Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
36-38
Download volume:
RUS
Article

Nomenclature of rock mass reserves in an open pit

Authors:
A. F. Bogacheva
Date submitted:
1971-07-16
Date accepted:
1971-09-18
Date published:
1972-07-07

Abstract

In the existing classifications there is a large number of categories of mineral reserves by preparedness (opened, prepared, ready for extraction, in clean-up, in pillars, flooded, etc.) and absolutely no division into categories by preparedness for excavation of waste rocks. To eliminate uncertainty in the interpretation of the role of reserves in the operation of the quarry and to justify the number and nomenclature of categories of reserves, let us consider the quarry as a system with all its interacting links. ...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Contribution of scientists of St. Petersburg-Leningrad Mining Institute to the development of open pit mining (to the 200th anniversary of the Leningrad Mining Institute)
1972 A. I. Arsentiev, G. S. Mikhailov
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Analysis of seasonal fluctuations of rock and ore extraction at open pits in the Arctic
1972 A. E. Sigachev
Statistical analysis of working bench width
1972 A. F. Bogachev, D. I. Shitov
Planning of excavator productivity in the Arctic region conditions
1972 B. A. Egin
Influence of granite fracturing on the indicators of thermal borehole drilling
1972 V. K. Bubok, I. Yu. Bukin