Parameters of removing the overburden for deposits complex structure of carbonate rocks

Authors:
V. V. Ivanov
About authors
  • Ph.D. Associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-22
Date published:
2014-03-17

Abstract

The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
deposit backfill mining method quarry shovel complex structure deposits dumping work
Funding:

None

Go to volume 207

References

  1. Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
  2. Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.

Similar articles

Stopes walls stabilization at the rich iron ore mining by the flat-back cut-and-fill method
2014 V. P. Zubov, M. D. Morozov, A. S. Malyutin
Use of coefficient of output at pit delimitation
2014 G. A. Kholodnyakov, N. S. Vainonen
Reducing environmental hazard drilling works
2014 M. M. Malyshkin
Gas balance definition of working area with face zone isolation
2014 V. V. Smirnyakov
About the long-range programme for industrial and ecological safety in coal branch of industry
2014 V. V. Smirnyakova
Analysis of impact of gas field water bodies
2014 T. A. Petrova