Submit an Article
Become a reviewer
Vol 63 Iss. 1
Pages:
44-45
Download volume:
RUS
Article

Clarification of the boundary stripping ratio in the development of complex ores

Authors:
L. F. Sannikova
Date submitted:
1971-07-06
Date accepted:
1971-09-20
Date published:
1972-07-07

Abstract

One of the well-known methods of determining the limit overburden ratio in open pit mining is the method of comparing the allowable cost of the mineral, calculated taking into account all capital costs of mining and processing of raw materials and recoverable value, with the actual cost of ore extraction and removed overburden, taken by analogues...

Область исследования:
(Archived) Without section
Go to volume 63

Similar articles

Classification of stripping methods and systems of development of quarry fields
1972 A. I. Arsentiev
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Interrelations of velocities in mining development (volumetric problem)
1972 G. P. Konstantinov
Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Determination of ore pit productivity reserve
1972 O. V. Shpansky
Determination of direction and organization of deepening of an open pit at development of ore bodies of complex shape
1972 L. F. Sannikova, A. P. Garkushin