Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Criteria for assessing the optimality of the direction of mining operations in a quarry
1972 A. I. Arsentiev
Nomenclature of rock mass reserves in a quarry
1972 A. F. Bogacheva
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Analysis of seasonal fluctuations of rock and ore extraction in the Polar Region quarries
1972 A. E. Sigachev
Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev