-
Date submitted2024-03-18
-
Date accepted2024-11-07
-
Date published2025-01-14
Public-private partnership in the mineral resources sector of Russia: how to implement the classical model?
A comparative financial and economic analysis is conducted of different public-private partnership (PPP) models for industrial infrastructure construction projects in an underdeveloped resource-rich region. The Stackelberg game theory-based model is used to build a parametrized family of bilevel mathematical programming models that describe an entire spectrum of partnership schemes. This approach enables a comparison of different strategies for the distribution of infrastructure investments between the government and the subsoil user and hence a scenario of transformation of Russia’s current PPP scheme into the classical partnership model, which is practiced in developed economies. To this end, a database is created on fifty polymetallic deposits in Transbaikalia, and a comparative analysis is conducted of Stackelberg-equilibrium development programs that implement different PPP models. The numerical experiment results show the classical PPP model to be most effective in the case of a budget deficit. The analysis helps assess the economic consequences of a gradual transformation of the partnership institution in industrial infrastructure construction from investor support in the Russian model to government support in the classical scheme. Intermediate partnership models, which act as a transitional institution, help reduce the budget burden. These models can be implemented by clustering the deposits, developing subsoil user consortia, and practicing shared construction of necessary transport and energy infrastructure. The intensification of horizontal connections between subsoil users creates favorable conditions for additional effects from the consolidation of resources and can serve as a foundation for a practical partnership scheme within the framework of the classical model.
-
Date submitted2024-04-08
-
Date accepted2024-06-13
-
Date published2024-12-25
Analysing the problems of reproducing the mineral resource base of scarce strategic minerals
The results of studying the scarcity of strategic minerals in the Russian Federation are presented, domestic consumption of which is largely provided by forced imports and/or stored reserves. Relevance of the work is due to aggravation of the geopolitical situation and a growing necessity to meet the demand of national economy for raw materials from own sources. Analysis of the state of mineral resource base of scarce minerals in the Russian Federation was accomplished, problems were identified and prospects for its development were outlined taking into account the domestic demand for scarce minerals, their application areas and the main consumers. Reducing the deficit through the import of foreign raw materials and the development of foreign deposits does not ensure the reproduction of the domestic mineral resource base, independence of the country from imported raw materials as well as additional competitive advantages, economic stability and security. It was ascertained that a major factor holding back the development of the mineral resource base is insufficient implementation of new technological solutions for the use of low-quality ore. Improving the technologies in the industry is relevant for all types of scarce minerals to solve the problem of reproducing their resource base. Taking into account the prospects for the development of the resource base for the minerals under consideration (manganese, uranium, chromium, fluorspar, zirconium, titanium, graphite) requires a set of legal and economic measures aimed at increasing the investment attractiveness of geological exploration for subsoil users at their own expense without attracting public funding. The proposed measures, taking into account the analysis of positive experience of foreign countries, include the development of junior businesses with expansion of the “declarative” principle, the venture capital market, various tax incentives, preferential loans as well as conditions for the development of infrastructure in remote regions. The proposed solution to the problem of scarcity of strategic minerals will make it possible in future to present measures to eliminate the scarcity of certain types of strategic minerals taking into account their specificity.
-
Date submitted2023-08-02
-
Date accepted2023-12-27
-
Date published2024-04-25
Justification of the approaches to improve management strategy of the mining system based on the analysis of data on the mining of complex structural rock blocks
Long-term activity of mining enterprises causes the necessity to substantiate the strategies of management of the mining and technical system functioning in terms of improvement of ore quality control, which is determined by its change in the course of field development due to the priority development of the main reserves and, as a consequence, forced transition to the mining of complex structural rock blocks with a decrease in the recovery percentage, which is typical in case the ore component meets the requirements of the feasibility study in terms of grade at substandard capacity. In this case, it is possible to identify the recovery percentage and the potential for its increase by analyzing the long-term activity of the mining and industrial enterprise, namely, by analyzing the data of mining complex structural rock blocks with the subsequent establishment of the relationship between the primary data on mining and geological conditions and information on the quality of the mineral obtained from the technological equipment. Therefore, the purpose of the research was to substantiate the necessity of improving the management strategy of the mining-technical system functioning, which consists in the fact that on the basis of analyzing the mining data of complex structural rock blocks it is possible to determine the ore mass losses and their quantity and to lay the basis for the development of decisions on its extraction. For this purpose, the collected data on the mining of complex structural rock blocks, accounting the geological and industrial type of extracted ores, were considered in modeling the conditions and studying the parameters of technological processes, the implementation of which provides additional products. It was revealed that the ore mass from substandard thickness layers is delivered to the dumps, and ore mass losses have been estimated at 25-40 % per year. It is proved that determination of ore mass losses based on the analysis of data on mining of complex structural rock blocks, as well as timely solution of this issue can significantly increase the production efficiency of mining and technical system. Taking into account for the results obtained, the options for optimizing the production of the mining and engineering system were proposed.
-
Date submitted2021-01-21
-
Date accepted2023-09-20
-
Date published2023-12-25
Adaptation of transient well test results
Transient well tests are a tool for monitoring oil recovery processes. Research technologies implemented in pumping wells provide for a preliminary conversion of measured parameters to bottomhole pressure, which leads to errors in determining the filtration parameters. An adaptive interpretation of the results of well tests performed in pumping wells is proposed. Based on the original method of mathematical processing of a large volume of field data for the geological and geophysical conditions of developed pays in oil field, multidimensional models of well flow rates were constructed including the filtration parameters determined during the interpretation of tests. It is proposed to consider the maximum convergence of the flow rate calculated using a multidimensional model and the value obtained during well testing as a sign of reliability of the filtration parameter. It is proposed to use the analysis of the developed multidimensional models to assess the filtration conditions and determine the individual characteristics of oil flow to wells within the pays. For the Bashkirian-Serpukhovian and the Tournaisian-Famennian carbonate deposits, the influence of bottomhole pressure on the well flow rates has been established, which confirms the well-known assumption about possible deformations of carbonate reservoirs in the bottomhole areas and is a sign of physicality of the developed multidimensional models. The advantage of the proposed approach is a possibility of using it to adapt the results of any research technology and interpretation method.
-
Date submitted2021-03-24
-
Date accepted2022-12-15
-
Date published2023-08-28
Composite model of seismic monitoring data analysis during mining operations on the example of the Kukisvumchorrskoye deposit of AO Apatit
Geomechanical monitoring of the rock mass state is an actively developing branch of geomechanics, in which it is impossible to distinguish a single methodology and approaches for solving problems, collecting and analyzing data when developing seismic monitoring systems. During mining operations, all natural factors are subject to changes. During the mining of a rock mass, changes in the state of structural inhomogeneities are most clearly manifested: the existing natural structural inhomogeneities are revealed; there are movements in discontinuous disturbances (faults); new man-made disturbances (cracks) are formed, which are accompanied by changes in the natural stress state of various blocks of the rock mass. The developed method for evaluating the results of monitoring geomechanical processes in the rock mass on the example of the United Kirovsk mine of the CF AO Apatit allowed to solve one of the main tasks of the geomonitoring system – to predict the location of zones of possible occurrence of dangerous manifestations of rock pressure.
-
Date submitted2020-06-02
-
Date accepted2021-05-21
-
Date published2021-09-20
Analysis of technological schemes for creating a geodetic control at the industrial site
The article highlights the issues of creating with the necessary accuracy a planned control on the industrial site of the engineering structures under construction using satellite technologies and total stations. Depending on the design features of the engineering structures under construction, as well as the technological scheme for the installation of building constructions and industrial equipment, various schemes for creating such control are considered, based on the application of the inverse linear-angular notch. Errors in the source data are one of the main errors that affect the accuracy of geodetic constructions, including the solution of the inverse linear-angular notch. When creating a geodetic network in several stages, the errors of the initial data of the first stage affect the values of the root-mean-square errors (RMS) of determining the position of the second stage points, the errors of which affect the value of the RMS of the position of the third stage points, etc. The reason for their occurrence is the errors of geodetic measurements that occur at each stage of control creating, as well as the stability violation of the points during the production of excavation, construction and installation works. When determining the coordinates of a separate project point at the stage of its removal in-situ by a total station, the entire network is not equalized in the vast majority of cases, and the coordinates of the starting points to which the total station is oriented are considered error-free. As a result, the RMS determination of the points coordinates of the control network or the removal of the design points of the elements of building structures and equipment will also be considered satisfying the requirements, i.e. the measurement accuracy will be artificially overestimated and will not correspond to the actual one obtained. This is due to the fact that the accumulation of errors in the initial data is not taken into account when the number of steps (stages) of control creating increases. The purpose of this work is to analyze the influence of measurement errors and initial data when creating a geodetic control on an industrial site by several stages of its construction based on inverse linear-angular notches and a priori estimation of the accuracy of the determined points position.
-
Date submitted2018-07-12
-
Date accepted2018-09-09
-
Date published2018-12-21
Application of the theory of wavelets for compression and filtration of geoinformation
- Authors:
- A. S. Yarmolenko
- O. V. Skobenko
The purpose of the article is to develop a detailed and accessible technology for the application of wavelets in the processing of geo-information, the subject of research is wavelet-based filtering and compression of geo-information. The research methodology is based on the modern theory of wavelets in the light of linear algebra. Research methods involve study and generalization, abstraction, formalization, mathematical modeling using computer programs compiled by the authors. After the introduction and formulation of the problem, the basic positions of linear algebra are presented, on which the content of the article is based when constructing orthonormal bases in one- and two-dimensional cases. First, the application of the general theory to the decomposition of the vector of initial data in the Haar and Shannon bases is given. Further, on the basis of the Haar basis, orthonormal bases of wavelet transforms and filtering information are constructed. The procedure for creating wavelet filters by a sequence of convolutions, the use of MSA analysis for constructing an orthonormal basis of the wavelet transform is considered. Implemented the practical possibility of wavelet filtering based on specific programs for modeling geo-information data fields and images, data compression and filtering. The result of the work is the methods of constructing orthonormal bases by various methods of wavelet transform, based on which algorithms and corresponding computer programs for geoinformation compression are compiled using the example of terrain and photographic images. The efficiency of geoinformation compression and noise filtering using wavelets was investigated. A method has been developed for determining the value of a filter depending on the accuracy of the initial geo-information, illustrated by the example of calculating the filter value for compressing information about the heights of the terrain. The same technique is recommended for image filtering.
-
Date submitted2016-11-20
-
Date accepted2017-01-07
-
Date published2017-04-14
Models for assessment of public-private partnership projects in subsurface management
- Authors:
- I. S. Kalgina
Aims and goals of this paper. The article is devoted to analysis of issues related to development of public-private partnership (PPP) projects in mineral resources sector of Russia. The special emphasis is given to the most common PPP model in the field of industrial infrastructure construction using the Investment Fund of RF. We offer specific tools to be used with Russian models for assessment of PPP projects and forecasting of its efficiency for its participants. This model allows evaluating the results of the whole deposit development process, constructing graphs of all types of expenditures and revenues (by years), and having rent assessment of deposit NPV (net present value) and internal rent rate (IRR). Methods and results. The iteration process at each step enables assessment of budget revenue forecast, living standards indexes, ecological parameters and performance indicators, as well as a certain variant of PPP project implementation for investors (direct government expenses on implementation of infrastructure objects and environmental activities, tax benefits). We have a set of tools for supporting the management decision making process in developing efficient PPP mechanism, balancing long-term government interests, private sector and local people interests arising during socio-economic development of mineral resources area. This method using the suggested tools for analyzing efficiency of a specific partnership mechanism is shown on the examples of projects of developing different deposits in Transbaikal region.
-
Date submitted2010-07-13
-
Date accepted2010-09-16
-
Date published2011-03-21
Database development real estate rural municipalities
- Authors:
- V. G. Gorelikov
- E. Yu. Ionova
For rural settlements in Russia today is characterized by poor living conditions, their ac- complishment should be engaged in local government. However, the system of land registration at the municipality does not perform all assigned to municipal functions. We develop a system of indicators of land records, which is implemented using MS Access.
-
Date submitted2009-10-29
-
Date accepted2009-12-09
-
Date published2010-09-22
Problems and ways of exploration of the raw material resources base of the Zapoliarny branch of the Norilsk Nickel CO
Consideration is given to the geological, mining and operating conditions of the Norilsk industrial district. The analysis is made of the present-day state of mining production of the Zapoliarny branch of the Norilsk Nickel Co. The principal trends in the safe and efficient exploration of the raw material resources base have been stated within the Norilsk industrial district .
-
Date submitted2009-10-20
-
Date accepted2009-12-11
-
Date published2010-09-22
Monitoring of deformation processes of the earth surface with methods of differential interferometric treatment of radar data
- Authors:
- A. A. Krivenko
- Yu. A. Kashnikov
The Differential Interferometry SAR (DInSAR) has recently become one of the most popular methods to reveal and analyze the subsidence of the ground. This method is considered by researchers to be well suited to solve a problem of small relative ground shifts survey applying the short (centimeter) radio waves.
-
Date submitted2008-11-11
-
Date accepted2009-01-08
-
Date published2009-12-11
Development of an economic-organizing mechanism of mineral resourсe base renewal in Russia's oil industry
- Authors:
- N. V. Pashkevich
- L. A. Nikolaychuk
In paper there has been developed an economic-organizing mechanism of mineral resource base renewal of Russia's oil industry using financial and tax instruments and licensing system of soil use. The proposed mechanism is targeted on perfecting of soil use managing system, attracting investments into geological exploration branch, stimulating innovation constituent in exploration and extraction of oil, rational use of mineral resource base in oil industry.
-
Date submitted2008-10-29
-
Date accepted2008-12-06
-
Date published2009-12-11
Data collection and processing system of low-frequency electrical method with artificial source
- Authors:
- A. I. Geraskin
Review of the basic components of elaborating system is presented. The basic trends of application of these components and software products created on their basis are shown. The concept of a processing graph is entered and shown its dynamic features. Specific examples of the successful practical application of the system are considered.
-
Date submitted2008-10-07
-
Date accepted2008-12-05
-
Date published2009-12-11
The application of areal technology and 3d data interpretation tem sounding when constructing the volume geoelectrical model of compound medium
Analysis of possibilities of different electrical technologies is carried out. Problems of applications of one-dimension and multidimensional inversions in the process of interpretation are discussed. Example of practical application of two- and three-dimension interpretation of electrical data in the process of ore prospecting in complicated geological media is presented. The example illustrates possibilities of electrical method as original research method, which enables to develop three-dimensional models of the medium under investigation.