Parameters of removing the overburden for deposits complex structure of carbonate rocks
Authors:
About authors
- Ph.D. Associate professor National Mineral Resources University (Mining University)
Abstract
The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.
Область исследования:
(Archived) Geotechnology for development of solid mining fields
Funding:
None
References
- Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
- Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.
Similar articles
Prospects of improving technology for development of coalseams in Vietnam’s undergroundmines
2014 Kao Kuok Vet, V. P. Zubov
Certain periodicity organizational and technical preventive measures, aimed at improving the effective management of safety on coal open pit mining
2014 E. B. Gridina, A. V. Pasynkov
Physical processes methane formation as a result of coal disintegration
2014 M. G. Menzhulin, A. V. Montikov, S. V. Vasilev