-
Date submitted2023-09-05
-
Date accepted2024-11-07
-
Date published2025-02-25
Investigation of the accuracy of constructing digital elevation models of technogenic massifs based on satellite coordinate determinations
At all stages of the life cycle of buildings and structures, geodetic support is provided by electronic measuring instruments – a laser scanning system, unmanned aerial vehicles, and satellite equipment. In this context, a set of geospatial data is obtained that can be presented as a digital model. The relevance of this work is practical recommendations for constructing a local quasigeoid model and a digital elevation model (DEM) of a certain accuracy. A local quasigeoid model and a DEM were selected as the study objects. It is noted that a DEM is often produced for vast areas, and, therefore, it is necessary to build a local quasigeoid model for such models. The task of assessing the accuracy of constructing such models is considered; its solution will allow obtaining a better approximation to real data on preassigned sets of field materials. A general algorithm for creating both DEM and local quasigeoid models in the Golden Software Surfer is presented. The constructions were accomplished using spatial interpolation methods. When building a local quasigeoid model for an area project, the following methods were used: triangulation with linear interpolation (the least value of the root mean square error (RMSE) of interpolation was 0.003 m) and kriging (0.003 m). The least RMSE value for determining the heights by control points for an area project was obtained using the natural neighbour (0.004 m) and kriging (0.004 m) methods. To construct a local quasigeoid model for a linear project, the following methods were applied: kriging (0.006 m) and triangulation with linear interpolation (0.006 m). Construction of the digital elevation model resulted in the least aggregate value of the estimated parameters: on a flat plot of the earth’s surface – the natural neighbour method, for a mountainous plot with anthropogenic topography – the quadric kriging method, for a mountainous plot – quadric kriging.
-
Date submitted2024-04-11
-
Date accepted2024-06-03
-
Date published2024-07-04
Assessment of the efficiency of acid mine drainage purification (using the example of copper-pyrite mines in the Middle Urals)
According to the results of the anti-rating of regions with extreme pollution of watercourses in the Sverdlovsk region, the largest number of polluted rivers has been recorded in recent years – more than a quarter of all high and extremely high pollution. One of the sources of pollution of natural water bodies in the Middle Urals are closed and flooded copper-pyrite mines, where acidic mine drainage continue to form and unload to the surface. Several of them have organized collection and a two-stage acidic drainage purification system, including neutralization with lime milk and settling in a clarifier pond. Despite the identical schemes, different indicators of pollutants are recorded during discharge into water bodies. The aim of the work is to evaluate the effectiveness of the applied acid mine drainage purification system and identify the parameters affecting the quality of treated mine water. Laboratory studies were performed using methods of flame emission spectrometry, flame atomic absorption, atomic absorption spectrometry, mass spectrometry with ionization in inductively coupled plasma, potentiometric, etc. It has been established that the existing mine drainage purification system at the Degtyarskii mine makes it possible to significantly reduce the concentrations of most toxic components of mine waters to almost standard values. At the Levikhinskii mine, the multiplicity of exceeding the maximum permissible concentrations reaches hundreds and thousands of times. To achieve a higher degree of purification, it is necessary that the duration of passive purification is sufficient for the reactant to interact with acidic waters. However, to ensure this possibility, it will require the creation of a cascade of ponds with an area of several thousand hectares. If the current two-stage system is quite effective for the Degtyarskii mine, then for Levikhinskii it is necessary to switch to the use of more modern systems, including three stages of purification.
-
Date submitted2022-05-26
-
Date accepted2022-11-17
-
Date published2022-12-29
Renovation method of restoring well productivity using wavefields
A stagewise theoretical substantiation of the renovation vibrowave method of influencing the near-wellbore zone of reservoir for restoring well productivity is presented. The area of treatment by the proposed method covers the reservoir with a heterogeneous permeability with fractures formed by fracking. In this method a decrease in concentration of colmatants occurs due to a change in direction of contaminants migration. Under the influence of pressure pulses, they move deep into the reservoir and disperse through the proppant pack. The results of mathematical modelling of the propagation of pressure wave and velocity wave and the calculations of particles entrainment in wave motion are presented.
-
Date submitted2021-12-21
-
Date accepted2022-06-20
-
Date published2022-11-10
Scientific justification of the perforation methods for Famennian deposits in the southeast of the Perm Region based on geomechanical modelling
The article presents the results of analysing geological structure of the Famennian deposits (Devonian) in the Perm Region. Numerical modelling of the distribution of inhomogeneous stress field near the well was performed for the two considered types of perforation. With regard for the geometry of the forming perforation channels, numerical finite element models of near-wellbore zones were created considering slotted and cumulative perforation. It is ascertained that in the course of slotted perforation, conditions are created for a significant restoration of effective stresses and, as a result, restoration of reservoir rock permeability. Stress recovery area lies near the well within a radius equal to the length of the slots, and depends on the drawdown, with its increase, the area decreases. From the assessment of failure areas, it was found that in case of slotted perforation, the reservoir in near-wellbore zone remains stable, and failure zones can appear only at drawdowns of 10 MPa and more. The opposite situation was recorded for cumulative perforation; failure zones near the holes appear even at a drawdown of 2 MPa. In general, the analysis of results of numerical simulation of the stress state for two simulated types of perforation suggests that slotted perforation is more efficient than cumulative perforation. At the same time, the final conclusion could be drawn after determining the patterns of changes in permeability of the considered rocks under the influence of changing effective stresses and performing calculations of well flow rates after making the considered types of perforation channels.
-
Date submitted2021-02-05
-
Date accepted2021-03-30
-
Date published2021-04-26
Assessment of negative infrastructural externalities when determining the land value
- Authors:
- Elena N. Bykova
The work forms and substantiates the concept of land value, based on a new institutional theory. The infrastructural component of the cost of land in the presented concept determines, on the one hand, the efficiency of the use of natural resources, properties, demand for land on the market, on the other hand, the costs, which are determined not only by capital investments in construction of engineering infrastructure, but also by losses associated with restrictions on activities within zones with special conditions for territory use, creation of unfavorable conditions for economic activity, small contours, irregularities and others on a specific land plot, which are external negative infrastructural externalities that create losses of rights holders of land plots that are not compensated by the market, falling within the boundaries of these zones. Methods for assessing the impact of such negative infrastructural externalities on the cost of land encumbered by zones in different conditions of land market activity have been developed and tested, based on an expert-analytical approach (depressed market); the ratio of market values of land plots encumbered and unencumbered by a specific zone, and qualimetric modeling (inactive market); modeling by introducing into the model the factor of presence of zones with special conditions for territory use, based on the grouping of zones according to similar regulations for use, or by introducing the parameters of this factor (active market). Methods for taking into account spatial deficiencies and compensating for restrictions and prohibitions on activities on the territory of land plots with an individual market assessment are proposed.
-
Date submitted2019-06-22
-
Date accepted2019-09-11
-
Date published2020-04-24
Effective capacity building by empowerment teaching in the field of occupational safety and health management in mining
The paper is dealing with a developed concept named Empowerment Teaching, which is based on practical teaching experience gained in various mining universities. It is demonstrated that this concept can be used to increase the effectiveness of knowledge transfer to mining countries in the world, as well as to overcome cultural barriers between lecturers and their students. The two models of participatory training, which are proposed to be named “physical” and “emotional” models, are portrayed. The authors are convinced that participatory training methods can be an ideal answer to a challenge associated with workers’ competencies in mining, namely – the potential of highly motivated and well-educated young academics is often diminished by a lack of ability to apply their knowledge. A special emphasis is made on the possible application of empowerment teaching for educational and training activities in the field of occupational safety and health (OSH), which is a matter of utmost importance for the mining industry. Several benchmarking initiatives in the field of OSH (“safety culture”, zero-accident vision) are underlined to be encouraged and promoted by means of new teaching methods. The examples of successful international cooperation among universities are given, as well.
-
Date submitted2019-03-24
-
Date accepted2019-05-13
-
Date published2019-08-23
Calculation of Oil-saturated Sand Soils’ Heat Conductivity
- Authors:
- J. Sobota
- V. I. Malarev
- A. V. Kopteva
Nowadays, there are significant heavy high-viscosity oil reserves in the Russian Federation with oil recovery coefficient not higher than 0.25-0.29 even with applying modern and efficient methods of oil fields development. Thermal methods are the most promising out of the existing ways of development, main disadvantage of which is large material costs, leading to the significant rise in the cost of extracted oil. Thus, creating more efficient thermal methods and improving the existing ones, is the task of great importance in oil production. One of the promising trends in enhancing thermal methods of oil recovery is the development of bottomhole electric steam generators. Compared to the traditional methods of thermal-steam formation treatment, which involve steam injection from surface, well electrothermal devices can reduce energy losses and improve the quality of steam injected into the formation. For successful and efficient organization of oil production and rational development of high-viscosity oil fields using well electrothermal equipment, it is necessary to take into account the pattern of heat propagation, both in the reservoir and in the surrounding space, including the top and bottom. One of the main values characterizing this process is the heat conductivity λ of oil-bearing rocks. The article describes composition of typical oil-saturated sand soils, presents studies of heat and mass transfer in oil-saturated soils, reveals the effect of various parameters on the heat conductivity of a heterogeneous system, proposes a method for calculating the heat conductivity of oil-bearing soils by sequential reduction of a multicomponent system to a two-component system and proves the validity of the proposed approach by comparing acquired calculated dependencies and experimental data.
-
Date submitted2018-09-02
-
Date accepted2018-10-28
-
Date published2019-02-22
Factors affecting bacterial and chemical processes of sulphide ores processing
- Authors:
- T. S. Khainasova
Extraction of valuable components from sulphide ores using microorganisms is a recognized biotechnological method, combining several advantages over traditional methods of mineral processing. This paper presents the main factors affecting the bacterial-chemical leaching and methods of leaching with the participation of microorganisms. Some physical-chemical (temperature, pH, oxygen, carbon dioxide, nutrients, metals and other chemical elements) and microbial (cell count and microflora activity) properties are given, either directly or indirectly (suppressing or contributing to the growth and oxidative capacity of microorganisms) affecting the kinetics of the process. The paper discusses the characteristics of the mineral substrate, including galvanic interaction of sulfide minerals and the formation of passivating layers on the surface of the ore during oxidation, emphasizing the importance of the electrochemical interaction of the components of the leaching system. Bioleaching is a complex process, which is a combination of mainly chemical reactions mediated by the microbial component, therefore, to improve the kinetics, it is necessary to consider, monitor and regulate the listed range of factors.
-
Date submitted2018-05-09
-
Date accepted2018-06-30
-
Date published2018-10-24
Scientific and methodical approaches to increase prospecting efficiency of the russian arctic shelf state geological mapping
- Authors:
- A. S. Egorov
- I. Yu. Vinokurov
- A. N. Telegin
A rationale for the set of theoretical and methodological techniques of mapping and deep modeling in the Russian Arctic shelf and adjacent sedimentary basins in continental Russia is based on the materials for the Barents and Kara Seas region. This article provides the factual basis of the research and shows how to apply zonal-block model of the crust and generalized models of geodynamic settings in terms of the different geophysical data inconsistency. The necessity and approach for global and regional paleo-reconstructions are also discussed. It is shown that localization of the principal structural and compositional units of the lithosphere being a consequence of geodynamic processes at the boundaries of lithospheric plates, form at the basis of sedimentary cover and crystalline basement layered maps as well as cross-sections of the continental crust. The identified parameters of the deep structure and milestones of the regional tectonic history open new opportunities to explore the regularities of ore deposits distribution. The shown example of the forecast and metallogeny problems solution within Western Siberia and Khatanga-Vilyui petroleum provinces is made using the parameters of known industrial oil and gas fields for training the pattern recognition system.
-
Date submitted2017-09-20
-
Date accepted2017-10-29
-
Date published2018-02-22
Substantiation of strength of the filling mass by taking a blast effect into account for the room-and-pillar methods
- Authors:
- E. T. Voronov
- V. N. Tyupin
The development of the uranium ore bodies at the ore mines of PJSC «Priargunsky Industrial Mining and Chemical Union» (PJSC «PIMCU») by room-and-pillar method as high as a pillar between the levels (60 m) without fill, as a rule, leads to the fall of the adjoining rock, to the strong contamination of the ore and to the high yield of the oversize pieces of the barren rock. A longstanding industrial and theoretical research shows that the sizes of the self-sustaining rock escarpments at the ore mines of PJSC «PIMCU» in the solid mass of trachydacites, conglomerates, sandstones, felsites are equal to 20-40 m. Moreover, the sizes of the self-sustaining rock escarpments depend to a great extent on the intensity of fracturing of the adjoining rocks. The stable size of the escarpment does not exceed 5-10 m for the rocks with the size of a jointing up to 0.05 m. Consequently, timely performance of the filling operations of the worked-out space of the chamber is important. However, the question then arises: which characteristic strength should the filling mass have? The calculations of the characteristics of the filling mass in compliance with the reference guide «Shaft filling operations» show underestimated values of the characteristic compressive strength of the fill (1.4 MPa) for the room-and-pillar method, which leads to the increase of the ore contamination by the fill and provokes the additional costs for refilling of the volumes of the rock fall. On the basis of the Russian experience of using of the consolidated fill for the development of the ore bodies of 15 m thickness by chamber method the strength of the fill is taken as 3-5 MPa under the resultant value of the static stresses without taking into account the character of the dynamic loading stresses induced by the sequence blasthole ring initiating in a chamber. Overestimating the characteristic strength of the filling mass results in the high consumption of the cementing materials. On the basis of the theoretical research the authors suggested the theoretical dependence of calculation of the characteristic strength of the filling material with respect to compressive stresses of the fill induced by the blasting operations. The process of designing of the filling mass with the zones of diverse strength for the room-and-pillar extraction with the consolidated rock fill is proven to be economically reasonable. The bottom zone of the solid mass should have high strength (3-4 MPa), and the strength of the upper zone should be up to 2-2.5 MPa.
-
Date submitted2014-11-15
-
Date accepted2015-01-11
-
Date published2015-10-26
On the necessity of taking into consideration the increment of the growing stock in cadastral valuation of lands of forest fund
- Authors:
- V. F. Kovyazin
Currently there are no methods of cadastral valuation of forest land although the area covers 2/3 of the territory of the Russian Federation. In 2002, the Federal Land Inventory Service of Russia proposed a method but it failed to find practical use due to the complicated calculation of the cadastral value according to the Faustmann formula and lack of open access to some information about the forest fund and was totally abolished seven years later. There were several reasons for abolishing the method and the main reason was lack of methods to predict a supply of wood to the age of maturity when the cadastral assessment was carried out in the plantations under the age of main felling. The author proposes to take into account the current growth rate of the growing stock per year on one hectare of land in the cadastral evaluation of forest fund lands. Based on the increment of the growing stock it is possible to construct a mathematical model of changes in the forest reserve to the age of maturity. The author suggests using the existing forest inventory materials to build the model. By updating existing data you can obtain any inventory indices including the growing stock in different age plantations. The resulting inventory of plantations at the age of maturity is recommended for cadastral valuation of the forest fund lands. The calculation of the cadastral value of forest land for one taxation quarter with and without current increment of the growing stock is given and the difference is 37 %.
-
Date submitted2009-10-18
-
Date accepted2009-12-09
-
Date published2010-09-22
Influence of blocky-hierarchy structure of geological medium on the forming of natural and technogenic geodynamic fields in the North-West part of the Amur geoblock
- Authors:
- I. Yu. Rasskazov
- B. G. Saksin
On the example of the South-Argun uranium ore district of Zabaikalie consideration is given to the interaction of regional and local fields of stresses. The district includes a number of deposits prone to rock bursts. The performed analysis contains data on recent geodynamics of the explored part of the Amur geoblock as well as on geomechanical and geologo-structural materials of Tulukuev caldera and of Antey deposit. It is shown that with the use of the M.A. Sadovsky relationship the indices of local structural forms of a row are subjected to unified laws of deformation and fracturing. Conclusion was made that at the beginning of deposit exploitation the direction of action of stress field within rock mass conformed to regional one, and then it considerably changed under influence of large-scale mining operations.
-
Date submitted2009-10-21
-
Date accepted2009-12-26
-
Date published2010-09-22
Modeling of geomechanical processes in mining the steeply pitching ore bodies of rockburst-hazardous deposits
The article contains the results of numerical modeling of stress-strain state in constructive elements of mining systems, applied at hazardous and prone to rook bursts deposits of the Far-East. Consideration is given to some stated regularities of forming of teсhnogenic stress field and geomechanical processes proceeding in rock mass of minable deposits which allow to substantiate a сomplex of measures for prevention of dynamic rock pressure manifestations.
-
Date submitted2009-09-17
-
Date accepted2009-11-07
-
Date published2010-06-25
Test as the form of the economics departments students final knowledge checking at studying the discipline «Business russian as the foreign language»
- Authors:
- E. A. Kolesova
The problems, appearing when compiling test materials for the students-foreigners of the economic professions, studying sphere of business communication, are analyzed in this article. The types of mistakes, allowed students in process of the performing the checking tasks, are systematized. It is offered the examples of the exercises, presented in test.
-
Date submitted2009-09-10
-
Date accepted2009-11-11
-
Date published2010-06-25
Stages of training activation methods development
- Authors:
- M. A. Perfilova
The article is dedicated to the problem of developing methods of training activation. Historical and pedagogical background for the development of these methods and distinguishes the stages of training activation methods development from the ancient times till nowadays are analysed. The brief chronological survey is presented tabular. The main features of the methods of active training are pointed out.
-
Date submitted2009-09-19
-
Date accepted2009-11-24
-
Date published2010-06-25
The forecast of the stress-strain state of massifs rocks in the bed deposits
- Authors:
- A. P. Gospodarikov
- M. A. Zatsepin
The variety of the mining and geological conditions with further increasing in depth of the development of bedded deposits leads to necessity for the analysis of stress-strain state near different types of excavations.
-
Date submitted2009-09-15
-
Date accepted2009-11-02
-
Date published2010-06-25
Mathematical modeling of stress-strain state of the mined seam deposits
- Authors:
- A. P. Gospodarikov
- M. A. Zatsepin
Development of bedded deposits is associated with man-caused distortion of specific environment – the rock massifs, which are very complicated in their composition, can vary significantly in mechanical properties and is characterized with a wide variety of laws and techniques to assess its stress-strain state.
-
Date submitted2009-07-22
-
Date accepted2009-09-22
-
Date published2010-04-22
Surveying methods for providing geodynamical safety of mining operations
- Authors:
- E. N. Kuznetsova
It is impossible to solve the main task of geodynamics without using technologies including traditional measurements of bench marks excursion, as well as new technologies of the end of XX – beginning of XXI century, such as photogrammetry, global positioning system, laser measurements and technologies of geophysical well logging. The paper concerns with the analysis of the mine surveying methods facilitating the solution of tasks related to the geodynamical safety assurance.
-
Date submitted2009-07-29
-
Date accepted2009-09-29
-
Date published2010-04-22
State examination of mineral reserves in the system of wise utilization of the earth’s interior
- Authors:
- Yu. A. Podturkin
The major problem of bodies of the government in sphere of regulation of attitudes protection of reserves creation of conditions for rational use of resources. The basic role in its decision is played with examination protection of reserves. Maintenance of effective carrying out of examination demands its constant perfection with reference to market conditions with use of the international criteria regarding both calculation and an estimation of stocks, and drawing up design and the engineering specifications on development of mineral deposits.
-
Date submitted2009-07-16
-
Date accepted2009-09-28
-
Date published2010-04-22
Efficient numerical methods for geotechnical problems
- Authors:
- M. A. Karasev
This article give a general overview of methods to solve large scale geotechnical problems, nonlinear high deformation and plastic problems, self contact of strata and application of high performance computing.
-
Date submitted2009-07-20
-
Date accepted2009-09-24
-
Date published2010-04-22
Methods for presetting of artificial yielding to anthracite pillars
- Authors:
- S. G. Stradanchenko
- N. V. Titov
- Yu. V. Turuk
The article contains the results of in situ investigation of influence of yielding pillars on the stability of protected workings with different modes of preset yielding. Graphs of roof movements in the workings protected with yielding pillars, are given.
-
Date submitted2008-10-13
-
Date accepted2008-12-15
-
Date published2009-12-11
A complex of gravi-, magneto-, electroprospecting аnd geoelectrochemical methods for local prediction and prospecting for hydrocarbon deposits
It is proposed to use interpretational spatial distributions of effective parameters of the medium under investigation instead of measured fields in the process of comprehensive prediction-prospecting investigations. There are used effectively: effective density, effective magnetization, intensity of probable sources of geochemical anomalies.
-
Date submitted2008-10-30
-
Date accepted2008-12-14
-
Date published2009-12-11
On correlation of element concentrations in spray нaloes of dispersion being fixed with different geoelectrochemical methods
- Authors:
- O. F. Putikov
- E. G. Margovich
The theoretical basis for correlation between the results of two geoelectrochemical methods at different depths of sampling is presented. The field data confirm the conclusion.