Determination of open pit boundaries by the method of using the acceptable average stripping ratio

Authors:
O. V. Shpansky
A. A. Kovpak
Date submitted:
1971-07-29
Date accepted:
1971-09-21
Date published:
1972-07-07

Abstract

Determination of open pit boundaries is one of the main tasks of designing the field development. Its solution is usually carried out in three stages. The boundary stripping ratio is calculated, then the method of delineation is selected, and, finally, according to the selected method, the quarry is delineated.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Analytical determination of the direction of deepening of a circular pit
1972 L. A. Slutsman
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Nomenclature of rock mass reserves in a quarry
1972 A. F. Bogacheva
Analysis of seasonal fluctuations of rock and ore extraction in the Polar Region quarries
1972 A. E. Sigachev