The method of contact zone ore-waste rock optimum development
About authors
- 1 — MekhanobrʼCo
- 2 — National Mineral Resources University (University of Mines)
- 3 — National Mineral Resources University (University of Mines)
Abstract
The equation to calculate economic damage from losses and dilution of minerals is given in dynamic type. The optimum height of immixed rocks triangle on minimum economic damage from losses and dilution criterion is determined. The equation for determination of the optimum safety berm width when forming the final edge of an open pit is presented.
References
- нормирования и учета потерь и разубоживания руды при разработке сложноструктурных месторождений // Недропользование – XXI век. 2006. № 1.
Similar articles
Formation of cracks in breeds of the face оf the chink under the influence of chisel cutters
2012 L. K. Gorshkov, V. G. Gorelikov
Anticipating of probable strains slope of coal strip mine «Chernigovets» at seismically impact
2012 A. N. Shabarov, S. V. Tsirel, B. Yu. Zuev, A. A. Pavlovich
Strategic management оf small innovative enterprises created at the university for the implementation of the results of intellectual activity
2012 V. A. Knysh, Yu. S. Fedorova
Extraction separation of aluminum, manganese and cerium group lanthanides by using oleic acid
2012 S. V. Zhukov, T. E. Litvinova, D. E. Chirkst