Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Selection of the direction of mining development in unstable rocks
1972 S. G. Khristov
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov