The method of contact zone ore-waste rock optimum development
About authors
- 1 — MekhanobrʼCo
- 2 — National Mineral Resources University (University of Mines)
- 3 — National Mineral Resources University (University of Mines)
Abstract
The equation to calculate economic damage from losses and dilution of minerals is given in dynamic type. The optimum height of immixed rocks triangle on minimum economic damage from losses and dilution criterion is determined. The equation for determination of the optimum safety berm width when forming the final edge of an open pit is presented.
References
- нормирования и учета потерь и разубоживания руды при разработке сложноструктурных месторождений // Недропользование – XXI век. 2006. № 1.
Similar articles
Stress state of entries support when stocks of ore mine Vostochny are developing by combined open-pit and underground method
2012 A. G. Protosenya, A. D. Kuranov
Geological risks insurance as an element оf the organizational and economic mechanism of increasing investment attractiveness оf the russian mineral resources base of scarce minerals reproduction process
2012 N. V. Pashkevich, V. S. Khloponina
Industrial scale influence on formation оf the structure and the development strategy of the company
2012 A. M. Makovskii, A. N. Gavrilov, M. M. Khaikin
Assessment of groundwater limitations in the context of Saint-Petersburg territory development
2012 V. V. Antonov