Interrelations of velocities in mining development (volumetric problem)

Authors:
G. P. Konstantinov
Date submitted:
1971-07-02
Date accepted:
1971-09-13
Date published:
1972-07-07

Abstract

Movements of mining operations in the development of the open pit are characterized by two directions: horizontal - as the working ledges are worked out. - and lowering of mining works - in the process of deepening of the open pit. Let's assume that the quarry has the form of a regular cone and we know the coordinates of points O1, 02, O3, ..., On, determining the direction of deepening...

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Determination of ore pit productivity reserve
1972 O. V. Shpansky
Planning of excavator productivity in the Polar region conditions
1972 B. A. Egin
Classification of stripping methods and systems of development of quarry fields
1972 A. I. Arsentiev
Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Analytical determination of the direction of deepening of a circular pit
1972 L. A. Slutsman
Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak