Submit an Article
Become a reviewer
Vol 195
Pages:
124-128
Download volume:
RUS
Article

The designing of the constructions of the pillar underground station with applying of the low-settle building technology

Authors:
A. G. Protosenya1
P. A. Demenkov2
M. A. Karasev3
N. A. Belyakov4
K. P. Bezrodnyi5
V. A. Maslak6
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — Ph.D. associate professor Saint Petersburg State Mining University
  • 3 — Ph.D. associate professor Saint Petersburg State Mining University
  • 4 — post-graduate student Saint Petersburg State Mining University
  • 5 — Ph.D., Dr.Sci. deputy director in the field of scientific researches JSC «Lenmetrogiprotrans»
  • 6 — director general JSC «Lenmetrogiprotrans»
Date submitted:
2011-07-06
Date accepted:
2011-09-24
Date published:
2012-04-05

Abstract

The intelligent technology of designing of the constructions of pillar underground station is adduced. Station is building with applying of low-settle technology, which takes into consideration main stages of the building process. The scheme of interaction of the system «support lining-soil massif» was accepted as basic scheme of calculations. The calculations of the stress-strain condition of constructions was performed with applying of finite-elements method.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
underground station permanent support lining soil massif temporary support lining model stress
Go to volume 195

References

  1. Protosenya A.G., Belyakov N.А. The determination of the volume stress-strain conditions of the soil massif in the face area of the tunnel in conditions of drafting with using of contledge of the face // Notes of Mining Institute. 2011. Vol.190. P.149-163.
  2. Demenkov P.A. The influence of building technology on forming of the load in conditions of the underground column-type station «Komendantsky prospect» of SaintPetersburg underground // The Proceedings of Mining Institute. Saint Petersburg, 2004. Vol.155. P.102-105.

Similar articles

Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining
2012 G. A. Kholodnyakov, A. O. Ipatova, D. A. Ikonnikov, K. R. Argimbaev
Synthesis of the mechanism of the effektor of a gathering-arm loader
2012 M. A. Vasileva, A. Yu. Kuzkin, I. P. Timofeev
Analysis of the effectiveness of regulations in the subsoil usage (illustrated on regulating the level of cost oil under psas)
2012 N. E. Chebaeva
Self-propellet rail transporting mechanisms with even driving wheels
2012 N. A. Belous, A. V. Bolshunov, G. V. Sokolova
Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger
2012 G. A. Kholodnyakov, K. R. Argimbaev, S. P. Reshetnyak
Selecting parameters of wind and diesel power plant for power supply of mining intallations
2012 B. N. Abramovich, A. A. Belskii