Parameters of removing the overburden for deposits complex structure of carbonate rocks

Authors:
V. V. Ivanov
About authors
  • Ph.D. Associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-22
Date published:
2014-03-17

Abstract

The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
deposit backfill mining method quarry shovel complex structure deposits dumping work
Funding:

None

Go to volume 207

References

  1. Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
  2. Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.

Similar articles

Mining units quantity determination to achieve the established open cast output and averaging ore requirements
2014 S. I. Fomin, V. A. Shevelev, M. A. Marinin
Physical processes methane formation as a result of coal disintegration
2014 M. G. Menzhulin, A. V. Montikov, S. V. Vasilev
Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov
Occupational safety and health professional
2014 Z. N. Cherkai
Tracing the forecast structural elements while interpretation of remote sensing data within Fresnillo city (Central Mexica)
2014 I. B. Movchan, V. Yu. Asyanina
Physical modeling of interchamber pillars fixity in Gubkin mine
2014 E. I. Boguslavskiy, B. Yu. Zuev, P. V. Korzhavykh