Explanation and development of new equipment for drilling rat holes in multilateral wells

Authors:
R. R. Zaripov1
Yu. T. Morozov2
A. A. Mukhametshin3
About authors
  • 1 — post-graduate student Saint Petersburg State Mining University
  • 2 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 3 — Ph.D. senior research assistant TatNIPIneft
Date submitted:
2011-07-06
Date accepted:
2011-09-17
Date published:
2012-04-05

Abstract

The research has been carried out to improve technologies and equipment for drilling multilateral wells constructions to create the most feasible well spacing. To prove the idea testing technical features of shaped tube ability to take its initial shape due to the action of inner and outer liquid pressure the investigation has been carried out. The tests have shown the capability of cramp iron to be reused for fastening whipstock inside the well with its following extracting.

Область исследования:
(Archived) Topical issues in prospecting and development of oil and gas deposits
Keywords:
multilateral well whipstock reamer out-of-commission liquid pressure sidetracking
Funding:

None

Go to volume 195

References

  1. Abdulmazitov R. Methodical guide for geotechnical foundation in horizontal, multilateral and sidetracking drilling. Bugulma, 2005.
  2. Muhametshin A. Improvement of sidetracking technique on the basis of hydromechanical whipstocks: PhD dissertation. Bugulma, 2010.
  3. Fraya H. New ways for multilateral well drilling // Oil and gas overview. 2003. N 1.

Similar articles

Determination of the rate of bunker filling screw executive authority and power to cut costs
2012 E. A. Kremcheev, A. V. Bolshunov, D. O. Nagornov
Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)
2012 R. E. Dashko, A. V. Shidlovskaya, O. Yu. Aleksandrova, I. V. Alekseev
Optimization of pulse width modulation for multilevel converters of variable-frequency electric drive
2012 A. V. Kudryavtseva, O. B. Shonin
Study of engineering-geological and microbiological factors for assessing the dynamics of fracture in tunnel highway Saint Petersburg – Kiev
2012 R. E. Dashko, K. V. Pankratova, A. A. Korobko
Results of researches and trial introduction of plasma-pulse action technology on deposits of Russia
2012 A. A. Molchanov, A. V. Maksyutin, R. R. Khusainov
Social-economic effects of forming oil and gas cluster in murmansk region
2012 A. N. Sultani