Submit an Article
Become a reviewer
Vol 195
Pages:
138
Download volume:
RUS

Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Authors:
G. A. Kholodnyakov1
K. R. Argimbaev2
S. P. Reshetnyak3
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
  • 3 — «Giproshaht»
Date submitted:
2011-07-01
Date accepted:
2011-09-26
Date published:
2012-04-05

Abstract

Development water sated tailing dump are accompanied explosive failure banks  even  at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the  top  platform  tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Go to volume 195

References

  1. Нурок Г.А. Гидроотвалы на карьерах / Г.А.Нурок, А.Г.Луговская, А.Д.Шерстрюков М., 1973.
  2. Фисенко И.В. Устойчивость бортов карьеров и отвалов. М., 1973.
  3. Холодняков Г.А. Определение физико-механических свойств хвостов железосодержащих хвостохранилищ / Г.А.Холодняков, К.Р.Аргимбаев, Д.А.Иконников // Горный информационно-аналитический бюллетень. М., 2011.
  4. Холодняков Г.А. Выемочно-погрузочное оборудование для разработки полусухих хвостохранилищ / Г.А.Холодняков, К.Р.Аргимбаев, Д.А.Иконников // Освоение минеральных ресурсов Севера: проблемы и решения. Воркута, 2011. Т.1.

Similar articles

Cause rapid wear tangential cutters
2012 V. I. Bolobov, V. L. Bolobov, M. P. Talerov, V. S. Bochkov
Estimation of atmospheric air pollution аt construction and operation of traffic tunnel
2012 S. G. Gendler, V. A. Rogalev
Conception of mining and chemical company competitivness growth strategy creation
2012 A. A. Ilinova
The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Design of tunnel lining of main line tunnels based on the evaluation of stress distribution patterns in tunnel lining
2012 A. G. Protosenya, V. L. Trushko, M. A. Karasev, D. V. Sidorov
Determination of the rate of bunker filling screw executive authority and power to cut costs
2012 E. D. Kremcheev, A. V. Bolshunov, D. O. Nagornov