Submit an Article
Become a reviewer
Vol 198
Pages:
37-42
Download volume:
RUS
Article

Experience in ore reserves extraction in open-pit borders and bottom in transition from open-pit to underground mining

Authors:
M. S. Tankov1
I. S. Shelkovyi2
About authors
  • 1 — laboratory head OJSC «Uralmekhanobr»
  • 2 — junior research assistant OJSC «Uralmekhanobr»
Date submitted:
2011-10-07
Date accepted:
2011-12-16
Date published:
2012-11-19

Abstract

The article presents the results of industrial-experimental tests of technology for extraction of open-pit border and bottom reserves of copper sulphide ores under different conditions at ore mines of OJSC «Uchalinsk MDK». Description is given to the technology of extraction of border reserves at the Sibay under- ground ore mine with the use of the open chamber with ore discharge through underground workings, as well as to the order of ore reserves extraction at the Uchalinsk underground ore mine.

Область исследования:
(Archived) Innovation in designing of mining plants
Keywords:
extraction of border and bottom reserves sulphide ores new variants of mining methods scheme of reserves mining efficiency upgrading of mining production
Funding:

None

Go to volume 198

Similar articles

Interaction between seismic activity in Kuzbass and open-pit operations
2012 S. V. Tsirel, A. A. Pavlovich
Problem solving of design and planning of open pit mining in Mineframe system
2012 O. V. Nagovitsyn, S. V. Lukichev, A. Yu. Alisov
Peculiarities of prof. S.D.Korobov’s algorithm appliance in open-pit boundaries determination and mining operation regime justification
2012 A. L. Bilin
Advanced concentration technology of phosfatic- bearing ore of Oleniy ruchey deposit (Kola peninsula)
2012 V. I. Beloborodov, I. B. Zakharova, G. P. Andronov, N. M. Filimonova
Designing of complex mining operations in coal mines
2012 O. V. Kovalev, S. P. Mozer, I. Yu. Tkhorikov
Valuation of sustainable of pit wall
2012 M. G. Mustafin, A. P. Sannikova, P. I. Yushmanov