Parameters of removing the overburden for deposits complex structure of carbonate rocks
Authors:
About authors
- Ph.D. Associate professor National Mineral Resources University (Mining University)
Abstract
The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
References
- Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
- Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.
Similar articles
Forecast stress state of mass when extraction coal reserves under open pit mine in the underground mining Nui Beo (Vietnam)
2014 Nguen Van Kuang
Methodological features of intensification natural ventilation pits
2014 V. A. Rogalev, K. N. Yastrebova
Optimization of work of dust supperession sprayer with use of computing modelling
2014 Yu. D. Smirnov, O. S. Dobrynin
Quality management of brown coal at open-pit mine in the presence of several consumers with varios requirements to it
2014 M. M. Yakubovskii, K. Drebenshtedt