Parameters of removing the overburden for deposits complex structure of carbonate rocks

Authors:
V. V. Ivanov
About authors
  • Ph.D. Associate professor National Mineral Resources University (Mining University)
Date submitted:
2013-07-26
Date accepted:
2013-09-22
Date published:
2014-03-17

Abstract

The main features of the development of Open-complex structure of carbonate rocks. The dependence for the determination of dozing on the domestic heap career, moving overburden on bestransportnoy scheme in goaf. Found that the optimum length of excavator block executed by one parking dragline at quarries carbonate rocks is achieved with the minimum total cost of doing the work of overburden and waste associated with the removal of the overburden.

Область исследования:
(Archived) Geotechnology for development of solid mining fields
Keywords:
deposit backfill mining method quarry shovel complex structure deposits dumping work
Funding:

None

Go to volume 207

References

  1. Ivanov V.V. Determination of the front mining length for backfill mining method of complex structure carbon deposits by railway transport // Proceedings of the Mining Institute. 2011. Vol.190. P.46-50.
  2. Arsentiev A.I. The development of mining in the career spaceм / Saint Petersburg Mining Institute. Saint Petersburg, 1994. 104 p.

Similar articles

Production of slate gas
2014 R. D. Magomet
Methodological features of intensification natural ventilation pits
2014 V. A. Rogalev, K. N. Yastrebova
Application of the method of x-ray fluorescence for carrying out monitoring of the soil and vegetable cover
2014 M. A. Kulikova
Analytical estimation of aerodynamic characteristics of the main roof collapse
2014 V. V. Smirnyakov
Studying of the overgrowth mechanism dumps overburden breeds in climatic conditions of northern regions
2014 V. S. Kuznetsov
Analysis of impact of gas field water bodies
2014 T. A. Petrova