Date submitted2023-08-02
-
Date accepted2023-12-27
-
Date published2024-04-25
Justification of the approaches to improve management strategy of the mining system based on the analysis of data on the mining of complex structural rock blocks
Long-term activity of mining enterprises causes the necessity to substantiate the strategies of management of the mining and technical system functioning in terms of improvement of ore quality control, which is determined by its change in the course of field development due to the priority development of the main reserves and, as a consequence, forced transition to the mining of complex structural rock blocks with a decrease in the recovery percentage, which is typical in case the ore component meets the requirements of the feasibility study in terms of grade at substandard capacity. In this case, it is possible to identify the recovery percentage and the potential for its increase by analyzing the long-term activity of the mining and industrial enterprise, namely, by analyzing the data of mining complex structural rock blocks with the subsequent establishment of the relationship between the primary data on mining and geological conditions and information on the quality of the mineral obtained from the technological equipment. Therefore, the purpose of the research was to substantiate the necessity of improving the management strategy of the mining-technical system functioning, which consists in the fact that on the basis of analyzing the mining data of complex structural rock blocks it is possible to determine the ore mass losses and their quantity and to lay the basis for the development of decisions on its extraction. For this purpose, the collected data on the mining of complex structural rock blocks, accounting the geological and industrial type of extracted ores, were considered in modeling the conditions and studying the parameters of technological processes, the implementation of which provides additional products. It was revealed that the ore mass from substandard thickness layers is delivered to the dumps, and ore mass losses have been estimated at 25-40 % per year. It is proved that determination of ore mass losses based on the analysis of data on mining of complex structural rock blocks, as well as timely solution of this issue can significantly increase the production efficiency of mining and technical system. Taking into account for the results obtained, the options for optimizing the production of the mining and engineering system were proposed.
-
Date submitted2021-01-21
-
Date accepted2023-09-20
-
Date published2023-12-25
Adaptation of transient well test results
Transient well tests are a tool for monitoring oil recovery processes. Research technologies implemented in pumping wells provide for a preliminary conversion of measured parameters to bottomhole pressure, which leads to errors in determining the filtration parameters. An adaptive interpretation of the results of well tests performed in pumping wells is proposed. Based on the original method of mathematical processing of a large volume of field data for the geological and geophysical conditions of developed pays in oil field, multidimensional models of well flow rates were constructed including the filtration parameters determined during the interpretation of tests. It is proposed to consider the maximum convergence of the flow rate calculated using a multidimensional model and the value obtained during well testing as a sign of reliability of the filtration parameter. It is proposed to use the analysis of the developed multidimensional models to assess the filtration conditions and determine the individual characteristics of oil flow to wells within the pays. For the Bashkirian-Serpukhovian and the Tournaisian-Famennian carbonate deposits, the influence of bottomhole pressure on the well flow rates has been established, which confirms the well-known assumption about possible deformations of carbonate reservoirs in the bottomhole areas and is a sign of physicality of the developed multidimensional models. The advantage of the proposed approach is a possibility of using it to adapt the results of any research technology and interpretation method.
-
Date submitted2022-04-07
-
Date accepted2023-04-21
-
Date published2023-08-28
Development of a new assessment system for the applicability of digital projects in the oil and gas sector
Digital transformation is one of the global trends that has covered most sectors of the economy and industry. For oil and gas companies, the introduction of digital technologies has become not just a trend, but one of the factors for ensuring competitiveness and maintaining a stable position in the market in a rapidly changing macro environment. At the same time, despite the positive effects achieved, digital transformation is a complex process from the point of view of implementation and is associated with high technological, financial, and economic risks. The work aims to develop and test a new system for evaluating the applicability of digital projects in the oil and gas sector. The research methodology includes the application of the Gartner curve, methods of expert assessments, and tools for assessing the economic efficiency of investment projects. The developed assessment system is based on a comprehensive accounting of four components: the level of digital maturity of the company; compliance of the implemented technology with the goals and objectives of the organization; the level of reliability of the implemented technology; the level of innovation of the implemented project. Particular attention is paid to the practical testing of the proposed methodology based on the evaluation of a digital project implemented by a Russian oil and gas company.
-
Date submitted2021-03-24
-
Date accepted2022-12-15
-
Date published2023-08-28
Composite model of seismic monitoring data analysis during mining operations on the example of the Kukisvumchorrskoye deposit of AO Apatit
Geomechanical monitoring of the rock mass state is an actively developing branch of geomechanics, in which it is impossible to distinguish a single methodology and approaches for solving problems, collecting and analyzing data when developing seismic monitoring systems. During mining operations, all natural factors are subject to changes. During the mining of a rock mass, changes in the state of structural inhomogeneities are most clearly manifested: the existing natural structural inhomogeneities are revealed; there are movements in discontinuous disturbances (faults); new man-made disturbances (cracks) are formed, which are accompanied by changes in the natural stress state of various blocks of the rock mass. The developed method for evaluating the results of monitoring geomechanical processes in the rock mass on the example of the United Kirovsk mine of the CF AO Apatit allowed to solve one of the main tasks of the geomonitoring system – to predict the location of zones of possible occurrence of dangerous manifestations of rock pressure.
-
Date submitted2020-06-02
-
Date accepted2021-05-21
-
Date published2021-09-20
Analysis of technological schemes for creating a geodetic control at the industrial site
The article highlights the issues of creating with the necessary accuracy a planned control on the industrial site of the engineering structures under construction using satellite technologies and total stations. Depending on the design features of the engineering structures under construction, as well as the technological scheme for the installation of building constructions and industrial equipment, various schemes for creating such control are considered, based on the application of the inverse linear-angular notch. Errors in the source data are one of the main errors that affect the accuracy of geodetic constructions, including the solution of the inverse linear-angular notch. When creating a geodetic network in several stages, the errors of the initial data of the first stage affect the values of the root-mean-square errors (RMS) of determining the position of the second stage points, the errors of which affect the value of the RMS of the position of the third stage points, etc. The reason for their occurrence is the errors of geodetic measurements that occur at each stage of control creating, as well as the stability violation of the points during the production of excavation, construction and installation works. When determining the coordinates of a separate project point at the stage of its removal in-situ by a total station, the entire network is not equalized in the vast majority of cases, and the coordinates of the starting points to which the total station is oriented are considered error-free. As a result, the RMS determination of the points coordinates of the control network or the removal of the design points of the elements of building structures and equipment will also be considered satisfying the requirements, i.e. the measurement accuracy will be artificially overestimated and will not correspond to the actual one obtained. This is due to the fact that the accumulation of errors in the initial data is not taken into account when the number of steps (stages) of control creating increases. The purpose of this work is to analyze the influence of measurement errors and initial data when creating a geodetic control on an industrial site by several stages of its construction based on inverse linear-angular notches and a priori estimation of the accuracy of the determined points position.
-
Date submitted2018-07-12
-
Date accepted2018-09-09
-
Date published2018-12-21
Application of the theory of wavelets for compression and filtration of geoinformation
- Authors:
- A. S. Yarmolenko
- O. V. Skobenko
The purpose of the article is to develop a detailed and accessible technology for the application of wavelets in the processing of geo-information, the subject of research is wavelet-based filtering and compression of geo-information. The research methodology is based on the modern theory of wavelets in the light of linear algebra. Research methods involve study and generalization, abstraction, formalization, mathematical modeling using computer programs compiled by the authors. After the introduction and formulation of the problem, the basic positions of linear algebra are presented, on which the content of the article is based when constructing orthonormal bases in one- and two-dimensional cases. First, the application of the general theory to the decomposition of the vector of initial data in the Haar and Shannon bases is given. Further, on the basis of the Haar basis, orthonormal bases of wavelet transforms and filtering information are constructed. The procedure for creating wavelet filters by a sequence of convolutions, the use of MSA analysis for constructing an orthonormal basis of the wavelet transform is considered. Implemented the practical possibility of wavelet filtering based on specific programs for modeling geo-information data fields and images, data compression and filtering. The result of the work is the methods of constructing orthonormal bases by various methods of wavelet transform, based on which algorithms and corresponding computer programs for geoinformation compression are compiled using the example of terrain and photographic images. The efficiency of geoinformation compression and noise filtering using wavelets was investigated. A method has been developed for determining the value of a filter depending on the accuracy of the initial geo-information, illustrated by the example of calculating the filter value for compressing information about the heights of the terrain. The same technique is recommended for image filtering.
-
Date submitted2018-01-06
-
Date accepted2018-02-26
-
Date published2018-06-22
Extraction of platinum metals during procssing of chromium ores from dunnite deposits
- Authors:
- G. V. Petrov
- Ya. M. Shneerson
- Yu. V. Andreev
Currently, the main raw materials sources of platinum group metals in Russia are complex sulfide copper-nickel ores of the Taimyr region and placer deposits. However, in view of the inevitable loss of platinum metals during the metallurgical processing of initial ores and the deterioration of the quality of ore raw materials, along with a decrease in the share of platinum mining from placers, there is a need to look for new non-traditional sources of platinum group metals. Dunnites of the Middle Urals are promising platinum-bearing raw materials. The use of the gravitational-magnetic processing of chromium ores of dunnite deposits makes it possible to identify a magnetic platinum-bearing concentrate with a high content of magnetite and platinum-iron alloys, they can be refined using chemical-metallurgical methods. This article presents the results of research of identifying peculiarities of technological behavior of chromium, iron and noble metals during mechanical processing of ledge chromium ore. The kinetic regularities of the sulfuric acid decomposition of magnetite are determined. Optimum technological parameters of sulfuric acid leaching of iron from magnetic products of chromium ore dressing are established. Based on the conducted studies, the PDF and PID for the complex processing of chromium ores of dunnite deposits is proposed, which ensures the production of a rich platinum-bearing concentrate and a high-quality chromite concentrate that meets the requirements of chemical production.
-
Date submitted2015-08-17
-
Date accepted2015-10-18
-
Date published2016-04-22
Platinum specialization of supergene nickel deposits on ultramafic massifs of the Urals
- Authors:
- I. V. Talovina
This paper presents an analysis of geochemical data obtained as a result of persistent research of the Buruktal, Ufalei, Elov and others supergene nickel deposits of the Urals on the content of precious metals. Content and distribution of platinum group elements, gold and silver in oxide–silicate nickel ores are compared with their content in initial dunite-harzburgite bedrock. It was revealed that all the PGE accumulate in supergene nickel deposits. Geochemical specialization of PGE mineralization of supergene nickel deposits is determined by palladium and platinum, while in dunite-harzburgite substrate of primary ophiolitic massifs major platinoids are ruthenium, osmium and iridium. Pt/Pd ratio is generally less than 1, i.e. palladium is dominating in them with some exceptions.
-
Date submitted2010-07-13
-
Date accepted2010-09-16
-
Date published2011-03-21
Database development real estate rural municipalities
- Authors:
- V. G. Gorelikov
- E. Yu. Ionova
For rural settlements in Russia today is characterized by poor living conditions, their ac- complishment should be engaged in local government. However, the system of land registration at the municipality does not perform all assigned to municipal functions. We develop a system of indicators of land records, which is implemented using MS Access.
-
Date submitted2009-10-20
-
Date accepted2009-12-11
-
Date published2010-09-22
Monitoring of deformation processes of the earth surface with methods of differential interferometric treatment of radar data
- Authors:
- A. A. Krivenko
- Yu. A. Kashnikov
The Differential Interferometry SAR (DInSAR) has recently become one of the most popular methods to reveal and analyze the subsidence of the ground. This method is considered by researchers to be well suited to solve a problem of small relative ground shifts survey applying the short (centimeter) radio waves.
-
Date submitted2008-10-29
-
Date accepted2008-12-06
-
Date published2009-12-11
Data collection and processing system of low-frequency electrical method with artificial source
- Authors:
- A. I. Geraskin
Review of the basic components of elaborating system is presented. The basic trends of application of these components and software products created on their basis are shown. The concept of a processing graph is entered and shown its dynamic features. Specific examples of the successful practical application of the system are considered.
-
Date submitted2008-10-07
-
Date accepted2008-12-05
-
Date published2009-12-11
The application of areal technology and 3d data interpretation tem sounding when constructing the volume geoelectrical model of compound medium
Analysis of possibilities of different electrical technologies is carried out. Problems of applications of one-dimension and multidimensional inversions in the process of interpretation are discussed. Example of practical application of two- and three-dimension interpretation of electrical data in the process of ore prospecting in complicated geological media is presented. The example illustrates possibilities of electrical method as original research method, which enables to develop three-dimensional models of the medium under investigation.