Geomechanical and hydrogeological problems оf the Yakovlevsky deposit development

Authors:
V. L. Trushko1
A. G. Protosenya2
R. E. Dashko3
About authors
  • 1 — Ph.D., Dr.Sci. Saint Petersburg State Mining Institute (Technical University)
  • 2 — Ph.D., Dr.Sci. Professor Saint Petersburg State Mining Institute (Technical University)
  • 3 — Ph.D., Dr.Sci. Professor Saint Petersburg State Mining Institute (Technical University)
Date submitted:
2009-07-08
Date accepted:
2009-09-19
Date published:
2010-01-01

Abstract

The article deals with geomechanical and hydrogeological problems under the Yakovlevsky ore deposit development including variations in strength properties. The estimation of feasible underground water inrush inside the mining excavation is done. In situ results of ore strata deformation around excavation are discussed. Numerical modeling of stress and strain in the waterproofing ore pillar due to partially backfilling of excavation is carried out.

Keywords:
ore strength undeground waters monitoring development deposit support backfilling
Go to volume 185

References

  1. Разработка и внедрение экологически безопасных комбинированных технологий добычи и комплексной переработки руд, обеспечивающих ввод в эксплуатацию и освоение уникального Яковлевского месторождения богатых железных руд / В.С.Литвиненко, Р.Э.Дашко, В.П.Зубов, А.Г.Протосеня, В.Л.Трушко, А.С.Клямко, В.Ф.Плащинский, А.А.Пранович // Приложение к «Запискам Горного института», 2007.
  2. Антонов Ю.Н. Геомеханическое обоснование устойчивости параллельных взаимовлияющих горизонтальных выработок в рудном массиве: Автореф. дис. … канд. техн. наук / СПГГИ. СПб, 2009.

Similar articles

Numerical modelling of the lining stress stateof column stations without lateral platforms
2010 D. N. Petrov, P. A. Demenkov, D. A. Potemkin
Numerical assessment of stress-strain field in vicinity of large open pit mine taking into account geomechanical, geological and mining factors
2010 A. A. Kozyrev, I. E. Semionova, V. V. Rybin, I. M. Avetisyan
Provision of safe coal mining with due account оf cleanup works at adjacent seams
2010 M. A. Ilyashov
Monitoring of actual reserves as an instrument for higher assessment of cost of mining business under conditions of adaptation of russian assessments of reserves to international standards
2010 S. V. Shaklein
Cycles of the Earth and Sun – the important factor оf activity of geodynamic processes at coal- and ore mines
2010 A. N. Shabarov, B. G. Tarasov
Conceptual principles of mining company’s balanced development in condition of necessity of innovation transformation
2010 A. A. Gurev