Condition of the soil mass at the Moscow Canal hydroelectric complex No. 4 after seventy years of operation
About authors
- 1 — Hydroproject
- 2 — Hydroproject
Abstract
The state of the ground massif is evaluated according to three parameters: surface deformations, groundwater level position and filtration strength of the pounds. A conclusion is made about the unsatisfactory condition of the pound foundation of hydraulic unit No. 4, which requires measures for its stabilization.
Область исследования:
(Archived) Development regularities of technogenic and geological processes and phenomena
Funding:
None
Similar articles
Current state and problems of geotechnical surveys for hydraulic engineering
2003 V. O. Istochnikov, S. V. Kriventsov
Using numerical programs to solve inverse hydrogeological problems to process pilot-filtration sampling
2003 K. A. Soloveichik, L. I. Sindalovskii, P. K. Konosavskii
Modern computer technology in geotechnical engineering surveys for hydraulic structures
2003 V. V. Ilin, Yu. S. Shevlyagin, A. I. Yudkevich