Submit an Article
Become a reviewer
Vol 186
Pages:
99-103
Download volume:
RUS

Geomechanical substantiation of parameters of the fastening of railway tunnels in the conditions of the North Caucasus

Authors:
N. A. Belyakov
About authors
  • Student Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-08-25
Date accepted:
2009-10-24
Date published:
2010-02-01

Abstract

The article presents the rationale of temporary supports used in the drilling of new mines, which provides for the construction of model projects of reconstruction of old tunnels. Finite-element method analyzed the changes of stress-strain state containing tunnel complex array during the drilling of new mines. Based on the analysis, a number of findings to explore the possibility of reducing the thickness of the permanent support of new mines in tunnel complex - the new tunnel, and transport and drainage culvert.

Keywords:
tunnel temporary support permanent support stresses deformation reconstruction modeling
Go to volume 186

References

  1. Булычев Н.С. Механика подземных сооружений: Учеб. для вузов. 2-е изд., перераб. и доп. М.: Недра, 1994. 382 с.

Similar articles

Trends in using technology to improve pipeline hydrotransport
2010 N. V. Golovachev
The North African campaign and its role in the World War II
2010 O. O. Tikhonov, K. V. Fedorov, O. Yu. Plenkov
Definition of dependent cadastral value estimation indicators of urban land sections (on the example of Kostomuksha)
2010 O. Yu. Lepikhina
Calculation of material streams of the pirometallurgical cycle of processing of copper sulphidic raw materials
2010 N. V. Danilova
Using of electric field for manufacturing and nondestructive testing of a capacitor sensors and actuators
2010 N. S. Pshchelko, V. V. Buevich
The valuation of cost of the mining company in the reorganization
2010 D. M. Dmitrieva, T. V. Ponomarenko