Slope stabilisation method on S7 «Zakopianka» road case

Authors:
Michal Godzinski1
Paluch Lukasz2
About authors
  • 1 — AGH University of Science and Technology
  • 2 — AGH University of Science and Technology
Date submitted:
2007-07-27
Date accepted:
2007-09-07
Date published:
2008-03-17

Abstract

Modernization of the Zakopianka Road is probably the most expected investment in Southern Poland. Some problems occurred during the construction stage connected with protection of slopes from failure at the pre-planned highway location. This problem resulted from a relatively small amount of investment and lack of soil stabilization plans in the original construction design. Various slope reinforcing methods for the Myślenice – Pcim highway section are presented in the paper. The results of calculations with Finite Difference Method (FDM) and Limit Equilibrium Method (LEM) are presented as well.

Область исследования:
(Archived) Geodesy, geomechanics and underground construction
Funding:

None

Go to volume 174

Similar articles

Application of the system of recovery of light fractions of hydrocarbons at loading into railway tank cars
2008 O. V. Kozachok
Research of properties of building materials modified by hydrophobic additives on the basis of peat
2008 E. Yu. Isaeva
Determination of hafnium in zirconium compounds using flame atomic absorption spectrometry (FAAS)
2008 Agata Jakóbik – Kolon, Marek Smolik, Ewa Miodek
Reduction of greenhouse gas emissions in the district heating system of Vyborg
2008 Värri Hanna, Kaikko Juha, Horttanainen Mika, Linnanen Lassi
Analytical method of determining the overburden exploitation factor by means of the graph of its minimum current volumes
2008 M. P. Bukasa
Technology of fabrication in relation to microstructure of Ni-Ti shape memory alloys
2008 I. Szurman, M. Kursa