Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
80-82
Download volume:
RUS
Article

Development of low-power shale beds by mounted rippers

Authors:
N. N. Timofeev
Date submitted:
1971-07-04
Date accepted:
1971-09-06
Date published:
1972-07-07

Abstract

Continuous improvement of technology and mechanization of open-pit mining operations has made it possible to develop mineral deposits represented by low thickness layers of complex structural structure. From the point of view of economic efficiency the most interesting is the selective development of the formation, which has a number of advantages over partially selective and gross excavation: preparatory works are developed independently of excavation and loading; losses of oil shale are minimal; qualitative averaging of organic mass in the face is achieved; excavation and loading machines and technological transport do not dwell on the movement of rock layers; there is no need for mechanical method of enrichment of oil shale; drilling and blasting method is not necessary.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Determination of direction and organization of deepening of an open pit at development of ore bodies of complex shape
1972 L. F. Sannikova, A. P. Garkushin
Interrelations of velocities in mining development (volumetric problem)
1972 G. P. Konstantinov
Dynamics of drilling works volumes at the quarries of the Polar region
1972 A. E. Sigachev, M. M. Zemdega
Classification of stripping methods and systems of development of quarry fields
1972 A. I. Arsentiev
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev
Determination of ore pit productivity reserve
1972 O. V. Shpansky