Submit an Article
Become a reviewer
V. V. Kvitka
V. V. Kvitka
Ph.D., Dr.Sci.
director
MekhanobrʼCo
director, Ph.D., Dr.Sci.
MekhanobrʼCo
Saint-Petersburg
Russia

Co-authors

Articles

Article
  • Date submitted
    2011-09-28
  • Date accepted
    2011-11-25

Rationale for the development of the method of existing iron typetailing gully

Article preview

In the Russian Federation, about 40 % of tailings dumps are in operation GOK. The development of mechanized impossible, due to heavy water production, the stability of the dam breach and the possibility of a breakthrough. In this regard, the task of developing the existing tailings dumps will now increase the competitiveness of enterprises and reduce the cost of iron ore concentrate.

How to cite: Ekgardt V.I., Kvitka V.V., Kholodnyakov G.A., Argimbaev K.R. Rationale for the development of the method of existing iron typetailing gully // Journal of Mining Institute. 2012. Vol. 197. p. 159-164.
Article
  • Date submitted
    2011-09-17
  • Date accepted
    2011-11-23

The method of contact zone ore-waste rock optimum development

Article preview

The equation to calculate economic damage from losses and dilution of minerals is given in dynamic type. The optimum height of immixed rocks triangle on minimum economic damage from losses and dilution criterion is determined. The equation for determination of the optimum safety berm width when forming the final edge of an open pit is presented.

How to cite: Kvitka V.V., Fomin S.I., Kava P.B. The method of contact zone ore-waste rock optimum development // Journal of Mining Institute. 2012. Vol. 197. p. 165-168.