Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
44-45
Download volume:
RUS
Article

Clarification of the boundary stripping ratio in the development of complex ores

Authors:
L. F. Sannikova
Date submitted:
1971-07-06
Date accepted:
1971-09-20
Date published:
1972-07-07

Abstract

One of the well-known methods of determining the limit overburden ratio in open pit mining is the method of comparing the allowable cost of the mineral, calculated taking into account all capital costs of mining and processing of raw materials and recoverable value, with the actual cost of ore extraction and removed overburden, taken by analogues...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Criteria for assessing the optimality of the direction of mining operations in a quarry
1972 A. I. Arsentiev
Nomenclature of rock mass reserves in a quarry
1972 A. F. Bogacheva
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev