Mathematic model of well cementation when constructing and operating of oil and gas wells
About authors
- 1 — Ph.D., Dr.Sci. rector Saint Petersburg Mining University ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
- 2 — Ph.D., Dr.Sci. Professor Санкт-Петербургский горный университет ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
Abstract
In this article were shown research results connected with development of mathematical model of cementation in high-permeability rock at drilling and repair of oil and gas wells.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Funding:
None
Similar articles
Anticipating of probable strains slope of coal strip mine «Chernigovets» at seismically impact
2012 A. N. Shabarov, S. V. Tsirel, B. Yu. Zuev, A. A. Pavlovich
Control of air quality during the building of underground construction
2012 V. L. Trushko, S. G. Gendler, A. A. Yakovenko
The method of analysis stress-and-strain state оf a rock massif with regard to nonlinear character of straining process
2012 A. P. Gospodarikov, M. V. Maksimenko
PRediction of spatial stress-strain double-track tunnels Frunzensky radius Saint Petersburg underground
2012 A. G. Protosenya, I. K. Suprun