Submit an Article
Become a reviewer

Search articles for by keywords:
поставка оборудования

Modern Trends in Hydrocarbon Resources Development
  • Date submitted
    2022-06-09
  • Date accepted
    2022-11-17
  • Date published
    2022-12-29

Drilling of deep and ultra-deep wells for prospecting and exploration of new raw mineral fields

Article preview

Scientific and technological progress over the last century has led to an enormous increase in the consumption of minerals, including energy resources. Most of the exploited oil and gas fields are already considerably depleted, so it is necessary to search for new hydrocarbon resources, particularly at great depths. Deep drilling plays a special role in solving this problem. The article considers the world and Russian experience of ultra-deep wells drilling. The methods and technologies used in the construction of wells, as well as complications and accidents occurring during their drilling were analyzed. The analysis revealed that the existing limitations for drilling parameters of deep and ultra-deep wells are caused by the technical characteristics of surface and bottomhole drilling equipment, which do not meet the extreme drilling conditions. The directions for development of deep and ultra-deep well drilling machinery and technologies are suggested. The notion of extreme rock and geological drilling conditions is introduced, which describes drilling in conditions of hydrostatic pressure of flushing fluid column and high bottomhole temperature both at stable and unstable wellbore conditions, coming close to the upper limit of operating technical characteristics of bottomhole assembly, the drill string and flushing fluid.

How to cite: Dvoynikov M.V., Sidorkin D.I., Yurtaev S.L., Grokhotov E.I., Ulyanov D.S. Drilling of deep and ultra-deep wells for prospecting and exploration of new raw mineral fields // Journal of Mining Institute. 2022. Vol. 258 . p. 945-955. DOI: 10.31897/PMI.2022.55
Geotechnical Engineering and Engineering Geology
  • Date submitted
    2021-02-20
  • Date accepted
    2021-10-18
  • Date published
    2021-12-16

Thermal protection implementation of the contact overheadline based on bay controllers of electric transport traction substations in the mining industry

Article preview

The article presents the principle of thermal protection of the contact overheadlineand substantiates the possibility of practical implementation of this principle for rail electric transport in the mining industry. The algorithm for the implementation of modern digital protection of the contact overhead line as one of the functions of the controller is described. A mathematical model of thermal protection is proposed, which follows from the solution of the heat balance equation. The model takes into account the coefficient of the electrical networktopology, as well as the coefficient of consumption of the current-carrying core of the cable, which determines the reduction in the conducting section from contact erosion and the growth of oxide films. Corrections for air flows are introduced when receiving data from an external anemometer, via telemechanics protocol. The mathematical model was tested by writing a real thermal protection program in the C programming language for the bay controller, based on the circuitry of which is the STM32F407IGT6 microcontroller for the microcontroller unit. Verification tests were carried out on a serial bay controller in 2020. The graphs for comparing the calculated and actual values of temperatures, with different flow rates of the current-carrying conductor of the DC cable, are given. To obtain data, telemechanics protocols IEC 60870-104 and Modbus TCP, PLC Segnetics SMH4 were used.

How to cite: Lantsev D.Y., Frolov V.Y., Zverev S.G., Uhrlandt D., Valenta J. Thermal protection implementation of the contact overheadline based on bay controllers of electric transport traction substations in the mining industry // Journal of Mining Institute. 2021. Vol. 251 . p. 738-744. DOI: 10.31897/PMI.2021.5.13
Mining
  • Date submitted
    2021-01-18
  • Date accepted
    2021-05-21
  • Date published
    2021-09-20

Improving the efficiency of the technology and organization of the longwall face move during the intensive flat-lying coal seams mining at the Kuzbass mines

Article preview

The reasons for the lag of the indicators of the leading Russian coal mines engaged in the longwall mining of the flat-lying coal seams from similar foreign mines are considered. The analysis of the efficiency of the longwall face move operations at the JSC SUEK-Kuzbass mines was carried out. A significant excess of the planned deadlines for the longwall face move during the thick flat-lying seams mining, the reasons for the low efficiency of disassembling operations and the main directions for improving the technology of disassembling operations are revealed. The directions of ensuring the operational condition of the recovery room formed by the longwall face are considered. The recommended scheme of converged coal seams mining and a three-dimensional model of a rock mass to justify its parameters are presented. Numerical studies using the finite element method are performed. The results of modeling the stress-strain state of a rock mass in the vicinity of a recovery room formed under conditions of increased stresses from the boundary part of a previously mined overlying seam are shown. The main factors determining the possibility of ensuring the operational condition of the recovery rooms are established. It is shown that it is necessary to take into account the influence of the increased stresses zone when choosing timbering standards and organizing disassembling operations at a interbed thickness of 60 m or less. A sufficient distance from the gob of above- or undermined seams was determined to ensure the operational condition of the recovery room of 50 m, for the set-up room – 30 m. Recommendations are given for improving technology and organization of the longwall face move operations at the mines applied longwall mining of flat-lying coal seams with the formation of a recovery room by the longwall face.

How to cite: Meshkov А.A., Kazanin O.I., Sidorenko A.A. Improving the efficiency of the technology and organization of the longwall face move during the intensive flat-lying coal seams mining at the Kuzbass mines // Journal of Mining Institute. 2021. Vol. 249 . p. 342-350. DOI: 10.31897/PMI.2021.3.3
Mining
  • Date submitted
    2009-08-18
  • Date accepted
    2009-10-10
  • Date published
    2010-02-01

Increase of efficiency performance of complexes open-cut equipment

Article preview

At definition of benches height many features and factors are taken into consideration: conditions of burial and property of taken out rocks; necessary intensity of mining work; the planned schedule of strippings; demanded quality given out, from mineral opencast; parametres of drilling-and-blastings; working conditions of excavators and a condition of transportation of ore. The basic condition of correctly chosen bench height is its stability in the course of operation the opencast mine providing safety of conducting of mining operations.

How to cite: Faul A.A. Increase of efficiency performance of complexes open-cut equipment // Journal of Mining Institute. 2010. Vol. 186 . p. 86-89.
Mineral raw materials complex: problems in control under new economical conditions
  • Date submitted
    2008-11-08
  • Date accepted
    2009-01-26
  • Date published
    2009-12-11

Principles optimization of expenses for the labour protection of the mining enterprises

Article preview

Classification of damage from accidents and crashes is given. Procedure optimization expenses for a labour protection and definition of economically sound risk of accidents and crashes is offered. The estimation of economic efficiency of personnel development serving the self-propelled mining equipments on ore mine «Northern» of industrial complex «Pechenga Nikel» is carried out.

How to cite: Gendler S.G., Nevskaya M.A., Dompalm E.I., Sivakova N.S. Principles optimization of expenses for the labour protection of the mining enterprises // Journal of Mining Institute. 2009. Vol. 184 . p. 27-33.
Economical aspects in the developments оf fuel & energy complex
  • Date submitted
    2008-11-01
  • Date accepted
    2009-01-22
  • Date published
    2009-12-11

Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport

Article preview

Minimization of economic losses from downtime of equipment and, first of all, off-schedule (breakdowns, accidents) is an actual problem whose solution can be achieved by the development and creation of a reserve stocks (irreducible level) materials and spare parts of electrical equipment. As a result of the study and comparative analysis of different methods for determining the amount of the reserve stocks has been concluded that these approaches are not fully reflect the real needs of the enterprise. In this regard, has developed an optimal method for determining the amount of irreducible level of reserve stocks of electrical equipment, taking into account the rational order of delivery of equipment, spare parts.

How to cite: Vazhenina L.V. Rate setting of electrical equipment reserve stocks on the enterprises of the gas main transport // Journal of Mining Institute. 2009. Vol. 184 . p. 121-124.