Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
8-13
Download volume:
RUS
Article

Criteria for assessing the optimality of the direction of mining operations in a open pit

Authors:
A. I. Arsentiev
Date submitted:
1971-07-04
Date accepted:
1971-09-11
Date published:
1972-07-07

Abstract

One of the most important decisions in the design of open pits is the choice of direction and intensity of movement of mining operations in the horizontal direction and in depth. These issues are usually solved when establishing the method of opening the open pit field and the calendar plan of mining operations. Implemented opening at the deposit for a long time, and sometimes forever, predetermines the order and efficiency of the open pit.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

References

  1. Arsentiev A. I. Determination of productivity and boundaries of quarries. 2nd ed. Nedra, 1970. (in Russian)
  2. Astakhov A. S. Economic Efficiency of Capital Investments in the Coal Industry. Nauka, 1964. (in Russian)
  3. Khokhryakov V. S. Indicators of technical progress in the USSR quarries. Izv. vuzov, Gornyi zhurnal, 1965, No. 10. (in Russian)

Similar articles

Influence of landslides on the productivity of mining transportation equipment
1972 S. G. Khristov
On the efficiency of blending stockpile operation
1972 E. I. Azbel, A. I. Shein
Dynamics of drilling work volumes at open pits in the Arctic.
1972 A. E. Sigachev, M. M. Zemdega
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Nomenclature of rock mass reserves in an open pit
1972 A. F. Bogacheva