Open mining technique for unconventional mineral deposits

Article preview

Nowadays the majority of deposits are successfully exploiting by mining enterprises with the help of traditional excavation and loading equipment. Typically, metals, construction materials, etc. are mined and extracted on these deposits, but modern society is progressing and producing new requirements to metals properties for creating a new type of equipment. The metals with new properties are located in unconventional areas: either in technogenic deposits (overburden dumps, tailings, etc.) or in hard-to-get natural formations. Technogenic mines, being a tailing of Kachkanarsky mining and processing plant, are referred to such unique deposits, which have expensive metals (scandium, gallium, strontium, titanium), as well as the natural deposit – rhenium deposit, located in the crater of an active volcano. Potentialities of open mining in the largest rhenium deposit with complex environmental occurrence have been analyzed in the paper. Temperature measurement results of adjacent strata and a temperature scheme of the host rocks on a separate site and the entire field have been presented. An open mining technique for a primary mining area as well as perspective methods of rock preparation for excavation, applicable to this particular deposit, has been considered.

How to cite: Kholodnyakov G.A., Argimbaev K.R. Open mining technique for unconventional mineral deposits // Journal of Mining Institute. 2015. Vol. 216. p. 82.
Metallurgy, physical and chemical regularities of technological processes
  • Date submitted
    2013-01-22
  • Date accepted
    2013-03-24
  • Date published
    2013-07-01

Substantiation of the possibility of involvement in processing of the iron-containing tails with the subsequent clotting of the obtained concentrates

Article preview

The tailings dumps of the ironore mining-reprocessing enterprises exert extremely negative influence on the environment, but at the same time, under the conditions of the impoverishment of iron ores they are potential raw source. In connection with this, a question of involvement in processing of the tails containing iron is extremely urgent. In the article the technology on processing of the waste of the beneficiation of iron ores is suggest. In this case the clotting of the obtained concentrates can be carry out by briquetting. In the work are also given the results of researches of the iron-containing tails concentrating and briquettability of the concentrates obtained of them.

How to cite: Argimbaev K.R., Kornev A.V., Kholodnyakov G.A. Substantiation of the possibility of involvement in processing of the iron-containing tails with the subsequent clotting of the obtained concentrates // Journal of Mining Institute. 2013. Vol. 206. p. 120.
Present-day problems of geomechanics, mining practice and innovation technologies in mining engineering
  • Date submitted
    2011-09-28
  • Date accepted
    2011-11-25
  • Date published
    2012-03-01

Rationale for the development of the method of existing iron typetailing gully

Article preview

In the Russian Federation, about 40 % of tailings dumps are in operation GOK. The development of mechanized impossible, due to heavy water production, the  stability of the dam breach and the possibility of a  breakthrough. In this regard, the task of developing the existing tailings dumps will now increase the competitiveness of enterprises and reduce the cost of iron ore concentrate.

How to cite: Ekgardt V.I., Kvitka V.V., Kholodnyakov G.A., Argimbaev K.R. Rationale for the development of the method of existing iron typetailing gully // Journal of Mining Institute. 2012. Vol. 197. p. 159.
Topical issues in mining of ore and nonmetallic minerals
  • Date submitted
    2011-07-01
  • Date accepted
    2011-09-26
  • Date published
    2012-01-01

Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Article preview

Development water sated tailing dump are accompanied explosive failure banks  even  at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the  top  platform  tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

How to cite: Kholodnyakov G.A., Argimbaev K.R., Reshetnyak S.P. Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger // Journal of Mining Institute. 2012. Vol. 195. p. 138.
Topical issues in mining of ore and nonmetallic minerals
  • Date submitted
    2011-07-01
  • Date accepted
    2011-09-13
  • Date published
    2012-01-01

Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining

Article preview

The technique of ore reclaiming process flowsheets with stationary both semiportable crushers and classifying points parameters definition is  presented. The best results of ore reclaiming are obtained by unloading ore to the  loading  bunker  from several working faces.

How to cite: Kholodnyakov G.A., Ipatova A.O., Ikonnikov D.A., Argimbaev K.R. Ore reclaiming process flowsheets for the cyclical and continuous method of open-cast mining // Journal of Mining Institute. 2012. Vol. 195. p. 142.