Geomechanical substantiation of parameters of the fastening of railway tunnels in the conditions of the North Caucasus

Authors:
N. A. Belyakov
About authors
  • Student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-25
Date accepted:
2009-10-24
Date published:
2010-02-01

Abstract

The article presents the rationale of temporary supports used in the drilling of new mines, which provides for the construction of model projects of reconstruction of old tunnels. Finite-element method analyzed the changes of stress-strain state containing tunnel complex array during the drilling of new mines. Based on the analysis, a number of findings to explore the possibility of reducing the thickness of the permanent support of new mines in tunnel complex - the new tunnel, and transport and drainage culvert.

Keywords:
tunnel temporary support permanent support stresses deformation reconstruction modeling
Go to volume 186

References

  1. Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. 2-е изд., перераб. и доп. М.: Недра, 1994. 382 с.

Similar articles

The North African campaign and its role in the World War II
2010 O. O. Tikhonov, K. V. Fedorov, O. Yu. Plenkov
Technology of associative representations in training of athletes the techniques of throwing curling stones
2010 E. A. Izotov
The unit for gravity concentration of fine particles
2010 Ya. V. Kuskova
The ontogenetic analysis of the vein quartz of some deposits of Southern Urals mountains
2010 E. L. Kotova
New constructions of belt-ropes conveyors for the mountain enterprises
2010 Yu. D. Tarasov, A. V. Kopteva
The improvement of selective extraction of thick potash seams mined with room and pillar mining method
2010 Yu. G. Sirenko, M. Yu. Brychkov, E. R. Kovalsky