Submit an Article
Become a reviewer
Vol 186
Pages:
94-98
Download volume:
RUS

The substantiation of reinforcing support of preparation mines in the ore massive of the Yakovlevskiy deposit

Authors:
Yu. N. Antonov1
V. Yu. Sinegubov2
About authors
  • 1 — Ph.D. assistant lecture Saint Petersburg State Mining Institute (Technical University)
  • 2 — Postgraduate student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-22
Date accepted:
2009-10-19
Date published:
2010-02-01

Abstract

The paper justifies a design of reinforcing mine support of the protective roof at the priority high-grade ore mining site of the Yakovlevskiy deposit. Experience of mine roadway support with the KMP-A3 standing support has been analyzed. A reinforcing support is offered consisting of rock bolts back bracing the ore exposure, which best fits with continuous miner roadheading and consolidating stowing (concrete).

Keywords:
reinforcing mine support standing support protective roof mining site ore deposit rock bolts back bracing ore exposure continuous consolidating stowing
Go to volume 186

References

  1. Пахалуев В.Ф. Перспективы применения анкерной крепи в рудных выработках Яковлевского рудника / В.Ф.Пахалуев, Ю.Н.Огородников, А.Б.Максимов // Зап. Горного института. 2006. Т. 168. С. 181-183.
  2. ТУ 3142-001-58163333-07. Крепь штанговая сталеорганная (анкерная) ОАО «ВостНИГРИ». Новокузнецк, 2007 г. 7 c.

Similar articles

Synthesis of means supply water to waterreceiver, Driven along long face
2010 V. I. Medvedkov, M. I. Trishin, A. A. Sidorenko
The strategic analysis of resource conservation technology capabilities for the underground gas storage facilities
2010 G. S. Elizarova
Precipitation of alumina liquor inclusive potassium
2010 V. V. Radko
Mathematical model of impact energy pulse changes in «rock drill – rod – rock» system of rotary-percussion drill rigs
2010 S. A. Resheten
Selection of optimal scheme of a reclamation of mining damp of the open-cast «Mejdyrechensky»
2010 I. R. Levchuk
Geotechnical engineering and hydrogeological specifics of estimate high-rise buildings construction and operation conditions (in terms of local zone on the right bank of Neva river)
2010 A. M. Zhukova