Abstract

Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.

Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:

None

Go to volume 174

Similar articles

Research of dependence of viscosity of electrolyte viscosity of electrolyte of copper refining production on its composition and temperature
2008 I. S. Kuzmina
Extraction of noble metals from slags of metallurgical production
2008 K. E. Ananenko
Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes
2008 M. P. Bukasa
Hydrogeochemical conditions of the eastern slope of the Polar Urals
2008 N. V. Guseva
Biodegradation of PAHs, PCBs and PHC in sediments from the manmade water course of Černý příkop in the municipal territory of the Ostrava city (Czech republic)
2008 Gabriela Lyčková, Radmila Kučerová, Peter Fečko, Iva Pečtová
Development and application of 3D-model of the territory for making optimal management decisions
2008 I. V. Ilinykh