Slope stabilisation method on S7 «Zakopianka» road case
About authors
- 1 — AGH University of Science and Technology
- 2 — AGH University of Science and Technology
Abstract
Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:
None
Similar articles
Experimental evaluation of the influence of pulse electromagnetic treatment of ferruginous quartzites for the purpose of their de-strengthening before grinding
2008 E. A. Fedotov
Waterproofing compound for limiting water inflow into producing oil wells
2008 I. N. Diyarov, N. Yu. Bashkirtseva, R. R. Agliullin
Use of long-lived solidifying foams for protection of working spaces from dust and gas explosions
2008 Yu. D. Smirnov
Development of technology for construction of sidetracks with horizontal sections under the condition of preservation of the old wellbore and existing production from it. Justification of economic feasibility of drilling of sidetracks with horizontal sect
2008 S. V. Gavrilov