Estimation of the uniformity of mining transportation equipment operation in the quarries of the Polar Region

Authors:
A. V. Zhukov
Date submitted:
1971-07-04
Date accepted:
1971-09-01
Date published:
1972-07-07

Abstract

Uneven operation allows to eliminate equipment downtime, eliminate violations of technological discipline and eliminate unproductive costs associated with deviations from the normal course of production. Unevenness of the production process of pvda extraction may not create negative consequences for other related technological processes, if this unevenness is provided. But arising in the technological process disproportions can not always be provided in advance plan and to prevent them, should create appropriate reserves (damping devices, accumulating capacity).

Область исследования:
(Archived) Without section
Go to volume 63

References

  1. Adamov V. E. Statistical Study of the Rhythmicity of Industrial Production. Statistics, 1965.
  2. Astakhov A. S. Modes of Work of Mines. Gosgortekhizdat, 1962.
  3. Kababiansky Kh. S. Basic Issues of Mining Statistics. Uglegrotekhizdat, 1953.
  4. Minervin G. V. To the issue of assessing the rhythmicity of the enterprise's work. In the collection: Statistics and Econometrics. PH Moscow Financial Institute, 1959.

Similar articles

Determination of ore pit productivity reserve
1972 O. V. Shpansky
Criteria for assessing the optimality of the direction of mining operations in a quarry
1972 A. I. Arsentiev
Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak
Dynamics of drilling works volumes at the quarries of the Polar region
1972 A. E. Sigachev, M. M. Zemdega
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin