Article

Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Contribution of scientists of St. Petersburg-Leningrad Mining Institute to the development of open pit mining (to the 200th anniversary of the Leningrad Mining Institute)
1972 A. I. Arsentiev, G. S. Mikhailov
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Determination of direction and organization of deepening of an open pit at development of ore bodies of complex shape
1972 L. F. Sannikova, A. P. Garkushin
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev