Submit an Article
Become a reviewer
Vol 207
Pages:
41-45
Download volume:
RUS
Article

Gas emission control parameters determination for sublevel caving mining systems at the «Kiselevskaya» coal mine

Authors:
O. I. Kazanin1
A. A. Sidorenko2
V. V. Sementsov3
About authors
  • 1 — Ph.D., Dr.Sci. dean National Mineral Resources University (Mining University)
  • 2 — Ph.D. Associate professor National Mineral Resources University (Mining University)
  • 3 — Postgraduate student National Mineral Resources University (Mining University)
Date submitted:
2013-07-16
Date accepted:
2013-09-21
Date published:
2014-03-17

Abstract

The results of the aero- and gas-dynamics processes numerical researches for the sublevel caving mining system with mechanized roof support in conditions of «Kiselevskaya» coal mine are given in the article. It is shown, that reliable and effective panel ventilation is provided with the technological scheme with three entries at the each sublevel. The parameters of the technological scheme are determined.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
underground mining parameters determination thick steep seams sublevel caving numerical modeling
Funding:

None

Go to volume 207

Similar articles

Forecast stress state of mass when extraction coal reserves under open pit mine in the underground mining Nui Beo (Vietnam)
2014 Nguen Van Kuang
Certain periodicity organizational and technical preventive measures, aimed at improving the effective management of safety on coal open pit mining
2014 E. B. Gridina, A. V. Pasynkov
Water economic recultivation of sandy opencasts in Leningrad region as the complex way of decision of region’s environmental problems
2014 S. V. Kovshov, M. M. Yakubovskii, V. P. Kovshov
Physical processes methane formation as a result of coal disintegration
2014 M. G. Menzhulin, A. V. Montikov, S. V. Vasilev
About the long-range programme for industrial and ecological safety in coal branch of industry
2014 V. V. Smirnyakova
Physical modeling of interchamber pillars fixity in Gubkin mine
2014 E. I. Boguslavskiy, B. Yu. Zuev, P. V. Korzhavykh