Submit an Article
Become a reviewer

Search articles for by keywords:
временно нерабочий борт

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-07-25
  • Date accepted
    2024-05-02
  • Date published
    2024-08-26

Finite element analysis of slope failure in Ouenza open-pit iron mine, NE Algeria: causes ‎and lessons for stability control

Article preview

Slope failures in mining engineering pose significant risks to slope stability control, necessitating a thorough investigation into their root causes. This paper focuses on a back analysis of a slope failure in the Zerga section of the Ouenza – Algeria open-pit iron mine. The primary objectives are to identify the causes of slope failure, propose preventive measures, and suggest techniques to enhance stability, thereby providing crucial insights for monitoring slope stability during mining operations. The study commenced with a reconstruction of the slopes in the affected zones, followed by a numerical analysis utilizing the Shear strength reduction method within the Finite element method (SSR-FE). This approach enables the examination of slope stability under both static and dynamic loads. The dynamic load assessment incorporated an evaluation of the vibrations induced by the blasting process during excavation, introducing seismic loading into the finite element analysis. The findings reveal that the primary triggering factor for the landslide was the vibration generated by the blasting process. Furthermore, the slope stability was found to be critically compromised under static loads, highlighting a failure to adhere to exploitation operation norms. The challenging geology, particularly the presence of marl layers where maximum shear strain occurs, contributed to the formation of the landslide surface. The study not only identifies the causes of slope failure but also provides valuable lessons for effective slope stability management in mining operations.

How to cite: Belgueliel F., Fredj M., Saadoun A., Boukarm R. Finite element analysis of slope failure in Ouenza open-pit iron mine, NE Algeria: causes ‎and lessons for stability control // Journal of Mining Institute. 2024. Vol. 268 . p. 576-587. EDN XIQXNW
Economic Geology
  • Date submitted
    2022-06-02
  • Date accepted
    2022-07-21
  • Date published
    2022-10-05

Substantiation of the optimal performance parameters for a quarry during the stage-wise development of steeply dipping ore deposits

Article preview

The use of stage-wise schemes in the development of deep quarries is one of the ways to increase the economic efficiency of mining a deposit and determining the optimal stage parameters remains an urgent task. Such parameters are stage depth, bench height, block length, etc. However, there is a wide range of values for these parameters. Therefore, to select the optimal values and evaluate the effectiveness of design solutions, it is advisable to use the net present value, which is an international notion. As a result of the analysis of data on deposits, a large number of variable indicators can be identified that presumably affect the efficiency of mining. The article proposes to divide all parameters of the quarry mining into two types: mine engineering and economic. The importance of each of them is determined by the measure of influence on the net present value. Thus, to assess the measure of influence of mining indicators, the average values of each of them are taken, and as a result of the alternating change of one parameter under study, the measure of its influence on the discounted income received is estimated. The results of the analysis of relevant factors, their evaluation and comparative analysis are important indicators that significantly affect the design decisions made and the effectiveness of the investment project.

How to cite: Fomin S.I., Ovsyannikov M.P. Substantiation of the optimal performance parameters for a quarry during the stage-wise development of steeply dipping ore deposits // Journal of Mining Institute. 2022. p. DOI: 10.31897/PMI.2022.73
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-02-24
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

A probabilistic approach to the dynamic cut-off grade assessment

Article preview

Cut-off grade is an important conditioning parameter that determines the quantity and quality of recoverable reserves and development efficiency. Today, Russian mining companies operate with certified quality requirements. By setting permanent quality requirements, the government seeks to prevent depletion of reserves, reduced production during periods of falling prices, and decreased budget revenues, expressing the interests of all members of society. But to what extent do the permanent quality requirements protect the interests of the state? The answer to this question is ambiguous and does not lie on the surface. The State Commission for Reserves and domestic researchers are working to find a rational solution to the problem of quality requirements. One solution is dynamic quality requirements. The effectiveness of their application has been proven for individual mining companies, but it is incorrect to transfer these conclusions to the entire mineral resource base of the country. This article presents a new approach to determining the dynamic cut-off grade, which varies depending on the price of minerals. The dynamic cut-off grade is proposed to be determined based on the indicators of constant requirements to the quality of exploration work, using the maximum allowable costs in the region. The approach allows to calculate the effect of the introduction of dynamic cut-off grade in the practice of subsurface use for the state (in the form of the amount of taxes received) and for subsoil users (in the form of the amount of income). For a group of gold-bearing deposits with open-pit mining method, it was established that the development of reserves using dynamic values of the cut-off grade in periods of price changes ensures compliance with the interests of the state and subsoil users.

How to cite: Bragin V.I., Kharitonova M.Y., Matsko N.A. A probabilistic approach to the dynamic cut-off grade assessment // Journal of Mining Institute. 2021. Vol. 251 . p. 617-625. DOI: 10.31897/PMI.2021.5.1
Oil and gas
  • Date submitted
    2021-03-11
  • Date accepted
    2021-07-27
  • Date published
    2021-10-21

Justification of a comprehensive technology for preventing the formation of asphalt-resin-paraffin deposits during the production of highlyparaffinic oil by electric submersible pumps from multiformation deposits

Article preview

Production of highly solidifying abnormal oils (with a paraffin content of over 30 % by mass) in the Far North is complicated by the intensive formation of asphalt-resin-paraffin deposits (ARPD) in the bottomhole zone of the productive formation, well and surface equipment. Existing methods and technologies for countering the formation of organic deposits in well equipment have many advantages. However, their application in the production of highly paraffinic oil does not fully prevent the formation of ARPD in the tubing string. This leads to a significant reduction in oil production, reduction of turnaround and intertreatment periods of production wells operation, an increase in specific operating expenses for paraffin removal. Results of theoretical and laboratory investigations presented in the article show that one of the promising ways to improve the operational efficiency of wells equipped with electric submersible pumps during extraction of highly paraffinic oil from multiformation deposits is the application of a new integrated technology based on the joint production of highly solidifying abnormal oil with oil, characterized by a lower paraffin content and manifestation of structural and mechanical properties, in conjunction with the regulation of the parameters for the electric submersible pump. Results of numerical modeling using the PIPESIM steady-state multiphase flow simulator, physical, chemical and rheological investigations show that with a decrease of highly paraffinic oil from the productive formation D2ef in a blend with Stary Oskol oil from the Kyrtaelskoye field, a decrease in the mass content of paraffin in the blend and the temperature of its saturation with paraffin, depth and intensity of the organic deposits formation in the tubing string, pour point, as well as the improvement of the rheological properties of the investigated structured dispersed systems is observed. Article describes a promising assembly of well equipment for the single tubing separate production of highly paraffinic oil from multiformation deposits of the Timan-Pechora province, providing separation of the perforation zones in two productive formations using a packer-anchor system at simultaneous-separate operation of the formations by a double electric submersible pump unit.

How to cite: Rogachev M.K., Aleksandrov A.N. Justification of a comprehensive technology for preventing the formation of asphalt-resin-paraffin deposits during the production of highlyparaffinic oil by electric submersible pumps from multiformation deposits // Journal of Mining Institute. 2021. Vol. 250 . p. 596-605. DOI: 10.31897/PMI.2021.4.13
Mining
  • Date submitted
    2019-04-27
  • Date accepted
    2019-07-10
  • Date published
    2019-10-23

Estimation of Rock Mass Strength in Open-Pit Mining

Article preview

The paper presents results of an experimental study on strength characteristics of the rock mass as applied to the assessment of open-pit slope stability. Formulas have been obtained that describe a correlation between ultimate and residual strength of rock samples and residual shear strength along the weakening surface. A new method has been developed to calculate residual interface strength of the rock mass basing on data from the examination of small-scale monolith samples with opposing spherical indentors. A method has been proposed to estimate strength characteristics (structural weakening coefficients and internal friction angles) of the fractured near-slope rock mass. The method relies on test data from shattering small-scale monolith samples with spherical indentors, taking into ac- count contact conditions along the weakening surface, and can be applied in the field conditions. It is acceptable to use irregular-shaped samples in thetests.

How to cite: Pavlovich A.A., Korshunov V.A., Bazhukov A.A., Melnikov N.Y. Estimation of Rock Mass Strength in Open-Pit Mining // Journal of Mining Institute. 2019. Vol. 239 . p. 502-509. DOI: 10.31897/PMI.2019.5.502
Geology and geophsics
  • Date submitted
    2010-07-01
  • Date accepted
    2010-09-12
  • Date published
    2011-03-21

Usage modern computer techniques for validation of actions guaranteeing opening strength of pit edge

Article preview

In this article is described an example of using program Modflow for the issues of oreation geofiltration processes numerical simulation on procedure of horizontal drainage well simulation. Also is estimated stability of pit edges in case of using system horizontal drains.

How to cite: Kotlov S.N. Usage modern computer techniques for validation of actions guaranteeing opening strength of pit edge // Journal of Mining Institute. 2011. Vol. 189 . p. 34-37.
Development of solid mineral deposits
  • Date submitted
    2010-07-29
  • Date accepted
    2010-09-30
  • Date published
    2011-03-21

Research of opencast reloading point’s influence оn bench turnover rate

Article preview

In article it is considered influence of reloading points on bench turnover rate. The scheme of ore reloading with alternation of concentration horizon on the adjacent ledges is offered. It allows limit depth of distribution temporarily non-working rock pillar to work space.

How to cite: Kholodnyakov G.A., Yakubovskiy M.M. Research of opencast reloading point’s influence оn bench turnover rate // Journal of Mining Institute. 2011. Vol. 189 . p. 155-159.
Mining
  • Date submitted
    2009-08-23
  • Date accepted
    2009-10-17
  • Date published
    2010-02-01

Reseach of cutoff grade influence on economic performances of mining

Article preview

Research of cutoff grade influence on economic performances of mine as well as parameters and configuration of ore deposits with the help of the advanced geoinformation system were carried out. Computer modeling of an ore chute was made; the results of calculation were presented, involvement is given.

How to cite: Morozov M.D. Reseach of cutoff grade influence on economic performances of mining // Journal of Mining Institute. 2010. Vol. 186 . p. 71-74.
Geotechnical engineering, powerengineering and automation
  • Date submitted
    2009-08-02
  • Date accepted
    2009-10-29
  • Date published
    2010-02-01

Forecasting the power consumption of mines on the basis of stochastic time-series models

Article preview

The paper is devoted to building up time series models to forecast the power consumption of a mine. The results discussed are obtained using various linear filter models and artificial neural network. The wavelet transform of the raw time series is shown to be an efficient technique to increase the forecasting accuracy.

How to cite: Chernysh A.A., Shonin O.B. Forecasting the power consumption of mines on the basis of stochastic time-series models // Journal of Mining Institute. 2010. Vol. 186 . p. 165-169.
Problems in geomechanics of technologeneous rock mass
  • Date submitted
    2009-07-09
  • Date accepted
    2009-09-01
  • Date published
    2010-04-22

Method of calculation stability of the open pit edges

Article preview

During the opencast mining operations with bating and opening-up of new horizons as a result of the process duration in the near-edge rock mass, fatigue accumulates, which leads to slope deformations in the form of slide rocks, rock falls, roof breaks, and, in some cases, large-scale landslides. Given that the open pit edges are complex engineering structures, on the state of which mining operations effectiveness and safety depend, their stability control is a very urgent problem.

How to cite: Chebakov A.V. Method of calculation stability of the open pit edges // Journal of Mining Institute. 2010. Vol. 185 . p. 175-179.