Slope stabilisation method on S7 «Zakopianka» road case
About authors
- 1 — AGH University of Science and Technology
- 2 — AGH University of Science and Technology
Abstract
Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Similar articles
Development and application of 3D-model of the territory for making optimal management decisions
2008 I. V. Ilinykh
Technological solutions and substantiation of geomechanical parameters of open-underground method of coal deposits development
2008 V. V. Senkus
Geometrization of deposits with commercial hydrocarbon content in volcanogenic formations of triassic age based on the complex of geological and geophysical data
2008 E. V. Efimova