Slope stabilisation method on S7 «Zakopianka» road case

Authors:
Michal Godzinski1
Paluch Lukasz2
About authors
  • 1 — AGH University of Science and Technology
  • 2 — AGH University of Science and Technology
Date submitted:
2007-07-27
Date accepted:
2007-09-07
Date published:
2008-03-17

Abstract

Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.

Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:

None

Go to volume 174

Similar articles

Hydrified tunneling complex for hard rocks
2008 M. V. Kucherenko, A. A. Kucherenko
Application of risk assessment concept in Estonian mining industry
2008 Sergei Sabanov, Jyri-Rivaldo Pastarus, Oleg Nikitin
Features of engineering-geological surveys in areas of eluvial soil development (on the example of Nizhnekamsk)
2008 I. I. Nugmanov
Geometrization of deposits with commercial hydrocarbon content in volcanogenic formations of triassic age based on the complex of geological and geophysical data
2008 E. V. Efimova
Assessment of financial stability of LLC Peterburgteploenergo
2008 I. I. Kashtanova
Analysis of ecological situation in the zone of influence of the large cement plant and technical solution for its improvement
2008 N. N. Safarova, Yu. P. Sorokin