Abstract

Determination of quarry boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary cutoff stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is outlined.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Development of thin shale beds by mounted rippers
1972 N. N. Timofeev
Analysis of seasonal fluctuations of rock and ore extraction at open pits in the Arctic
1972 A. E. Sigachev
Dynamics of drilling work volumes at open pits in the Arctic.
1972 A. E. Sigachev, M. M. Zemdega
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Classification of stripping methods and systems of development of open pit fields
1972 A. I. Arsentiev
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev