Parameters of removing the overburden for deposits complex structure of carbonate rocks
Authors:
About authors
- Ph.D. Associate professor National Mineral Resources University (Mining University)
Abstract
The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
- Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.
Similar articles
Interchamber pillars partial working off technology at the floor-and-chamber system of development of the Korobkovsky deposit of KMA
2014 E. I. Boguslavskii, M. N. Andreev
Method of normal load prediction on vertical shaft lining based on nonlinear behaviour of rock mass
2014 A. G. Protosenya, Nguen Ny Bai
Contemporary Problems of salvaging drill cuttings on the Western Siberia oilfields of the final stage of development
2014 V. V. Katsilo