Mathematic model of well cementation when constructing and operating of oil and gas wells
About authors
- 1 — Ph.D., Dr.Sci. rector Saint Petersburg Mining University ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
- 2 — Ph.D., Dr.Sci. Professor Санкт-Петербургский горный университет ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
Abstract
In this article were shown research results connected with development of mathematical model of cementation in high-permeability rock at drilling and repair of oil and gas wells.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Funding:
None
Similar articles
Engineering-geological and geoecological principals of development activities for geological environment protection at underground construction
2012 I. P. Ivanov
The classification and quantitative assessment of innovation project risks
2012 Yu. A. Kulik, V. N. Volovich, N. G. Privalov, A. N. Kozlovskii
Superdeep desiliconization aluminate solution based on calcium hydrocarboaluminates
2012 V. M. Sizyakov, E. S. Kononenko, E. V. Sizyakova
Deep open pit walls design using rock mass stress-strained state
2012 S. P. Reshetnyak, Yu. V. Fedotova, S. N. Savchenko