Submit an Article
Become a reviewer
Vol 195
Pages:
277-280
Download volume:
RUS
Article

Automatic adjustment of metrology performance meter random signal transducer analyzer liquid flows

Authors:
R. M. Proskuryakov1
A. V. Kopteva2
I. N. Voityuk3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-07-19
Date accepted:
2011-09-12
Date published:
2012-04-05

Abstract

New way of statistical pulsation measurements by radioisotope technique is described, being alternative to the existing stream control methods and allowing to improve accuracy of measurements. The basic formula fundamental for the method of calibration characteristics correction is shown.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
multiphase multicomponent stationary non-stationary the converter metrological radio isotope a component non-contact flow
Go to volume 195

References

  1. Averinа T.А., Artemiev S.S. Analysis of the accuracy of Monte Carlo methods for solving boundary value problems by means of the probabilistic representation of // Siberian Journal of Computer Science. 2008. Vоl. 11. N 3. P. 239-250.
  2. Gazin D.I., Kratirov V.A. The problem of detecting free gas in the tank oil and ways to solve // Microprocessor instrument: Proceeding of the Saint-Petersburg State Polytechnic University. 2003. Iss. 3. P.48-54.
  3. Gusev N.G. The gamma radiation from radioactive isotopes and fission products. Theory and tables. Moscow, 1958. 233 p

Similar articles

Estimation of technogenic risk spatial distribution at aero-technogenic environmental impact оf overburden dump
2012 S. G. Gendler, V. S. Kuznetsov, D. A. Lyubovinkin
Control of gasevolutioncoal-beds – the key factor of creation of safe working conditions
2012 I. V. Kurta
Probabilistic approach to the assessment of energy transmissions of mining machines
2012 I. E. Zvonarev, A. S. Fokin, S. L. Ivanov
Engiineering-geological and hydrogeological problems of st. Isaak cathedral’s long-term stability substantiation (Saint-Petersburg)
2012 R. E. Dashko, A. V. Shidlovskaya, O. Yu. Aleksandrova, I. V. Alekseev
Prospective ways of diamondiferous rock enrichment wastes utilization at M.V.Lomonosov diamond deposit
2012 A. Yu. Oblitsov, V. A. Rogalev
Physical and mathematical modelling of level- chamber method operational parameters at the bottom level of Gubkin mine
2012 Vladimir S. Litvinenko, E. I. Boguslavskii, P. V. Korzhavykh