Submit an Article
Become a reviewer
Vol 195
Pages:
259-262
Download volume:
RUS
Article

Determination of the rate of bunker filling screw executive authority and power to cut costs

Authors:
E. A. Kremcheev1
A. V. Bolshunov2
D. O. Nagornov3
About authors
  • 1 — Ph.D. associate professor Saint Petersburg State Mining University
  • 2 — Ph.D. associate professor Saint Petersburg State Mining University
  • 3 — post-graduate student Saint Petersburg State Mining University
Date submitted:
2011-07-07
Date accepted:
2011-09-24
Date published:
2012-04-05

Abstract

Screw bunker executive body is designed to work on the peat deposits and can be used for the extraction of peat deposits from the drilling-out. The paper describes the design of screw bunker executive authority and proposed calculation of energy consumption for cutting.

Область исследования:
(Archived) Mining electromechanics and mining equipment
Keywords:
peat production the executive body drilling-out the power to cut
Funding:

None

Go to volume 195

References

  1. Batalov A.P. Calculation of loadings on walls of bunkers cylinder forms // Proceeding of mining Institute. Saint Petersburg, 2008. Т.178. P.31-34.
  2. Drilling tool for machine tool rotary buregiya // V.A.Peretolchin, N.N.Strabykin, Ya.N.Dolgun, Y.M.Koledin, E.V.Chudogashev, I.K.Vladimirtsev, J.P.Shemetov. Irkutsk, 1975. 204 p.
  3. Mihajlov A.V., Kremcheev E.A., Bolshunov A.V., Nagornov D.O. Perspektivy of development of new technologies of extraction of peat // Mining informational and analytical bulletin (scientific and technical journal). 2010. N 9. P. 191-192.
  4. Peretolchin V.A. The rotary drilling in quarries. Moscow, 1975. 128 p.
  5. Tikhonov N.V. Mining engineer. Moscow, 1960. 335 p.
  6. Filimonov N.A. Excavation and tunneling mining machines. Moscow, 1958. 428 p.

Similar articles

Mining complexes dismantling technologies at extraction of flat-lying thick coal seams with unstable rocks of the roof
2012 G. N. Karpov
Conception of mining and chemical company competitivness growth strategy creation
2012 A. A. Ilinova
Study of engineering-geological and microbiological factors for assessing the dynamics of fracture in tunnel highway Saint Petersburg – Kiev
2012 R. E. Dashko, K. V. Pankratova, A. A. Korobko
The distribution of late quaternary glacial-marine deposite on the norternmost part оf Novaya Zemlya shelf
2012 D. E. Dorechkina, P. V. Rekant, D. A. Korshunov, A. D. Portnov
The designing of the constructions of the pillar underground station with applying of the low-settle building technology
2012 A. G. Protosenya, P. A. Demenkov, M. A. Karasev, N. A. Belyakov, K. P. Bezrodnyi, V. A. Maslak
Possible solution for extraction of gas-bearing coal seams by highly productive mining complexes
2012 A. V. Leisle