Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
39-43
Download volume:
RUS
Article

Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Nomenclature of rock mass reserves in a quarry
1972 A. F. Bogacheva
Selection of the direction of mining development in unstable rocks
1972 S. G. Khristov
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev
Contribution of scientists of St. Petersburg-Leningrad Mining Institute to the development of open pit mining (to the 200th anniversary of the Leningrad Mining Institute)
1972 A. I. Arsentiev, G. S. Mikhailov