Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Dynamics of drilling works volumes at the quarries of the Polar region
1972 A. E. Sigachev, M. M. Zemdega
Criteria for assessing the optimality of the direction of mining operations in a quarry
1972 A. I. Arsentiev
Contribution of scientists of St. Petersburg-Leningrad Mining Institute to the development of open pit mining (to the 200th anniversary of the Leningrad Mining Institute)
1972 A. I. Arsentiev, G. S. Mikhailov
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev