Rationale for the development of the method of existing iron typetailing gully
About authors
- 1 — Ph.D., Dr.Sci. general director VorkutaugolʼCo
- 2 — Ph.D., Dr.Sci. director MekhanobrʼCo
- 3 — Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
- 4 — post-graduate student National Mineral Resources University (University of Mines)
Abstract
In the Russian Federation, about 40 % of tailings dumps are in operation GOK. The development of mechanized impossible, due to heavy water production, the stability of the dam breach and the possibility of a breakthrough. In this regard, the task of developing the existing tailings dumps will now increase the competitiveness of enterprises and reduce the cost of iron ore concentrate.
Область исследования:
(Archived) Present-day problems of geomechanics, mining practice and innovation technologies in mining engineering
References
- Nurok G.A. Technology and layout of plan hydraulic mining. Moscow, 1965.
- Kholodnyakov G.A. Determining physical and mechanical properties of tailings of iron-bearing tailing dumps / K.R.Argimbaev, D.A.Ikonnikov // Mining informational and analytical bulletin. Moscow, 2011.
- Cheskidov V.V. Rationale for monitoring network technogenic the solid uses of the principles of cluster anal ysis // The problem of development of mineral wealth in the 21st century. Through the eyes of the young. Moscow, 2009.
Similar articles
The method of contact zone ore-waste rock optimum development
2012 V. V. Kvitka, S. I. Fomin, P. B. Kava
Diagnostics of continuous technological process based on fuzzy topological identification
2012 M. Yu. Shestopalov, Yu. A. Korablev
Anticipating of probable strains slope of coal strip mine «Chernigovets» at seismically impact
2012 A. N. Shabarov, S. V. Tsirel, B. Yu. Zuev, A. A. Pavlovich
Stress state of entries support when stocks of ore mine Vostochny are developing by combined open-pit and underground method
2012 A. G. Protosenya, A. D. Kuranov