Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Influence of landslides on the productivity of mining transportation equipment
1972 S. G. Khristov
Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Estimation of the uniformity of mining transportation equipment operation in the quarries of the Polar Region
1972 A. V. Zhukov