Clarification of the boundary stripping ratio in the development of complex ores

Authors:
L. F. Sannikova
Date submitted:
1971-07-06
Date accepted:
1971-09-20
Date published:
1972-07-07

Abstract

One of the well-known methods of determining the limit overburden ratio in open pit mining is the method of comparing the allowable cost of the mineral, calculated taking into account all capital costs of mining and processing of raw materials and recoverable value, with the actual cost of ore extraction and removed overburden, taken by analogues...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev
Determination of direction and organization of deepening of an open pit at development of ore bodies of complex shape
1972 L. F. Sannikova, A. P. Garkushin
Blasted rock mass stockpile management at a quarry
1972 K. I. Kataya, N. P. Ershov, A. F. Bogachev, V. V. Plekhov
Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Development of low-power shale beds by mounted rippers
1972 N. N. Timofeev