Geomechanical substantiation of parameters of the fastening of railway tunnels in the conditions of the North Caucasus

Authors:
N. A. Belyakov
About authors
  • Student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-25
Date accepted:
2009-10-24
Date published:
2010-02-01

Abstract

The article presents the rationale of temporary supports used in the drilling of new mines, which provides for the construction of model projects of reconstruction of old tunnels. Finite-element method analyzed the changes of stress-strain state containing tunnel complex array during the drilling of new mines. Based on the analysis, a number of findings to explore the possibility of reducing the thickness of the permanent support of new mines in tunnel complex - the new tunnel, and transport and drainage culvert.

Keywords:
tunnel temporary support permanent support stresses deformation reconstruction modeling
Go to volume 186

References

  1. Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. 2-е изд., перераб. и доп. М.: Недра, 1994. 382 с.

Similar articles

Using of steam condensing way of dust-depressing in different manufacturing operations during mining
2010 Yu. D. Smirnov, A. A. Kamenskii, A. V. Ivanov
The valuation of cost of the mining company in the reorganization
2010 D. M. Dmitrieva, T. V. Ponomarenko
Geotechnical engineering features of the estimation of stability of heavy constructions of designed cement works in Novorossiysk
2010 Yu. V. Khaliullina
Predictive calculations for grinding flowsheets
2010 A. O. Romashev
The substantiation of reinforcing support of preparation mines in the ore massive of the Yakovlevskiy deposit
2010 Yu. N. Antonov, V. Yu. Sinegubov
The strategic analysis of resource conservation technology capabilities for the underground gas storage facilities
2010 G. S. Elizarova