Slope stabilisation method on S7 «Zakopianka» road case

Authors:
Michal Godzinski1
Paluch Lukasz2
About authors
  • 1 — AGH University of Science and Technology
  • 2 — AGH University of Science and Technology
Date submitted:
2007-07-27
Date accepted:
2007-09-07
Date published:
2008-03-17

Abstract

Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.

Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:

None

Go to volume 174

Similar articles

Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov
Filtering hydrocyclone for drilling mud cleaning with filter sounding by running transverse ultrasonic waves
2008 L. V. Vukadinovich
Hydrified tunneling complex for hard rocks
2008 M. V. Kucherenko, A. A. Kucherenko
Biodegradation of PAHs, PCBs and PHC in sediments from the manmade water course of Černý příkop in the municipal territory of the Ostrava city (Czech republic)
2008 Gabriela Lyčková, Radmila Kučerová, Peter Fečko, Iva Pečtová
Experimental researches for the reduction of the noxes during the burning of pit coal from Jiu Valley – Romania
2008 Ciolea Daniela Ionela
Assessment of financial stability of LLC Peterburgteploenergo
2008 I. I. Kashtanova