Parameters of removing the overburden for deposits complex structure of carbonate rocks
Authors:
About authors
- Ph.D. Associate professor National Mineral Resources University (Mining University)
Abstract
The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
- Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.
Similar articles
Modern technology of consumption waste management in the mining agglomeration
2014 M. Sh. Barkan, A. B. Makhovikov, E. I. Kabanov
Rock mechanics problems decision algorithm for bottom layers of potash salt deposits
2014 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov, A. A. Sankovskii
Stopes walls stabilization at the rich iron ore mining by the flat-back cut-and-fill method
2014 V. P. Zubov, M. D. Morozov, A. S. Malyutin
Studying of the overgrowth mechanism dumps overburden breeds in climatic conditions of northern regions
2014 V. S. Kuznetsov