methane production in the mine n.a. V.M.Bazhanov in the Donetsk-Makeevsky area of Donbass, which reserves equal to 23.7 billion m 3 , showed that a significant part of the methane reserves is concentrated in coal seams and interlayers with a gas content of 18.5-20.7 m 3 /m 3 . Moreover, in the host rocks, methane is practically in a liberated state. This circumstance makes possible the commercial production of methane for its utilization from the unloaded rock mass by wells drilled from the surface, without the use of hydraulic fracturing technology. The paper discusses the technology of methane extraction by a degassing well drilled from the surface into a coal-bearing stratum unloaded from rock pressure in a mining field of the 4th eastern face of the m 3 seam of the mine n.a. V.M.Bazhanov and its subsequent use as the fuel of an electric generator. It is shown that over the entire period of operation of the pilot well, the volume of actually produced methane exceeded the design value by 23 %, and the cost of the gas produced amounted to 1535 rubles per 1000 m 3 , which is more than 3 times lower than the market price for natural gas for consumers in the Russian Federation. This made it possible to make a conclusion about the possibility of industrial extraction of mine methane using vertical surface wells for its subsequent utilization in power plants, which does not imply the usage of hydraulic fracturing technology.
-
Date submitted2013-07-27
-
Date accepted2013-09-30
-
Date published2014-03-17
Influence of disjunctive dislocations on parameters of secure zones on flat-lying adjacent coal seams
- Authors:
- V. P. Zubov
- E. R. Kovalskii
- A. V. Nikiforov
The article focuses influence of disjunctive dislocations on parameters of secure zones on flat-lying adjacent coal seams is considered.
-
Date submitted2013-07-16
-
Date accepted2013-09-21
-
Date published2014-03-17
Gas emission control parameters determination for sublevel caving mining systems at the «Kiselevskaya» coal mine
- Authors:
- O. I. Kazanin
- A. A. Sidorenko
- V. V. Sementsov
The results of the aero- and gas-dynamics processes numerical researches for the sublevel caving mining system with mechanized roof support in conditions of «Kiselevskaya» coal mine are given in the article. It is shown, that reliable and effective panel ventilation is provided with the technological scheme with three entries at the each sublevel. The parameters of the technological scheme are determined.
-
Date submitted2009-10-02
-
Date accepted2009-12-03
-
Date published2010-09-22
Particular formation of higher rock pressure zones with intensive mining of contiguous seams at coal mines of the «Suek-Kuzbass» CO
- Authors:
- A. I. Paltsev
- V. V. Zubkov
- N. V. Krotov
The problem of mining the suites of contiguous coal seams is considered. The sequential manner of seams mining essentially has influence on change of rock and gas pressure. The results of calculation and construction of borders of zones of higher rock pressure are presented. The analysis of conditions of hazardous zones formation is given.
-
Date submitted2009-08-26
-
Date accepted2009-10-25
-
Date published2010-02-01
The improvement of selective extraction of thick potash seams mined with room and pillar mining method
- Authors:
- Yu. G. Sirenko
- M. Yu. Brychkov
- E. R. Kovalsky
Technological scheme of selective extraction of a complex thick potash seam on the basis of cutting machine «Bucyrus Model 25 M0» is proposed. Stable pillars’ width and room dimensions are calculated. Economical effect is also presented.
-
Date submitted2009-07-04
-
Date accepted2009-09-10
-
Date published2010-04-22
Provision of safe coal mining with due account оf cleanup works at adjacent seams
- Authors:
- M. A. Ilyashov
During planning of mining works with coal series it is important to take into consideration mining conditions of each mine layer, to determine presence of natural and technogenic abnormal areas at its place and to appreciate their potential level of influence on the increase of rock pressure manifestations in the development and productive workings. In comparable conditions the most negative manifestations of rock pressure can be observed in roadways of neighboring low layer, when they are disposed in range of mutual action of abnormal areas of natural and technogenic origins.
-
Date submitted2009-07-20
-
Date accepted2009-09-24
-
Date published2010-04-22
Methods for presetting of artificial yielding to anthracite pillars
- Authors:
- S. G. Stradanchenko
- N. V. Titov
- Yu. V. Turuk
The article contains the results of in situ investigation of influence of yielding pillars on the stability of protected workings with different modes of preset yielding. Graphs of roof movements in the workings protected with yielding pillars, are given.