Optimization of the system of drainage and burial of drainage brines of the Mir pipe deposit

Authors:
F. G. Atroshchenko1
K. A. Soloveichik2
About authors
  • 1 — St. Petersburg Branch, Institute of Geoecology RAS
  • 2 — St. Petersburg Branch, Institute of Geoecology RAS
Date submitted:
2002-06-29
Date accepted:
2002-07-19
Date published:
2003-03-20

Abstract

The analysis of dewatering system operation during transition to underground development of the Mir kimberlite pipe is given. Numerical geofiltration model of the field area is developed, which is used to compare different scenarios of dewatering system operation. Forecasts of brine inflows to the drainage system and changes in levels in the Meteoro-Ichersky aquifer complex for the period up to 2020 are given. Recommendations on drainage system optimization taking into account drainage brines burial are developed.

Область исследования:
(Archived) Modern problems of geotechnical and hydrogeological surveys
Funding:

None

Go to volume 153

Similar articles

Stages and prospects of development of engineering geology as a science
2003 V. T. Trofimov
Scientific legacy of V.D. Lomtadze and prospects for the development of engineering geology at the St. Petersburg Mining Institute
2003 R. E. Dashko, I. P. Ivanov
Current state and problems of development of engineering geology
2003 V. A. Korolev
Information support for permanent mathematical models
2003 D. L. Ustyugov, Nur Abdirizak
Main factors determining the radon flux into the atmosphere in the conditions of Moscow
2003 P. S. Miklyaev, R. S. Ziangirov, T. B. Petrova
Engineering and geological characterization of the Mesozoic weathering crust
2003 E. N. Skvaletskii