Slope stabilisation method on S7 «Zakopianka» road case
About authors
- 1 — AGH University of Science and Technology
- 2 — AGH University of Science and Technology
Abstract
Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
Similar articles
Justification of steam-thermal horizontal well location in bitumen reservoir on the basis of complex generalization of geological-geophysical, field and laboratory data on the example of Mordovo-Karmalskoye field
2008 D. A. Dautov
Filtering hydrocyclone for drilling mud cleaning with filter sounding by running transverse ultrasonic waves
2008 L. V. Vukadinovich
Biodegradation of PAHs, PCBs and PHC in sediments from the manmade water course of Černý příkop in the municipal territory of the Ostrava city (Czech republic)
2008 Gabriela Lyčková, Radmila Kučerová, Peter Fečko, Iva Pečtová