Submit an Article
Become a reviewer
Vol 197
Pages:
165
Download volume:
RUS

The method of contact zone ore-waste rock optimum development

Authors:
V. V. Kvitka1
S. I. Fomin2
P. B. Kava3
About authors
  • 1 — MekhanobrʼCo
  • 2 — National Mineral Resources University (University of Mines)
  • 3 — National Mineral Resources University (University of Mines)
Date submitted:
2011-09-17
Date accepted:
2011-11-23
Date published:
2012-05-25

Abstract

The equation  to calculate economic damage from losses and dilution  of minerals is given  in dynamic type. The optimum height of immixed rocks triangle on minimum economic damage from losses and dilution criterion is determined. The equation for determination of the optimum safety berm width when forming the final edge of an open pit is presented.

Go to volume 197

References

  1. нормирования и учета потерь и разубоживания руды при разработке сложноструктурных месторождений // Недропользование – XXI век. 2006. № 1.

Similar articles

Mathematic model of well cementation when constructing and operating of oil and gas wells
2012 Vladimir S. Litvinenko, N. I. Nikolaev
The method of analysis stress-and-strain state оf a rock massif with regard to nonlinear character of straining process
2012 A. P. Gospodarikov, M. V. Maksimenko
Rock-destroying tool development for ice well drilling
2012 Vladimir S. Litvinenko, N. I. Vasilev
Modern instruments of quantitative risk analysis and risk assessment of innovation projects
2012 N. G. Privalov, A. N. Kozlovskii, V. N. Petrov
Superdeep desiliconization aluminate solution based on calcium hydrocarboaluminates
2012 V. M. Sizyakov, E. S. Kononenko, E. V. Sizyakova
Influence of geological factors on the composition of foam agent for geological prospecting drilling
2012 Yu. D. Muraev