Submit an Article
Become a reviewer
Vol 195
Pages:
138-141
Download volume:
RUS
Article

Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Authors:
G. A. Kholodnyakov1
K. R. Argimbaev2
S. P. Reshetnyak3
About authors
  • 1 — Ph.D., Dr.Sci. professor Saint Petersburg State Mining University
  • 2 — post-graduate student Saint Petersburg State Mining University
  • 3 — Ph.D., Dr.Sci. associate professor, leading technician «Giproshaht»
Date submitted:
2011-07-01
Date accepted:
2011-09-26
Date published:
2012-04-05

Abstract

Development water sated tailing dump are accompanied explosive failure banks even at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the top platform tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Область исследования:
(Archived) Topical issues in mining of ore and nonmetallic minerals
Keywords:
tailing dump excavator «backdigger» tailing height of face algorithm program intensity
Go to volume 195

References

  1. Nurok G.A., Lugovskaya A.G., Sherstukov A.D. Hydraulic-mine dumps at strip-pits. Moscow, 1973.
  2. Fisenko I.V. Stability of open pit slopes. Moscow, 1973.
  3. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Determining physical and mechanical properties of tailings of iron-bearing tailing dumps // Mining informational and Analytical Bulletin. Moscow, 2011.
  4. Kholodnyakov G.A., Argimbaev K.R., Ikonnikov D.A. Excavating and loading equipment for the development of semi-dry tailing dumps // Development of mineral resources of the North. Problems and solutions. Vorkuta, 2011. Vol. 1.

Similar articles

Approach to perfection and progress of the industrial infrastructure (on the example of the deposit «Glubokoe» on extraction of plaster in the Arkhangelsk area)
2012 V. A. Modyanova
Way remote magnitometrichesky control of the technical condition of the main pipelines
2012 A. N. Lyubchik
Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva
Estimation of technogenic risk spatial distribution at aero-technogenic environmental impact оf overburden dump
2012 S. G. Gendler, V. S. Kuznetsov, D. A. Lyubovinkin
Explanation and development of new equipment for drilling rat holes in multilateral wells
2012 R. R. Zaripov, Yu. T. Morozov, A. A. Mukhametshin
Probabilistic approach to the assessment of energy transmissions of mining machines
2012 I. E. Zvonarev, A. S. Fokin, S. L. Ivanov