Submit an Article
Become a reviewer
Vol 197
Pages:
9-14
Download volume:
RUS
Article

Mathematic model of well cementation when constructing and operating of oil and gas wells

Authors:
Vladimir S. Litvinenko1
N. I. Nikolaev2
About authors
Date submitted:
2011-09-16
Date accepted:
2011-11-22
Date published:
2012-05-25

Abstract

In this article were shown research results connected with development of mathematical model of cementation in high-permeability rock at drilling and repair of oil and gas wells.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
well drilling mud plugging slurry casing
Funding:

None

Go to volume 197

Similar articles

Plagioclase’s iridescent as mineralogical sign of pegmatites with large-crystalline muscovite (North Baikal muscovite province)
2012 M. A. Ivanov, A. P. Simakov
Restructuring of a company as a tool of a competitive growth under unstable economic conditions
2012 I. B. Sergeev, E. V. Viktorova
Geological risks insurance as an element оf the organizational and economic mechanism of increasing investment attractiveness оf the russian mineral resources base of scarce minerals reproduction process
2012 N. V. Pashkevich, V. S. Khloponina
The method of contact zone ore-waste rock optimum development
2012 V. V. Kvitka, S. I. Fomin, P. B. Kava
Structural approach to complex dynamic object fault detection and localization
2012 L. B. Poshekhonov, M. Yu. Shestopalov
Topical issues of russian mechanical engineering in condition of Russia’s transition to the innovation-driven economy
2012 A. M. Makovskii, D. P. Barsukov, M. M, Khaikin