Slope stabilisation method on S7 «Zakopianka» road case
About authors
- 1 — AGH University of Science and Technology
- 2 — AGH University of Science and Technology
Abstract
Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Similar articles
Use of long-lived solidifying foams for protection of working spaces from dust and gas explosions
2008 Yu. D. Smirnov
Role and value of business reputation in the assets of the company
2008 A. A. Sarafanova, E. V. Khit
Modeling the solution gas drive process in heavy oils
2008 Mehdi Chraïbi, Stéphane Zaleski, Fabienne Franco