Slope stabilisation method on S7 «Zakopianka» road case
About authors
- 1 — AGH University of Science and Technology
- 2 — AGH University of Science and Technology
Abstract
Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
Similar articles
Investigations of character of manifestation of mountain pressure in various mining-geological conditions
2008 A. V. Rogachkov
Estimation of stability of the cavern for gas storage taking into account salt rheology
2008 D. V. Shustov
Role and value of business reputation in the assets of the company
2008 A. A. Sarafanova, E. V. Khit
Reduction of greenhouse gas emissions in the district heating system of Vyborg
2008 Värri Hanna, Kaikko Juha, Horttanainen Mika, Linnanen Lassi