Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.
Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Similar articles
Geometrization of deposits with commercial hydrocarbon content in volcanogenic formations of triassic age based on the complex of geological and geophysical data
2008 E. V. Efimova
Experimental evaluation of the influence of pulse electromagnetic treatment of ferruginous quartzites for the purpose of their de-strengthening before grinding
2008 E. A. Fedotov
Determination of accuracy of a combined system of tachymeter and echo-sounder and suggestions of improvement
2008 Britta Lickfett, Friedrich Partmann