Specificity technological scheme development of the stocks on mine «Yakovlevsky»
About authors
- 1 — Ph.D. associate professor Saint Petersburg State Mining University
- 2 — post-graduate student Saint Petersburg State Mining University
- 3 — student Saint Petersburg State Mining University
Abstract
The analysis of actually developed technological scheme of Jakovlevsky mine is made. The basic directions of perfection of existing technology of working off for-passes, promoting increase of capacity and decrease in costs proiz-vodstva ores are offered. The further direction of researches which will allow oprede-pour rational, a relative positioning clearing заходок in fulfilled layers and para-metres of technological schemes of joint dredging of layers is con- sidered.
Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
References
- Zubov V.P. Conception of excavation the highgrade iron ore section deposit Yakovlevsky / V.P.Zubov, A.A.Antonov // Proceedings of Mining Institute. Saint Petersburg, 2006. Vol. 168. P.203-210.
- Zubov V.P. Higher grade filling due to horizontal layers extraction in Yakovlevsky ore deposit / V.P.Zubov,
- A.A.Antonov, Yu.N.Lugovskoi, M.D.Morozov, O.V.Mikhailenko // Proceedings of Mining Institute. Saint Petersburg, 2010. Vol. 185. P.25-30.
- Kaplunov D.R. Strenghthening of the role of underground mining in the development of iron ore deposit / D.R.Kaplunov, A.I.Suhoruchenkov, V.A.Yukov // Mining magazine. 2006. N 4. P.52-55.
Similar articles
Design features of replacement work equipment of peat excavation laoding machine
2012 D. O. Nagornov, E. A. Kremcheev
Synthesis of the mechanism of the effektor of a gathering-arm loader
2012 M. A. Vasileva, A. Yu. Kuzkin, I. P. Timofeev
Control of gasevolutioncoal-beds – the key factor of creation of safe working conditions
2012 I. V. Kurta