Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
39-43
Download volume:
RUS
Article

Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev
Criteria for assessing the optimality of the direction of mining operations in a quarry
1972 A. I. Arsentiev
Interrelations of velocities in mining development (volumetric problem)
1972 G. P. Konstantinov
Classification of stripping methods and systems of development of quarry fields
1972 A. I. Arsentiev
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Contribution of scientists of St. Petersburg-Leningrad Mining Institute to the development of open pit mining (to the 200th anniversary of the Leningrad Mining Institute)
1972 A. I. Arsentiev, G. S. Mikhailov