Date submitted2023-03-16
-
Date accepted2023-12-27
-
Date published2024-04-25
Comprehensive assessment of deformation of rigid reinforcing system during convergence of mine shaft lining in unstable rocks
Operation of vertical mine shafts in complex mining and geological conditions is associated with a number of features. One of them is a radial displacement of the concrete shaft lining, caused by the influence of mining pressure on the stress-strain state of the mine workings. A rigid reinforcing system with shaft buntons fixed in the concrete lining thus experiences elastoplastic deformations, their value increases with time. It results in deviation of conductors from design parameters, weakening of bolt connections, worsening of dynamic properties of geotechnical system “vehicle – reinforcing”, increase of wear rate of reinforcing system elements, increase of risks for creating an emergency situation. The article offers a comprehensive assessment of displacements of characteristic points of the bunton system based on approximate engineering relations, numerical modeling of the deformation process of the bunton system and laser measurements of the convergence of the inner surface of the concrete shaft lining. The method was tested on the example of the reinforcing system of the skip-cage shaft of the potash mine. Displacement of the characteristic points of the reinforcing system is determined by the value of radial displacements of the surface of the concrete shaft lining. Evaluation of the radial displacements was made using monitoring measurements and profiling data. The results obtained make it possible to justify the need and timing of repair works. It is shown that the deterioration of the reinforcing system at different levels occurs at different rates, defined, among other things, by mechanical properties of the rock mass layers located at a given depth.
-
Date submitted2022-04-05
-
Date accepted2022-07-21
-
Date published2022-11-10
Development of resource-saving technology for excavation of flat-lying coal seams with tight roof rocks (on the example of the Quang Ninh coal basin mines)
- Authors:
- Vladimir P. Zubov
- Le Quang Phuc
It is shown that the creation of the variants of resource-saving systems for the development of long-column mining is one of the main directions for improving the technological schemes for mining operations in the mines of the Kuang Nin coal basin. They provide a reduction in coal losses in the inter-column pillars and the cost of maintaining preliminary workings fixed with anchorage. The implementation of these directions is difficult (and in some cases practically impossible) when tight rocks are lying over the coal seam, prone to significant hovering in the developed space. In the Quang Ninh basin, 9-10 % of the workings are anchored, the operational losses of coal reach 30 % or more; up to 50 % of the workings are re-anchored annually. It is concluded that the real conditions for reducing coal losses and the effective use of anchor support as the main support of reusable preliminary workings are created when implementing the idea put forward at the St. Petersburg Mining University: leaving the coal pillar of increased width between the reused mine working and the developed space and its subsequent development on the same line with the stoping face simultaneously with the reclamation of the reused mine working.
-
Date submitted2021-04-20
-
Date accepted2022-04-26
-
Date published2022-07-13
Prediction of the stress-strain state and stability of the front of tunnel face at the intersection of disturbed zones of the soil mass
The article presents a numerical solution of the spatial elastic-plastic problem of determining the stability of the tunnel face soils at the intersection of disturbed zones of the soil mass. The relevance of the study is related to the need to take into account the zones of disturbed soils when assessing the face stability to calculate the parameters of the support. Based on the finite element method implemented in the PLAXIS 3D software package, the construction of a finite element system "soil mass-disturbance-face support" and modeling of the intersection of the disturbed zones of the soil mass were performed. To assess the condition of soils, deformation and strength criteria are taken. The deformation criterion is expressed by the value of the calculated displacement of the tunnel contour in the face, and the strength criterion - by the safety coefficient until the maximum values of the stress state are reached according to the Coulomb–Mohr criterion. The results of the study are presented in the form of histograms of the safety coefficient dependences on the distance to the disturbance at different bending stiffness of the face support structure, as well as the isofields of deformation development. The parameters of rockfall formation in the face zone at the intersection of zones of disturbed soils were determined. The local decrease in strength and deformation properties in the rock mass along the tunnel track should be taken into account when assessing the stability of the tunnel face and calculating the parameters of the support. Within the framework of the constructed closed system, a qualitative agreement of the simulation results with the case of a collapse in the face during the construction of the Vladimirskaya-2 station of the St. Petersburg Metro was obtained.
-
Date submitted2010-07-09
-
Date accepted2010-09-13
-
Date published2011-03-21
Application of the gpr method for investigetion of barring condition and outbarring spaces «Оctyabr’skiy» mine
- Authors:
- V. V. Glazunov
- S. M. Danilev
Results of the first application of GPR surveys of a mine cage for the purpose of an estimation of a technical condition barring and outbarring spaces on an example of a ventilating trunk «VC-1», mine «Octyabr’skiy» are considered.
-
Date submitted2009-08-22
-
Date accepted2009-10-19
-
Date published2010-02-01
The substantiation of reinforcing support of preparation mines in the ore massive of the Yakovlevskiy deposit
- Authors:
- Yu. N. Antonov
- V. Yu. Sinegubov
The paper justifies a design of reinforcing mine support of the protective roof at the priority high-grade ore mining site of the Yakovlevskiy deposit. Experience of mine roadway support with the KMP-A3 standing support has been analyzed. A reinforcing support is offered consisting of rock bolts back bracing the ore exposure, which best fits with continuous miner roadheading and consolidating stowing (concrete).
-
Date submitted2009-08-25
-
Date accepted2009-10-24
-
Date published2010-02-01
Geomechanical substantiation of parameters of the fastening of railway tunnels in the conditions of the North Caucasus
- Authors:
- N. A. Belyakov
The article presents the rationale of temporary supports used in the drilling of new mines, which provides for the construction of model projects of reconstruction of old tunnels. Finite-element method analyzed the changes of stress-strain state containing tunnel complex array during the drilling of new mines. Based on the analysis, a number of findings to explore the possibility of reducing the thickness of the permanent support of new mines in tunnel complex - the new tunnel, and transport and drainage culvert.
-
Date submitted2009-07-08
-
Date accepted2009-09-19
-
Date published2010-04-22
Geomechanical and hydrogeological problems оf the Yakovlevsky deposit development
- Authors:
- V. L. Trushko
- A. G. Protosenya
- R. E. Dashko
The article deals with geomechanical and hydrogeological problems under the Yakovlevsky ore deposit development including variations in strength properties. The estimation of feasible underground water inrush inside the mining excavation is done. In situ results of ore strata deformation around excavation are discussed. Numerical modeling of stress and strain in the waterproofing ore pillar due to partially backfilling of excavation is carried out.
-
Date submitted2008-10-21
-
Date accepted2008-12-12
-
Date published2009-12-11
Assessment of stress-strain state of temporary support during constructhion of station tunnels of the metro
- Authors:
- V. A. Maslak
In-situ testing technique of temporary support is given. The values of stress and normal force in arch and sides of steel support are shown. Determination of vertical load magnitude is done. It was determined that vertical load on support decreases by 1,54 times, if lag of support installation from the face is16 m.
-
Date submitted1951-07-11
-
Date accepted1951-09-18
-
Date published1952-12-23
Разработка тонких и средней мощности крутящихся пластов без применения деревянной крепи
- Authors:
- Unknown
Основным недостатком существующих методов разработки тонких и средней мощности крутопадающих пластов угля является применение деревянной крепи в очистных забоях. Крепление очистных забоев производится исключительно ручным способом и представляет наиболее опасную, тяжелую и трудоемкую операцию. Так, трудовые затраты на крепление, доставку леса и управление горным давлением обычно составляют от 50 до 80% общих трудовых затрат в очистном забое (см. статью). Около двух третей чистого времени работы забойщик затрачивает на крепление. Если учесть еще лесодоставку и работы по управлению горным давлением (установку органной крепи и пр.), то суммарный расход времени на эти операции, включая крепление, составит приблизительно 80% общих трудовых затрат в очистном забое на добычу угля. В Донбассе превалирующее распространение получили отбойные молотки, что определяет значительно большую трудоемкость работ по отбойке угля. Поэтому работы, связанные с креплением и управлением горным давлением, здесь составляют приблизительно 50—60% общих трудовых затрат в очистном забое. Но в дальнейшем, в связи с внедрением комбайнов, удельный вес этих работ значительно увеличится и достигнет также 80—85%.
-
Date submitted1948-07-10
-
Date accepted1948-09-24
-
Date published1949-11-04
Determination of the density of the stoping zone fastening
- Authors:
- O. B. Bokii
When designing the standards for the consumption of timber for coal mining, it is especially important to correctly determine the consumption of timber for the lining of workings, which is from 50 to 70% of the total timber consumption for coal mining. The purpose of this work is to attempt to provide a method for the theoretical determination of the required density of lining of working faces based on the theory of limiting and equivalent spans developed by V.D. Slesarev. In accordance with this goal, the first two paragraphs of the work provide a brief exposition of the theory of limiting and equivalent spans according to V.D. Slesarev; § 3 provides an application of this theory to the issue of determining the magnitude of rock pressure on the lining of workings with a constant width; § 4 presents the method of successive approximations proposed by the author for calculating the expected pressure on the lining of working faces; § 5 provides a formula for determining the required density of lining of a working face; § 6 provides the results of calculating the pressure according to the proposed method for a specific case of practice—the 1st eastern face at Mine B in the Donetsk Basin.