Mathematic model of well cementation when constructing and operating of oil and gas wells
About authors
- 1 — Ph.D., Dr.Sci. rector Saint Petersburg Mining University ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
- 2 — Ph.D., Dr.Sci. Professor Санкт-Петербургский горный университет ▪ Orcid ▪ Elibrary ▪ Scopus ▪ ResearcherID
Abstract
In this article were shown research results connected with development of mathematical model of cementation in high-permeability rock at drilling and repair of oil and gas wells.
Область исследования:
(Archived) Present-day problems of geological exploration and well drilling
Funding:
None
Similar articles
Stress state of entries support when stocks of ore mine Vostochny are developing by combined open-pit and underground method
2012 A. G. Protosenya, A. D. Kuranov
Anticipating of probable strains slope of coal strip mine «Chernigovets» at seismically impact
2012 A. N. Shabarov, S. V. Tsirel, B. Yu. Zuev, A. A. Pavlovich
Acceptable risk assessment of production in mining industry
2012 A. N. Shabarov, G. I. Korshunov, E. G. Buldakova, Z. N. Cherkai
Topical issues of russian mechanical engineering in condition of Russia’s transition to the innovation-driven economy
2012 A. M. Makovskii, D. P. Barsukov, M. M, Khaikin