Physical and mathematical modelling of level- chamber method operational parameters at the bottom level of Gubkin mine
About authors
- 1 — Ph.D., Dr.Sci. rector Saint Petersburg Mining University ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
- 2 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
- 3 — post-graduate student Saint Petersburg State Mining University
Abstract
Technological solutions of ore loss reduction in interchamber pillars at bottom levels design of Gubkin mine are developed. Research based on physical (with the use of equivalent materials) and mathematical (finite element method) modelling has been carried out. The requirement for pilot work before industrial scale use is established.
Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
ore loss reduction
pillar lining
rope rock bolts
partial pillar recovery
physical and mathematical modelling
References
- Glushikhin F.P, Kuznetsov G.N., Shklyarskij M.F. Simulation in geomechanics. Moscow, 1991. 240 p.
- Kuznetsov G.N., Budko M.N., Vasiljev Yu.I. Simulation of mining pressure occurrences. Leningrad, 1968. 280 p.
Similar articles
Hydro-geological monitoring on the Jakovlevsky mine as implement of increase safety conducting mine second working in difficult mine-geological conditions
2012 R. E. Dashko, E. N. Kovaleva
Microbial activity in mine working and its influence on high-grade iron ore's and constructional material's properties
2012 R. E. Dashko, I. V. Alekseev
Long face ventilation performance improving in development of seam by pillarless technology
2012 V. S. Elkin
Specificity technological scheme development of the stocks on mine «Yakovlevsky»
2012 A. A. Antonov, M. D. Morozov, A. S. Malyutin