Submit an Article
Become a reviewer
Vol 195
Pages:
138
Download volume:
RUS

Determining the mine working height for the development of tailing dumps hydraulic excavator backdigger

Authors:
G. A. Kholodnyakov1
K. R. Argimbaev2
S. P. Reshetnyak3
About authors
  • 1 — Saint Petersburg State Mining University
  • 2 — Saint Petersburg State Mining University
  • 3 — «Giproshaht»
Date submitted:
2011-07-01
Date accepted:
2011-09-26
Date published:
2012-04-05

Abstract

Development water sated tailing dump are accompanied explosive failure banks  even  at their height less 10 meters. Thereupon, the problem decision on research competence a slope and to a choice of optimum height production a dredge face «backdigger», established on the  top  platform  tailing dump, will allow to reduce equipment downtimes and to increase intensity mining.

Go to volume 195

References

  1. Нурок Г.А. Гидроотвалы на карьерах / Г.А.Нурок, А.Г.Луговская, А.Д.Шерстрюков М., 1973.
  2. Фисенко И.В. Устойчивость бортов карьеров и отвалов. М., 1973.
  3. Холодняков Г.А. Определение физико-механических свойств хвостов железосодержащих хвостохранилищ / Г.А.Холодняков, К.Р.Аргимбаев, Д.А.Иконников // Горный информационно-аналитический бюллетень. М., 2011.
  4. Холодняков Г.А. Выемочно-погрузочное оборудование для разработки полусухих хвостохранилищ / Г.А.Холодняков, К.Р.Аргимбаев, Д.А.Иконников // Освоение минеральных ресурсов Севера: проблемы и решения. Воркута, 2011. Т.1.

Similar articles

Application of kalman filter for digital differential protection relay of power transformers
2012 D. I. Ivanchenko, O. B. Shonin
Methodological aspects of innovative-industrial clusters of mineral-raw specialization
2012 V. P. Skobelina, I. S. Tremasova
Conceptual aspects of declining extraction oilfields valuation methodology under conditions of stable development of national economy
2012 Yu. P. Grigorev, D. D. Chaikovskaya
Incentive resource conservation measures for underground gas storage facilities
2012 G. S. Elizarova
Physical and mathematical modelling of level- chamber method operational parameters at the bottom level of Gubkin mine
2012 Vladimir S. Litvinenko, E. I. Boguslavskii, P. V. Korzhavykh
Different approaches of assigning the danger range of slime and silt from oil refinery biological treatment unit
2012 K. A. Moiseeva