Determination of ore pit productivity reserve

Authors:
O. V. Shpansky
Date submitted:
1971-07-03
Date accepted:
1971-09-08
Date published:
1972-07-07

Abstract

Correctly chosen productivity of the open pit on mineral resources has always been the key to sustainable and economical operation of the mining enterprise. And the more complex the geological structure of the deposit, the more difficult the task of determining the productivity. Apatit's Koashvinskoye apatite-nepheline deposit is a very complex one. It is represented by four ore bodies with a configuration characterized in plan view and at depth by frequent swellings and overhangs.

Область исследования:
(Archived) Without section
Go to volume 63

References

  1. Arsentiev A. I. Determination of Productivity and Boundaries of Quarries. 2nd ed. Nedra, 1970.
  2. Arsentyev A. I., Kvitka V. V. Influence of Reliability of Balance Reserves on the Production Capacity of the Quarry. In the collection: Problems of Work of Quarries of the North. PH LMI, 1968.
  3. Levin L. V. Consideration of the reliability of reserves in determining the productivity of quarries. In the collection: Work of Quarries in Difficult Conditions. Nauka, 1967.

Similar articles

Dynamics of drilling works volumes at the quarries of the Polar region
1972 A. E. Sigachev, M. M. Zemdega
Determination of direction and organization of deepening of an open pit at development of ore bodies of complex shape
1972 L. F. Sannikova, A. P. Garkushin
Statistical analysis of working area width
1972 A. F. Bogachev, D. I. Shitov
Speed of deepening of an open pit at application of draglines
1972 V. P. Linev
Determination of open pit boundaries by the method of using the acceptable average stripping ratio
1972 O. V. Shpansky, A. A. Kovpak
Criterion for estimating the intensity of construction and development of quarry productivity
1972 S. B. Rubinshtein, V. P. Linev