Submit an Article
Become a reviewer
Vol 186
Pages:
99-103
Download volume:
RUS

Geomechanical substantiation of parameters of the fastening of railway tunnels in the conditions of the North Caucasus

Authors:
N. A. Belyakov
About authors
  • Student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-25
Date accepted:
2009-10-24
Date published:
2010-02-01

Abstract

The article presents the rationale of temporary supports used in the drilling of new mines, which provides for the construction of model projects of reconstruction of old tunnels. Finite-element method analyzed the changes of stress-strain state containing tunnel complex array during the drilling of new mines. Based on the analysis, a number of findings to explore the possibility of reducing the thickness of the permanent support of new mines in tunnel complex - the new tunnel, and transport and drainage culvert.

Keywords:
tunnel temporary support permanent support stresses deformation reconstruction modeling
Go to volume 186

References

  1. Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. 2-е изд., перераб. и доп. М.: Недра, 1994. 382 с.

Similar articles

Geotechnical engineering and hydrogeological specifics of estimate high-rise buildings construction and operation conditions (in terms of local zone on the right bank of Neva river)
2010 A. M. Zhukova
The unit for gravity concentration of fine particles
2010 Ya. V. Kuskova
Calculation of material streams of the pirometallurgical cycle of processing of copper sulphidic raw materials
2010 N. V. Danilova
Advance of the metallurgical limestone shaft kilning process control system
2010 N. I. Koteleva
Influence of detonation parameters of explosives on energy efficiency of explosive destruction of rocks
2010 M. G. Menzhulin, P. I. Afanasev, A. V. Trofimov
The valuation of cost of the mining company in the reorganization
2010 D. M. Dmitrieva, T. V. Ponomarenko