Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
80-82
Download volume:
RUS
Article

Development of low-power shale beds by mounted rippers

Authors:
N. N. Timofeev
Date submitted:
1971-07-04
Date accepted:
1971-09-06
Date published:
1972-07-07

Abstract

Continuous improvement of technology and mechanization of open-pit mining operations has made it possible to develop mineral deposits represented by low thickness layers of complex structural structure. From the point of view of economic efficiency the most interesting is the selective development of the formation, which has a number of advantages over partially selective and gross excavation: preparatory works are developed independently of excavation and loading; losses of oil shale are minimal; qualitative averaging of organic mass in the face is achieved; excavation and loading machines and technological transport do not dwell on the movement of rock layers; there is no need for mechanical method of enrichment of oil shale; drilling and blasting method is not necessary.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak
Nomenclature of rock mass reserves in a quarry
1972 A. F. Bogacheva
Technology of development of watered rock formations by draglines
1972 G. S. Mikhailov, Kh. S. Davlet-Kildiev, L. A. Slutsman
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Selection of the direction of mining development in unstable rocks
1972 S. G. Khristov
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev