Submit an Article
Become a reviewer
Michal Godzinski
Michal Godzinski
AGH University of Science and Technology
AGH University of Science and Technology

Co-authors

Articles

Geodesy, geomechanics and underground construction
  • Date submitted
    2007-07-27
  • Date accepted
    2007-09-07
  • Date published
    2008-01-01

Slope stabilisation method on S7 «Zakopianka» road case

Article preview

Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.

How to cite: Godzinski M., Lukasz P. Slope stabilisation method on S7 «Zakopianka» road case // Journal of Mining Institute. 2008. Vol. 174. p. 98-100.