Parameters of removing the overburden for deposits complex structure of carbonate rocks

Authors:
V. V. Ivanov
About authors
  • Ph.D. Associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-22
Date published:
2014-03-17

Abstract

The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
deposit backfill mining method quarry shovel complex structure deposits dumping work
Funding:

None

Go to volume 207

References

  1. Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
  2. Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.

Similar articles

Stopes walls stabilization at the rich iron ore mining by the flat-back cut-and-fill method
2014 V. P. Zubov, M. D. Morozov, A. S. Malyutin
Occupational safety and health professional
2014 Z. N. Cherkai
Rock mechanics problems decision algorithm for bottom layers of potash salt deposits
2014 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov, A. A. Sankovskii
Gas emission control parameters determination for sublevel caving mining systems at the «Kiselevskaya» coal mine
2014 O. I. Kazanin, A. A. Sidorenko, V. V. Sementsov
Mining units quantity determination to achieve the established open cast output and averaging ore requirements
2014 S. I. Fomin, V. A. Shevelev, M. A. Marinin
Forecast stress state of mass when extraction coal reserves under open pit mine in the underground mining Nui Beo (Vietnam)
2014 Nguen Van Kuang