Submit an Article
Become a reviewer
Vol 174
Pages:
167-170
Download volume:
RUS
Article

Application of risk assessment concept in Estonian mining industry

Authors:
Sergei Sabanov1
Jyri-Rivaldo Pastarus2
Oleg Nikitin3
About authors
  • 1 — Tallinn University of Technology
  • 2 — Tallinn University of Technology
  • 3 — AS Eesti Põlevkivi
Date submitted:
2007-07-10
Date accepted:
2007-09-20
Date published:
2008-03-17

Abstract

The paper deals with the problems of risk assessment in Estonian oil shale mines, where room-and-pillar mining with blasting is applied. This paper examines the risks associated with the application of a new room-and-pillar mining technology using modern machines at the Estonia mine. The new mining technology is based on the transition from packet blasting to emulsion blasting, from 2.0 m boreholes to 4.0 m boreholes (ATLAS Copco machine) and on a new undercutting method (SMAG machine). With this equipment with the new technique, the advancement speed at the entrance reached 4 m. As a result of this increase in advancement speed, situations with unsupported room lengths of up to 5.5 m can be expected with a decrease in the stability of the immediate roof. Various factors relevant for Estonian oil shale mines have been identified. The study showed that the probability and consequences of the risk are acceptable. The used concept of the risk assessment method is applicable to Estonian oil shale mines. It can be used for different purposes and levels. The results of the risk assessment are of particular interest for practical purposes.

Область исследования:
(Archived) Economics and management
Funding:

None

Go to volume 174

Similar articles

Study of possibilities of geophysical methods in connection with geological modeling of hydrocarbon deposits
2008 B. V. Belozerov
Removing cuttings from deviated and horizontal wells
2008 Sandoiu Gheorghe-Florin
Technology of fabrication in relation to microstructure of Ni-Ti shape memory alloys
2008 I. Szurman, M. Kursa
Fluid flow into the well in the conditions of zonally inhomogeneous formation
2008 D. A. Shakirov
Development of technology for construction of sidetracks with horizontal sections under the condition of preservation of the old wellbore and existing production from it. Justification of economic feasibility of drilling of sidetracks with horizontal sect
2008 S. V. Gavrilov
Energy saving compensated asynchronous motors and electric drives on their basis
2008 A. R. Mugalimova