Date submitted2022-11-08
-
Date accepted2022-11-21
-
Date published2023-02-27
Assessment of the role of the state in the management of mineral resources
Mineral resources as natural capital can be transformed into human, social and physical capital that guarantees the sustainable development of a country, exclusively through professional public management. Public management of a country's mineral resource potential is seen as an element of transnational governance which provides for the use of laws, rules and regulations within the jurisdictional and sectoral capabilities of the state, minimising its involvement as a producer of minerals. The features of the ideology of economic liberalism, which polarises the societies of mineral-producing countries and denies the role of the state as a market participant, have been studied. The analysis of the influence of the radical new order of neoliberal world ideology on the development of the extractive sector and state regulation has been presented.
-
Date submitted2020-06-16
-
Date accepted2021-03-29
-
Date published2021-09-20
Empirical regularities investigation of rock mass discharge by explosion on the free surface of a pit bench
- Authors:
- Igor A. Alenichev
- Ruslan A. Rakhmanov
Minimizing the discharge of blasted rock mass into the developed space of the pit is a very relevant area for study, as it allows to increase the processability of work and reduce the cost of mining. The article presents the results of experimental industrial explosions, during which the study of this issue was conducted. The main purpose of the work was to establish the key factors affecting the volume of rock mass discharge to the pit haulage berm. During the analysis of the world experience of research on this topic, the key factors affecting the formation of collapse and discharge – natural and technological – are identified. The method of conducting experiments and collecting data for analyzing the influence of technological parameters of location, charging and initiation of wells on the volume of rock mass discharge is described. It is established that the main discharge to the pit haulage berm is formed by the volume of rock mass limited by the prism of the slope angle. With a sufficient rock mass displacement from the edge of the bench crest towards the center of the block, only the wells of the 1st and 2nd rows participate in the discharge formation. Empirical dependences of the total volume of rock mass discharge on the length of the block along the bench crest, the specific consumption of explosives, the size of a rock piece P 50 and the rate of rock breaking are obtained. The obtained results can be used to design the parameters of the drilling and blasting operations (DBO), as well as to predict and evaluate the possible consequences of a mass explosion in similar mining and geological conditions.
-
Date submitted2021-01-21
-
Date accepted2021-04-19
-
Date published2021-04-26
Justification of the use of a vegetal additive to diesel fuel as a method of protecting underground personnel of coal mines from the impact of harmful emissions of diesel-hydraulic locomotives
Equipment with diesel engines is used in all mining enterprises. Monorail diesel transport is of great importance in coal mines, as it facilitates the heavy labor of workers when transporting materials and people, fixing mining workings, refueling and repairing equipment, which leads to an increase in the speed of tunneling operations. Reducing the concentration of harmful gases from diesel-hydraulic locomotives at the workplaces of coal mine locomotive drivers can be ensured by the use of additives to diesel fuel that reduce the volume of harmful gas emissions during the operation of diesel-hydraulic locomotives. Additive ester-based on vegetal oil in the amount of 5 mass % in a mixture with hydrotreated diesel fuel reduces the concentration of carbon monoxide by 19-60 %, nitrogen oxides by 17-98 %, depending on the operating mode of the engine, the smoke content of the exhaust gases is reduced to 71 %. There is an improvement in working conditions at the workplace of the driver of a diesel-hydraulic locomotive by the chemical factor due to the reduction of the class of working conditions from 3.1. to 2.
-
Date submitted2019-11-04
-
Date accepted2020-01-12
-
Date published2020-10-08
PDC cutter pressure on plastic-brittle rock in the process of its destruction
- Authors:
- Oleg B. Trushkin
- Hamzja I. Akchurin
Presently, there are no methods for calculating the parameters of the drilling practices with rock-cutting tools equipped with polycrystalline diamond composite (PDC cutters). To create such a method requires the studying their work. The article presents the results of bench studies of the PDC cutters in the process of a rock sample breakdown when reproducing the actual layout of the cutters on the working surface of the bit. An important parameter of PDC cutters operation, which is necessary for the bit load analysis, is the pressure of the cutters on the rock during its breakdown. The total pressure of a cutter on the rock can be broken into two mutually perpendicular components: the forcing pressure and the cutting pressure. It is proposed to evaluate the PDC cutters loading at breakage of rocks of different hardness using relative values of forcing and cutting pressures, which are calculated relative to the yield strength of the rock by the die. It is established that the variability of the average relative pressures of forcing and cutting is significantly influenced by drifting per bit turnover and the radius of the cutter on the bit. The dependences of the maximum relative pressures of PDC cutters at the plastic-brittle rock breakdown on the drifting per bit turnover and the radius of the cutter location on the bit are obtained. It has been established that when drifting up to 0.4 mm per turn, the main mechanism of breakdown is cutting, and with the increase of the breakdown depth, the process of forcing becomes decisive.
-
Date submitted2017-08-25
-
Date accepted2017-11-17
-
Date published2018-02-22
Improved estimation of open pit excavator capacity
- Authors:
- S. N. Zharikov
The paper addresses issues related to estimation of operational time for open pit excavators during truck loading operations. The author analyzes the method of annual capacity estimation and highlights disagreements in different ways of operational time logging. Recommendations are offered concerning estimation of excavator capacity taking into account its repair cycle. The paper contains an analysis of the cyclical nature of various types of maintenance in the interval between capital repairs as a function of operational time. Guidelines are proposed that allow to calculate annual production days of the excavator with regards to the repair cycle and adjusted utilization coefficient throughout the shift. It has been established that decreasing the coefficient of excavator utilization throughout the shift and more precise logging of annual work days lead to a slower decrease in estimated machine capacity than the one described in the reference literature. According to the suggested method, estimated excavator capacity is more than 23 % higher than the value stated in the reference literature.
-
Date submitted2014-07-14
-
Date accepted2014-08-29
-
Date published2014-12-22
The development of ideas for improving explosive destruction of rock masses – the basis of progress in mining
- Authors:
- S. D. Viktorov
- V. M. Zakalinskii
The article describes the main areas of research in the field of the explosive destruction of rocks used in mining. The results of studies carried out in recent years are presented. Information on possi-ble applications for breaking up rocks of various energy sources is provided. Ideas are given on the possibility of raising the efficiency of explosives for mining rock by increasing the scale of the ex-plosive destruction. Information about the widespread adoption of these methods at Russia’s biggest iron ore companies is presented. Recent results on the fracture processes at different levels of scale up to destruction to form particles of submicron size are shown. Studying the structural transforma-tions of rock mass at the micro and macro features of allocation and distribution of energy in the charges of various designs allowed us to control the action of a new explosion by breaking up rock masses and the complex structure of multicomponent fields.
-
Date submitted2014-07-12
-
Date accepted2014-08-24
-
Date published2014-12-22
The study of structural features of outburst coal seams
- Authors:
- V. N. Zakharov
- O. N. Malinnikova
A study of the structural features of outburst-dangerous and non-outburst dangerous coal layers was conducted. It was shown that coal taken from a sudden outburst zone has a significantly greater sorption surface than coal from the same layer which was not part of the sudden outburst. The size of the sorption surface of coal is affected by its history up to that point; thus the heating of the coal sample during its preparation enlarges its sorption surface. An electron microscope study of coal surfaces has shown that for coal from outburst-dangerous layers, a disturbed structure with a large quantity of fissures and partings the size of 1 micrometer is typical. Under the same enlargement, a coal structure from safe coal layers is much more uniform. The study of digital images of coal surfaces, taken with the help of an electron microscope, shows that the structural institution of surface elements may be presented by multifractal analysis, with its spectrum of fractal dimensions, which allows us to state quantitative distinctions in coal microstructures for outburst-dangerous layers. Coal from outburst-dangerous layers has a greater set of structural elements, and therefore a spectrum of fractal dimensions that is 1.5-2 times wider than for nonoutburst dangerous layers.
-
Date submitted2009-10-12
-
Date accepted2009-12-19
-
Date published2010-09-22
Preventive measures of gas-dynamic phenomena in the workings drivage on the rockburst- outburst-hazardous seams under extremely complicated geological and mining conditions
- Authors:
- V. P. Kostromin
A complex of measures preventing the manifestation of rockbursts and sudden outbursts of coal and gas has been developed. Criteria of forecasting, an assessment of efficiency of the preventive measures are suggested, as well as the necessary technical facilities and technologies.
-
Date submitted2009-10-22
-
Date accepted2009-12-27
-
Date published2010-09-22
Preconditions for prediction of technogenic seismic activity by cycles of objects of the solar system
- Authors:
- B. G. Tarasov
- A. G. Olovianny
- L. V. Bugaenko
The paper contains the statistical rows of rockbursts, sudden outbursts of methane at coal mines and ore mines in Russia for the period from 1954 to 2007, as well as the reflection in them of the eleven-year cycles of the Sun activity. Some results are presented of computer modeling of activation periods of outburst-hazardous state of rock mass at coal mines of the Kuzbass basin. Recommendations are given.
-
Date submitted2009-09-24
-
Date accepted2009-11-08
-
Date published2010-06-25
Influence of extra-linguistic factors on the old english mining terminology formation in ancient times
- Authors:
- P. V. Borisova
The article represents historical limits of periods of the English mining terminology formation. On the basis of extra-linguistic data there has been made an attempt to find the terms which became the foundation for the English mining terminology as a scientific sublanguage.
-
Date submitted2009-08-13
-
Date accepted2009-10-09
-
Date published2010-02-01
Research of the probability of sudden salt rock outbursts on the basis of measuring of their volume shrinkage
- Authors:
- Yu. G. Sirenko
- A. V. Brovko
- A. A. Sankovskii
The article is devoted to research of probability of sudden salt rocks outbursts on the basis of measuring of their volume shrinkage. The design scheme of the device for measuring quantity of the microincluded gases in rocks is proposed. Criteria to estimate the possibility of sudden salt rocks outbursts is revealed.
-
Date submitted2008-10-06
-
Date accepted2008-12-10
-
Date published2009-12-11
Appearance of entropy principle in distribution оf the gold mass while formation of minable gold mineralization
- Authors:
- S. V. Sendek
The rule of the entropy distributiveness for mass of the metal in gold ores is detected at different scale levels. This regularity is resulted as a consequence of redistribution of the gold and host rocks after their primary conditions. Revealing of those rules may allow reviewing the notions on nature and genesis of gold mineralizaition.