Selection of the direction of mining development in unstable rocks

Authors:
S. G. Khristov
Date submitted:
1971-07-26
Date accepted:
1971-09-07
Date published:
1972-07-07

Abstract

Possible options for the development of mining operations in open pits are not sufficiently taken into account in planning, and sometimes good solutions for the period do not contribute to success in the future. Opening the open pit field, it is necessary to focus not only on the rapid commissioning of the mine, but also to lay the cut trench in stable rocks, especially in fields with complex engineering and geological conditions, ie, taking the final decision of the option, it is necessary, along with the indicators of the mode of stripping, the productivity of the mine, the development of mine transportation communications, take into account and the factor of stability of slopes and sides.

Область исследования:
(Archived) Without section
Funding:

None

Go to volume 63

Similar articles

Influence of granite fracturing on the indicators of thermal drilling of wells
1972 V. K. Bubok, I. Yu. Bukin
Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak
Interrelations of velocities in mining development (volumetric problem)
1972 G. P. Konstantinov
Clarification of the boundary stripping ratio in the development of complex ores
1972 L. F. Sannikova
Optimality problem in air exchange control in quarries
1972 Yu. V. Gul
Determination of ore pit productivity reserve
1972 O. V. Shpansky