Slope stabilisation method on S7 «Zakopianka» road case
About authors
- 1 — AGH University of Science and Technology
- 2 — AGH University of Science and Technology
Abstract
Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Similar articles
Large scale investments in Russia’s infrastructure and natural resources sector
2008 Thomas Schumann
Prevention of corrosion and salt deposition by inhibiting foam systems in wells of North-West Bashkortostan fields
2008 B. R. Gilmutdinov
Investigation of the possibilities of water-gas influence on the reservoir using pump-ejector units
2008 D. I. Popov
Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov