Submit an Article
Become a reviewer

Search articles for by keywords:
digital economy

Geotechnical Engineering and Engineering Geology
  • Date submitted
    2023-09-05
  • Date accepted
    2024-11-07
  • Date published
    2025-02-25

Investigation of the accuracy of constructing digital elevation models of technogenic massifs based on satellite coordinate determinations

Article preview

At all stages of the life cycle of buildings and structures, geodetic support is provided by electronic measuring instruments – a laser scanning system, unmanned aerial vehicles, and satellite equipment. In this context, a set of geospatial data is obtained that can be presented as a digital model. The relevance of this work is practical recommendations for constructing a local quasigeoid model and a digital elevation model (DEM) of a certain accuracy. A local quasigeoid model and a DEM were selected as the study objects. It is noted that a DEM is often produced for vast areas, and, therefore, it is necessary to build a local quasigeoid model for such models. The task of assessing the accuracy of constructing such models is considered; its solution will allow obtaining a better approximation to real data on preassigned sets of field materials. A general algorithm for creating both DEM and local quasigeoid models in the Golden Software Surfer is presented. The constructions were accomplished using spatial interpolation methods. When building a local quasigeoid model for an area project, the following methods were used: triangulation with linear interpolation (the least value of the root mean square error (RMSE) of interpolation was 0.003 m) and kriging (0.003 m). The least RMSE value for determining the heights by control points for an area project was obtained using the natural neighbour (0.004 m) and kriging (0.004 m) methods. To construct a local quasigeoid model for a linear project, the following methods were applied: kriging (0.006 m) and triangulation with linear interpolation (0.006 m). Construction of the digital elevation model resulted in the least aggregate value of the estimated parameters: on a flat plot of the earth’s surface – the natural neighbour method, for a mountainous plot with anthropogenic topography – the quadric kriging method, for a mountainous plot – quadric kriging.

How to cite: Bryn M.Y., Mustafin M.G., Bashirova D.R., Vasilev B.Y. Investigation of the accuracy of constructing digital elevation models of technogenic massifs based on satellite coordinate determinations // Journal of Mining Institute. 2025. Vol. 271 . p. 95-107. EDN ZDVPPC
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-01-21
  • Date accepted
    2023-09-20
  • Date published
    2023-12-25

Adaptation of transient well test results

Article preview

Transient well tests are a tool for monitoring oil recovery processes. Research technologies implemented in pumping wells provide for a preliminary conversion of measured parameters to bottomhole pressure, which leads to errors in determining the filtration parameters. An adaptive interpretation of the results of well tests performed in pumping wells is proposed. Based on the original method of mathematical processing of a large volume of field data for the geological and geophysical conditions of developed pays in oil field, multidimensional models of well flow rates were constructed including the filtration parameters determined during the interpretation of tests. It is proposed to consider the maximum convergence of the flow rate calculated using a multidimensional model and the value obtained during well testing as a sign of reliability of the filtration parameter. It is proposed to use the analysis of the developed multidimensional models to assess the filtration conditions and determine the individual characteristics of oil flow to wells within the pays. For the Bashkirian-Serpukhovian and the Tournaisian-Famennian carbonate deposits, the influence of bottomhole pressure on the well flow rates has been established, which confirms the well-known assumption about possible deformations of carbonate reservoirs in the bottomhole areas and is a sign of physicality of the developed multidimensional models. The advantage of the proposed approach is a possibility of using it to adapt the results of any research technology and interpretation method.

How to cite: Martyushev D.A., Ponomareva I.N., Shen W. Adaptation of transient well test results // Journal of Mining Institute. 2023. Vol. 264 . p. 919-925. EDN VHGTUT
Energy industry
  • Date submitted
    2021-05-12
  • Date accepted
    2022-05-11
  • Date published
    2023-07-19

Application of the cybernetic approach to price-dependent demand response for underground mining enterprise electricity consumption

Article preview

The article considers a cybernetic model for the price-dependent demand response (DR) consumed by an underground mining enterprise (UGME), in particular, the main fan unit (MFU). A scheme of the model for managing the energy consumption of a MFU in the DR mode and the implementation of the cybernetic approach to the DR based on the IoT platform are proposed. The main functional requirements and the algorithm of the platform operation are described, the interaction of the platform with the UGME digital model simulator, on which the processes associated with the implementation of the technological process of ventilation and electricity demand response will be simulated in advance, is shown. The results of modeling the reduction in the load on the MFU of a mining enterprise for the day ahead are given. The presented solution makes it possible to determine in advance the necessary power consumption for the operation of the main power supply unit, manage its operation in an energy-saving mode and take into account the predicted changes in the planned one (e.g., when men hoisting along an air shaft) and unscheduled (e.g., when changing outdoor air parameters) modes. The results of the study can be used to reduce the cost of UGME without compromising the safety of technological processes, both through the implementation of energy-saving technical, technological or other measures, and with the participation of enterprises in the DR market. The proposed model ensures a guaranteed receipt of financial compensation for the UGME due to a reasonable change in the power consumption profile of the MFU during the hours of high demand for electricity, set by the system operator of the Unified Energy System.

How to cite: Nikolaev A.V., Vöth S., Kychkin A.V. Application of the cybernetic approach to price-dependent demand response for underground mining enterprise electricity consumption // Journal of Mining Institute. 2023. Vol. 261 . p. 403-414. DOI: 10.31897/PMI.2022.33
Economic Geology
  • Date submitted
    2022-04-07
  • Date accepted
    2023-04-21
  • Date published
    2023-08-28

Development of a new assessment system for the applicability of digital projects in the oil and gas sector

Article preview

Digital transformation is one of the global trends that has covered most sectors of the economy and industry. For oil and gas companies, the introduction of digital technologies has become not just a trend, but one of the factors for ensuring competitiveness and maintaining a stable position in the market in a rapidly changing macro environment. At the same time, despite the positive effects achieved, digital transformation is a complex process from the point of view of implementation and is associated with high technological, financial, and economic risks. The work aims to develop and test a new system for evaluating the applicability of digital projects in the oil and gas sector. The research methodology includes the application of the Gartner curve, methods of expert assessments, and tools for assessing the economic efficiency of investment projects. The developed assessment system is based on a comprehensive accounting of four components: the level of digital maturity of the company; compliance of the implemented technology with the goals and objectives of the organization; the level of reliability of the implemented technology; the level of innovation of the implemented project. Particular attention is paid to the practical testing of the proposed methodology based on the evaluation of a digital project implemented by a Russian oil and gas company.

How to cite: Cherepovitsyn A.E., Tretyakov N.A. Development of a new assessment system for the applicability of digital projects in the oil and gas sector // Journal of Mining Institute. 2023. Vol. 262 . p. 628-642. EDN QYBHMC
Metallurgy and concentration
  • Date submitted
    2020-06-23
  • Date accepted
    2021-03-02
  • Date published
    2021-04-26

Automated digitization of radial charts

Article preview

Radial charts were commonly used in the industry to allow retrospective assessment of technological parameters. Today it is relevant to digitize the obtained data in order to simplify the automation of technological processes. Digitization of radial charts by means of standard methods is carried out with the help of human labor at significant time costs. The article proposes an automated method for digitizing radial charts using software, developed in the LabVIEW programming environment. The results of processing radial charts are displayed on the screen in numerical and graphical form, and can also be exported to a file (for example, to Notepad or MS Excel). The presented technique can be applied to images obtained on a color or black-and-white scanner, which minimizes geometric distortions, associated with the conversion of a paper document into electronic form, and ensures recognition quality of the clear plot line with an average relative error of up to 3 %. In case of ink fading or perspective photos of the diagram, the value of relative error can reach 8 %, as a result of which additional manual correction of the data will be required.

How to cite: Vasilyeva N.V., Boikov A.V., Erokhina O.O., Trifonov A.Y. Automated digitization of radial charts // Journal of Mining Institute. 2021. Vol. 247 . p. 82-87. DOI: 10.31897/PMI.2021.1.9
Geoeconomics and Management
  • Date submitted
    2019-10-15
  • Date accepted
    2019-11-19
  • Date published
    2020-10-08

Oilfield service companies as part of economy digitalization: assessment of the prospects for innovative development

Article preview

The digital transformation of the economy as the most important stage of scientific and technological progress and transition to a new technological structure is becoming one of the determining factors in the development and competitiveness of the domestic upstream sector. Prospects for innovative development of oilfield service companies are the key technological areas within the first project of the Hi-Tech Strategy of the German Government until 2020 – “Industry 4.0”. The purpose of this study is to assess the prospects for innovative development of the domestic oilfield service industry in the context of the digitalization of the oil and gas industry. The subject of the research is the process of the formation of key technological lines of “Industry 4.0” and their impact on the domestic oil and gas sector. The research is based on logical-theoretical and empirical analyses. The main factors that determine processes of digital transformation in the oil and gas industry are considered; the results of digitalization processes in the largest foreign and Russian industry companies of the upstream and oilfield services segments are presented. The information base is made up of data from oilfield service and oil and gas producing companies, presented on the official websites of companies in the public domain on the Internet. It has been proven that, unlike the world's leading companies in oilfield services segment, independent domestic oilfield service companies provide mainly traditional service technologies in a fairly narrow range. The limited scope of functioning and technological capabilities of Russian companies is explained by the lack of necessary investment in development and expansion of business, as well as interest on the part of the state and corporate sectors in the development and replication of domestic technologies and the formation of a full-fledged oilfield services market in Russia.

How to cite: Razmanova S.V., Andrukhova O.V. Oilfield service companies as part of economy digitalization: assessment of the prospects for innovative development // Journal of Mining Institute. 2020. Vol. 244 . p. 482-492. DOI: 10.31897/PMI.2020.4.11
Oil and gas
  • Date submitted
    2019-10-30
  • Date accepted
    2020-02-03
  • Date published
    2020-10-08

Concept of technology for determining the permeability and porosity properties of terrigenous reservoirs on a digital rock sample model

Article preview

The aim of the article is to form the concept of technology for determining the permeability and porosity properties of terrigenous reservoirs using mathematical modeling methods on a digital rock sample model. Digital rock sample modeling is used to assess geological oil reserves. The article presents the concept of digital rock sample modeling technology, which allows carrying out qualitative investigations to determine the permeability and porosity characteristics of the formation, including modeling the pore space and filtration processes. The essence of the concept is that the simulation model of the microstructure for the digital model is formed on the basis of a large number of parameters obtained during lithological and petrographic investigations of thin sections, a study of the sludge and geophysical investigations of wells. The acquired model can be used as a basis for subsequent modeling of filtration processes. Conductivity of single channels of the formed model can be calculated using molecular dynamics methods, models of Boltzmann's lattice equations, and other mathematical models and methods. Based on the results of the study carried out, the application of stochastic packing methods for modeling the structure of the pore space in the digital rock sample model of terrigenous reservoirs is substantiated. In connection with the development of computer and nanotechnologies and their use in the oil and gas industry, solutions that allow obtaining adequate results of digital rock sample models are of high importance and relevance for the production sector. It is especially important to use digital rock sample models in the study of reservoir rocks of shelf fields in the western part of the Russian Arctic, oil shales, rocks represented by loose weakly cemented reservoirs, and others, which are complex for physical experiments.

How to cite: Belozerov I.P., Gubaydullin M.G. Concept of technology for determining the permeability and porosity properties of terrigenous reservoirs on a digital rock sample model // Journal of Mining Institute. 2020. Vol. 244 . p. 402-407. DOI: 10.31897/PMI.2020.4.2
Geoeconomics and Management
  • Date submitted
    2019-02-26
  • Date accepted
    2019-05-22
  • Date published
    2019-08-23

Systemic Diagnostics of the Arctic Industry Development Strategy

Article preview

The article analyzes organizational and economic problems of the industry in the Arctic and discloses methods and tools for researching these problems. An attempt to use the method of system diagnostics is made, which has established itself as a basis for determining the development strategy of industry in the Arctic zone of the Russian Federation (AZRF). This method allows to explore the mechanism of natural resources development in the Arctic, such as hydrocarbons and marine biological resources; as well as the organization of logistics and transport corridors for trade of goods produced in the North and in the central regions of Russia. The role, significance and content of the strategy as an essential element of the system for managing natural wealth development in the Arctic in the context of its growing importance in development of global transport corridor are revealed. Importance of a systematic approach to the development of industry in the Arctic is substantiated, it will ensure development of all investors interested in this region; will allow the state, large corporations, small and medium-sized businesses to work together for the long term. The proposed method for system diagnostics of strategizing the development of industrial potential in the AZRF can be used in the implementation of «Development Strategy for the Arctic Region» as part of roadmap realization for the Arctic region.

How to cite: Bogachev V.F., Gorenburgov M.A., Alekseeva M.B. Systemic Diagnostics of the Arctic Industry Development Strategy // Journal of Mining Institute. 2019. Vol. 238 . p. 450-458. DOI: 10.31897/PMI.2019.4.450
Geology
  • Date submitted
    2018-11-20
  • Date accepted
    2018-12-28
  • Date published
    2019-04-23

Refined assessment of seismic microzonation with a priori data optimisation

Article preview

The work is devoted to the issues of seismic microzonation representativeness, which is amongst the mandatory assessments that precedes civil and industrial construction. In addition to the practical approach and in accordance with the normative documentation, the authors propose parametric interpretation of the remote basis by means of tracing geodynamic zones and elements of the geoblock structure, where the leading marker of seismogenic risk zones is the anomaly of spatial variability of the geofield, coinciding with the discordant intersection of localised land structures. Verification of this marker is achieved by displaying a cartographic distribution image within the range of the seismic point increment, detailed on the basis of approximation dependencies.

How to cite: Movchan I.B., Yakovleva A.A. Refined assessment of seismic microzonation with a priori data optimisation // Journal of Mining Institute. 2019. Vol. 236 . p. 133-141. DOI: 10.31897/PMI.2019.2.133
Geoeconomics and Management
  • Date submitted
    2017-11-08
  • Date accepted
    2018-01-20
  • Date published
    2018-04-24

Major trends in efficiency upgrading of the economic activity in the Arctic zone of Russian Federation

Article preview

Organization of efficient economic activity in the Arctic zone requires development of human potential, transport infrastructure, exploitation of natural resources under the conditions of greatest possible environmental safety. In order to choose preferable trends of economic development and to provide efficiency of operations in the Arctic zone it is crucial to perform research in the areas of industrial efficiency upgrading and rational use of fuel, energy, mineral, chemical and biological resources of the Ocean and littoral areas of Russian Arctic. The paper analyzes major trends in the research on increasing economic efficiency of operations aimed at territory development in the Arctic zone. The authors justify the need to examine economic problems of rational resource use in the Arctic zone of Russia based on the proposed system of resource-estimation indicators and their application in establishing a mechanism of rational resource use with a due regard to protection of the marine environment. The paper also focuses on methodological problems of the target programme approach to complex development of the Arctic zone, creation of target programmes, industrial development and rational use of natural resources. The authors give rationale for the key task in this area – development of methodological principles of forming federal and regional target programmes, aimed at exploration, exploitation and rational use of natural resources in the Arctic zone of Russian Federation. An analysis is provided that focuses on the problems of creating a scientifically justified hierarchical system of programmes and regional regulations, creation of a scientific information data bank and other methodological issues.

How to cite: Agarkov S.A., Kozlov A.V., Fedoseev S.V., Teslya A.B. Major trends in efficiency upgrading of the economic activity in the Arctic zone of Russian Federation // Journal of Mining Institute. 2018. Vol. 230 . p. 209-216. DOI: 10.25515/PMI.2018.2.209
Problems in conservation of resources? mine surveying and wise erth's interior utilization
  • Date submitted
    2009-07-24
  • Date accepted
    2009-09-14
  • Date published
    2010-04-22

Bulgarian coal industry in market economy

Article preview

Mining production in Bulgaria during the transitional period goes through four periods: 1990 – beginning of the period; 1995 – restructuring of mining production, formation of normative base; 2000 – end of transitional period; 2005-2008 – sustainable development of mining industry.

How to cite: Voutov T. Bulgarian coal industry in market economy // Journal of Mining Institute. 2010. Vol. 185 . p. 196-198.