Submit an Article
Become a reviewer
Vol 197
Pages:
9-14
Download volume:
RUS
Article

Mathematic model of well cementation when constructing and operating of oil and gas wells

Authors:
Vladimir S. Litvinenko1
N. I. Nikolaev2
About authors
Date submitted:
2011-09-16
Date accepted:
2011-11-22
Date published:
2012-05-25

Abstract

In this article were shown research results connected with development of mathematical model of cementation in high-permeability rock at drilling and repair of oil and gas wells.

Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Keywords:
well drilling mud plugging slurry casing
Funding:

None

Go to volume 197

Similar articles

Modern instruments of quantitative risk analysis and risk assessment of innovation projects
2012 N. G. Privalov, A. N. Kozlovskii, V. N. Petrov
Russian mineral companies under the condition of the world trade organisation functioning
2012 N. V. Pashkevich, A. A. Fedchenko, L. I. Iseeva
Diagnostics of continuous technological process based on fuzzy topological identification
2012 M. Yu. Shestopalov, Yu. A. Korablev
Integrated technology phosphogypsum processing conversion method with ammonium sulfate, phosphomel and new products
2012 V. M. Sizyakov, S. V. Nutrikhina, B. V. Levin
Industrial scale influence on formation оf the structure and the development strategy of the company
2012 A. M. Makovskii, A. N. Gavrilov, M. M. Khaikin
Microphotography of drilling foam as a means of expanding of information content in scientific research
2012 Yu. D. Muraev