Abstract
Technological solutions of ore loss reduction in interchamber pillars at bottom levels design of Gubkin mine are developed. Research based on physical (with the use of equivalent materials) and mathematical (finite element method) modelling has been carried out. The requirement for pilot work before industrial scale use is established.
Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
ore loss reduction
pillar lining
rope rock bolts
partial pillar recovery
physical and mathematical modelling
References
- Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. Simulation in geomechanics. Moscow, 1991. 240 p.
- Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. Simulation of mining pressure occurrences. Leningrad, 1968. 280 p.
Similar articles
Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)
2012 R. E. Dashko, A. V. Shidlovskaya, O. Yu. Aleksandrova, I. V. Alekseev
Long face ventilation performance improving in development of seam by pillarless technology
2012 V. S. Elkin
Features land recultivation, disturbed as a result of activities of dzhidinsky mining treatment complex
2012 S. I. Fomin, E. L. Ubugunov, V. A. Shevelev