Analysis of robust capacity wells of foamed cements
Authors:
About authors
- Ph.D., Dr.Sci. professor National Mineral Resources University (University of Mines)
Abstract
Evaluated conditions reliable capacity wells foamed cements in pavements, rock and a current analysis of the temperature field of concrete pavements rocks with varying temperature, which allowed to establish conditions of reliable fastening of wells and the effective application of these foamed cements do not require special technological receptions for drilling of concrete pavements.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
References
- GrjaznovG.S. Features of deep drilling of chinks in areas of the eternal froze breeds. Мoscow, 1969.
- KudryashovB.B., Yakovlev A.M. Dril ling of chinks in frozen breeds. Мoscow, 1983.
- MedvedovskyR.I. Building and operation of chinks on oil and gas in vech-nomerzlyh breeds. Мoscow, 1987.
- YakovlevA.A. Foamed and foamed cements (a complex th technology of drilling and fastening of chinks) / Saint Petersburg, 2000.
- MontmanR., Sutton D.L. Foamed portland cements / R.Montman, D.L.Sutton // Oil and Gas J. 1983. Vol. 89. No 20.
- RozieresS.D. Foamed cements characterization under downhole conditions and I-bz i mpact on job design // SPE Prog. Eng. 1991. Vol.3.
Similar articles
Legitimacies of flushing method formation by mechanically in the conditions of long-term frozen grounds
2012 S. A. Tolstunov, A. V. Montikov
The monitoring of gidrogeomehanical processes during the flooding of Angero-Sudgensk mines
2012 N. A. Kutepova, Yu. I. Kutepov, A. N. Shabarov
Engineering-geological ensuring for safety of mining work in water-inundated solid mass
2012 N. A. Kutepova, Yu. I. Kutepov, A. N. Shabarov