Abstract

The direction of deepening of the quarry is characterized by the trace of moving in the quarry space, as the works are lowered, the place of the initial preparatory excavation at each of the horizons. The graph-analytical method proposed by A. I. Arsentiev and G. A. Sovetov was used to determine the rational direction of deepening. The minimum of the average overburden ratio since the beginning of development is taken as the criterion of optimality, at which the minimum of the present costs of construction and operation of the open pit is achieved. The purpose of the study is to verify the applicability of the methodology in determining the direction of deepening for quarries with complex geological and topographical conditions of development, as well as to identify the features of deepening of such quarries.

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Analytical determination of the direction of deepening of a circular pit
1972 L. A. Slutsman
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Selection of the direction of mining development in unstable rocks
1972 S. G. Khristov
Technology of development of watered rock formations by draglines
1972 G. S. Mikhailov, Kh. S. Davlet-Kildiev, L. A. Slutsman
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin